CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Preliminary CSC Trigger Results from September Testbeam
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin Acosta and Stan Durkin n On-chamber u Comparator ASICs for Cathodes (CFEB cards) – DONE. u ALCT Anode Trigger – almost done (~90%) n Peripheral-crate u TMB Trigger Motherboard – pre-production prototypes u MPC Muon Port Card – 2 nd generation prototype u CCB Clock & Control Board – 2 nd generation prototype n Track Finder crate in counting house u SP2002 Sector Processor – 2 nd generation prototype u CSC Muon Sorter – 1 st generation prototype u Backplane – 2 nd generation prototype

CSC Muon Trigger September 16, 2003 CMS Annual Review 2 CSC Muon Trigger Scheme CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB 1 of 5 Anode Front-end Board Cathode Front-end Board Anode LCT Board MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Peripheral Crate on iron disk (1 of 60) Trigger Timing & Control CSC Track-Finder Crate (1) Trigger Motherboard (9) DAQ Motherboard (9) Clock Control Board Optical link In underground counting room On detector Muon Portcard (1) EMU part: on-chamber nearing end of production, peripheral crate production > ESR in Nov. ‘03 TriDAS part: Second generation prototypes Trigger Primitives 3-D Track-Finding and Measurement Sector Processor (12) Muon Sorter (1)

CSC Muon Trigger September 16, 2003 CMS Annual Review 3 On-chamber CSC Trigger Electronics n Comparator ASICs – DONE. u Compare pulse heights from adjacent strips to find position of muon to ½-strip u channel ASICS on CFEB boards (OSU) n ALCT Boards – nearly DONE. u Finds tracks among anode hits, stores data for readout u 468+spares boards of 3 types (288-, 384-, 672-channel)

CSC Muon Trigger September 16, 2003 CMS Annual Review 4 CSC Peripheral Crates in UXC55 MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Clock Control Board (CCB) TRIG Motherboard (TMB) DAQ Motherboard (DMB) Crate Controller Muon Port Card (MPC)

CSC Muon Trigger September 16, 2003 CMS Annual Review 5 SP2002 (Main Board) Merged 3 SR2000s Optical Transceivers 16 x 1.6 Gbit/s Links Front FPGA TLK2501 Transceiver Phi Local LUT Eta Global LUT Phi Global LUT VME/ CCB FPGA To/from custom GTLP back- plane Data conversion: Receiver: Florida n 12 Used in CMS System

CSC Muon Trigger September 16, 2003 CMS Annual Review 6 SP Trigger Logic From SP2000 to SP2002 mezzanine card (5 manufactured) Xilinx Virtex-2 XC2V4000 ~800 user I/O Performs track-finding logic and P T assignment Florida

CSC Muon Trigger September 16, 2003 CMS Annual Review 7 GTLP BACKPLANE INTERFACE MEZZANINE CARD (same as SP design) LVDS DRIVERS AND SCSI-3 CONNECTORS Muon Sorter Rice n Sorts up to 36 muons from 12 SP’s and transmits best 4 to GMT n Have 4 boards in hand, one stuffed (except for backplane interface) n Sorter testing is in progress, will test with Track-Finder in the autumn n Only 1 needed in CMS

CSC Muon Trigger September 16, 2003 CMS Annual Review 8 CSC Test Beam Studies 2003 n First structured beam period May 23-June 1 u Trigger primitives tests were highly successful: l Verified peripheral crate electronics design for Nov. ESR u MPC-to-SP optical link data transfer unsuccessful (synch. problems) n Unstructured beam period June u Improved low- and high-rate CLCT and TMB studies, angle scans n Second structured beam period Sept u Patches to fix optical link data transfer from MPC to SP u New readout shell program (fully OO software)

CSC Muon Trigger September 16, 2003 CMS Annual Review Time-structured Beam Test Setup Peripheral Crate 2 DMB, 2 TMB 1 CCB, 1 MPC FED crate 1 DDU PC TTC crate DAQ Data Trigger primitives S1 S2 S3 beam CSC 1 CSC 2 Track finder Crate TRIDAS n X5A Setup

CSC Muon Trigger September 16, 2003 CMS Annual Review 10 CSC Bunch ID From ALCT Timing n First, tune the ALCT data latching in 2 ns intervals (0-32ns) and maximize the single-BX fraction of events: n Then look at the BX distribution relative to BX from scintillator (L1A): n ALCT BX efficiency 98.7%

CSC Muon Trigger September 16, 2003 CMS Annual Review 11 CSC Trigger High Rate Tests Expected LCT rate at LHC < 25 KHz (ME1/1) data consistent with dead-time = 225 ns Chamber #1 CLCT ,000 1,500 2, ,0001,5002,0002,5003,000 Beam Intensity (KHz) CLCT Rate (KHz)

CSC Muon Trigger September 16, 2003 CMS Annual Review 12 CSC Track Finder Test u Successfully passed optical link loopback tests and MPC  SP chain tests using 40 MHz crystal oscillator to drive system u MPC  SP optical link tests failed at the structured beam tests in May 2003 (link errors every few ms) u Clock was derived from TTC system (mi  vi  vx  rx) u Combined clock jitter presumably too large to drive optical links u PLL was not used to clean clock (i.e. QPLL was not available) Sector Processor 2 CSCs

CSC Muon Trigger September 16, 2003 CMS Annual Review 13 Additional 2003 Test Beam Results n (Later, unstructured beam period) n Very high efficiencies achieved u Highest trigger efficiency of 99.9% required low rate (few kHz) n Improved DAQ throughput allowed readout up to 80k full events per spill. Typical “run” is 1 or 2 spills. n Improved scans taken: u Logic scope read out on most data u HV scan u Comparator threshold scan u Pattern requirements scan u Angle scans bb

CSC Muon Trigger September 16, 2003 CMS Annual Review 14 Sector Processor Clock Patch Voltage Controlled Crystal Oscillator PLL Patch Low jitter Output Cleans Backplane clock to drive SP logic x2 BackPlane Clock supplies reference to TLK2501 LVDS Repeater Delivers Multiplied Clock to Front FPGAs to Drive TLK2501 clock input VCXO and PLL added to clean synchronous clock

CSC Muon Trigger September 16, 2003 CMS Annual Review 15 SP Patch Results ConditionsType of TestTimeErrors Patched CCB Clock, 100m fibers SP  SP loopback PRBS test 5 hours x 3 links0 “ MPC  SP PRBS test (within same TF crate) 24 hours x 3 links0 TTCvx with MHz XO Patch MPC  SP PRBS test (within same TF crate) 32 hours x 3 links0 “ MPC  SP PRBS test (peripheral crate to TF crate) with L1A 100kHz. 14 hours x 3 links0 n Eagerly awaiting QPLL chips from CERN

CSC Muon Trigger September 16, 2003 CMS Annual Review 16 Preparation for Sept Beam Test CSCs Scintillator Panels HV Supply CCB MPC DDU Dynatem TMB DMB SP CCB SBS TTCvi TTCvx Cosmic ray test stand in Florida System brought to working order (everything now shipped to CERN) TF Crate Periph Crate

CSC Muon Trigger September 16, 2003 CMS Annual Review 17 Conclusions n The CSC system is in very good shape: u Chambers being mounted on disks at SX5 u Majority of the chambers already built and tested, including on- chamber electronics u Test beam showed that CSC peripheral crate electronics work very well under “battle conditions” n Of course, much work remains: u We especially need to validate the optical link clocking for MPC-SP data transfer u Production starts soon for peripheral crate electronics u Production planning will start soon for Track Finder (MPC, SP, MS) boards