Small-Scale Solar Power Solar Power Rangers ~ Phillip Hicks 31 January 2008.

Slides:



Advertisements
Similar presentations
Leaders Meeting November 2 nd, Overview St. Marcus Lay Ministry Fair October UPDATE November Event/Volunteer Calendar 2010 Spring Programming Fundraiser.
Advertisements

(modified for the use of AgilEFant project and LC2.0. group by Touko Vainio-Kaila from the original slides of Jarno Vähäniitty) Helsinki University of.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
Small-Scale Solar Power Solar Power Rangers. Project Definition Small Scale, non-photovoltaic, 20 Watts at 12 V continuous. Small Scale, non-photovoltaic,
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Small-Scale Solar Power Solar Power Rangers ~ Rachel Paietta 10 April 2008.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 13 March 2008.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Small-Scale Solar Power Solar Power Rangers ~ Phillip Hicks 31 January 2008.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 7 February 2008.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Small-Scale Solar Power Solar Power Rangers ~ Rachel Paietta 28 February 2008.
The Home of the Future By: Kevin Myers Exterior Solar Panels
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
This DBA application features an advance 3 tab form with linked sub forms, multi- dependent dropdown lists along with dependent auto fill fields. It also.
For more info visit at For more info visit at
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
VendorVision Lender and Agent Module New Release Features June 9, 2015 H. Balogh, G. Gabe Confidential.
Updates, Best Practices & New Features Schedule of Classes Summer/Fall 2011.
What is PBIS Positive Behavior Intervention School – Students are rewarded for their positive actions Panda Bucks Focusing attention on positive actions,
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Pool Table Rental System for Aloha Lone Tree Technology, Inc. January 16th, 2004.
Small-Scale Solar Power Solar Power Rangers. Project Definition Small Scale, non-photovoltaic, 20 Watts at 20 V continuous. Small Scale, non-photovoltaic,
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
NB1S Add-ins for SAP Business One SAP BUSINESS ONE: SIMPLE YET POWERFUL A Presentation of Navigator’s.
Using Technology for Legacy and Major Donor Tracking Kevin Martone Technology Program Manager JCamp 180
Pegisys Diagnostic System Hands-On Training. 2 Goals Each Technician will gain the ability to operate the Pegisys at a comfort level to enable them to.
WEEK 1 You have 10 seconds to name…
Available Review Cycles Tokyo to Vienna Assumptions: ExC Review limited to 5 days Specification submitted for QR by 11/2 Editing/Integration limited to.
PPM & Service-now Reporting Guide October 3 rd, 2013.
Pearson Learningstudio Tools and Features Be sure to check out the notes view of these slides! Simply click the ‘Notes’ button below.
ATTENTION: SEMESTER EXAM INFO! January 27 Period 1- 7:55 to 9:10 am Period 2- 9:25 to 10:40 am Period 3- 10:55 to 12:10 pm Busses depart at 12:15 pm.
Foodbank App Now available for your Sheffield S6 Foodbank.
ABC Picture Find Rachel Davis. Instructions Find something in the pictures that start with each letter of the alphabet. The items can be colors, body.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Status Report #2 Zachary Luna Phillip Cox Dasola Alatise February 6th, 2012 A IR toilet adapter that allows the toilet to flush only when bathroom latch.
GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Human features are those things created by man.
FIN 324 Week 1 DQ 7 What is a Sub S type of business? To purchase this material click below link 324/FIN-324-Week-1-DQ-7.
Windows 7 Ultimate To Load Click Simulation PPSX
Elementary Particle Experiment Group
Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair
Sample Presentation. Slide 1 Info Slide 2 Info.
Callisto! By: Rachel
Capstone Project Team A is Joe Blow Willie Makeit Clem Kadidlehopper
Work Breakdown Structure Tasks and Sub-Tasks
Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones
Outline Format I. Heading 1 (Main topic)
Social Studies Leap Meeting
Public Works Standard Drawings Subcommittee Meeting
Calculus W 18 January 2012.
Calculus M 30 January 2012.
Calculus F 27 January 2012.
Presentation transcript:

Small-Scale Solar Power Solar Power Rangers ~ Phillip Hicks 31 January 2008

Previously Item 1 Item 1 –Action Sub action Sub action Item 2 Item 2 –Action Sub action Sub action

Currently Status: Status: –Go/NO Go On schedule? On schedule? –Show stoppers

Additional Info Feature 1 Feature 1 –Discussion Feature 2 Feature 2 –Point 1 Sub Point 2 Sub Point 2 Feature 3 Feature 3

Future Development Next Week 1 Next Week 1 –Action Next Week 2 Next Week 2 –Action Sub Action Sub Action

Questions The Solar Power Rangers are: Phillip Hicks, Kevin Kastenholz, Derek Lipp, Paul Nistler, and Rachel Paietta and Rachel Paietta