Victor Levesque U.S. Geological Survey Florida Water Science Center Tampa, Florida Documenting Regression Analysis for Index Velocity Ratings.

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

Business Planning using Spreasheets-2 1 BP-2: Good Spreadsheet Practice  There is always the temptation to rush in and start entering data.  However.
ENTRY OF FLOW MEASUREMENT DATA
Home Page The presentation will dissect each section of the Home Page.
ADCP Measurements: Laptop to NWIS via SWAMI
Science Fair Project 2015.
Science Fair Project Ask a question?  What do you want to investigate or figure out in the this lesson?  What will be the main question that will.
Maintaining Gage Datum: Levels at Gaging Stations.
1 Using Excel for Statistics Office 2010 and 2013.
Checkout of Grassed Waterways Beth E. Clarizia, P.E. Agricultural Engineer.
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
NAVIGATION SYSTEMS How using a “PATROL WORKSHEET” for a predefined Patrol Area will improve your report accuracy. Prepared by the First Northern Navigation.
Flood Recurrence Intervals and the 100 Year Flood Concept Bruce F. Rueger, Department of Geology, Colby College, Waterville, ME
Get Acquainted with the Latest Versions of LC & SMBA USGS, TRDI, and SonTek Versions David S. Mueller, OSW April, 2013.
Spreadsheets and Non- Spatial Databases Unit 4: Module 15, Lecture 2- Advanced Microsoft Excel.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Stage – Discharge Rating Numerical relationship between water elevation (stage) and discharge at a location in a flowing system. Expressed as an equation,
Tutorial Excel and Equation Editor Given the following measurements of mass flow rate in a water pipe and the following properties and relationships: K=
HEC-RAS.
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
Principle of Index-Velocity Method and its Application Randy Marsden Teledyne RD Instruments.
1 Determining How to Calculate River Discharge HOW MUCH WATER IS FLOWING IN THE RIVER? Quantifying discharge gives us an understanding of the hydrologic.
SPSS 1: An Introduction to the Statistical Package SPSS Suzie Cro MRC Clinical Trials Unit.
NEES Central Goran Josipovic IT Manager
Module 10/11 Stream Surveys Stream Surveys – February 2004 Part 3 – Hydrologic Assessment.
Pasewark & Pasewark 1 Access Lesson 6 Integrating Access Microsoft Office 2007: Introductory.
“We Bring Engineering to Life” 3-D Stream Restoration Design, Monitoring and Beyond David Bidelspach, PE - Stantec Consulting Greg Jennings, PE – NCSU.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
Central Valley Regional Data Center Field Data Entry Training.
IB Internal Assessment Design. Designing an Experiment Formulate a research question. Read the background theory. Decide on the equipment you will need.
The Project – Spreadsheet Design. The following is the high mark band for the spreadsheet design: The candidate has Analysed a given data set and designed.
ACCRETION QA/QC Protocols Dona Weifenbach, LDNR/CRD LFO Plot Layout Data Recording Data Entry Reporting Deliverables.
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
Results Section for CMV
LC and SMBA Updates Office of Surface Water Hydroacoustics Webinar January 6 and 9, 2008 David S. Mueller.
IT133 Software Applications
MA BF REFERENCE CURVES Objective Develop bankfull regional curves and equations for estimating bankfull width, mean depth, cross-sectional area, and discharge.
DLI Training April 2004 Kingston Ontario. DDI What, Why, How?
Northeastern Regional Information Center Financial Services 1031 Watervliet-Shaker Road Albany, NY November 2001.
Data Presentation & Graphing Introduction to Mechanical Engineering The University of Texas-Pan American College of Science and Engineering.
Introduction to Excel Line Graphing The ‘Quick’ and ‘Easy’ guide to using Microsoft Excel for Line Graphing * Created by: Bunch of BHS science teachers.
1 Performing Spreadsheet What-If Analysis Applications of Spreadsheets.
Spreadsheets and Non- Spatial Databases Unit 4: Module 15, Lecture 1- Spreadsheet Software.
Science Project Type your project title here Your name Mueller Park Junior High You are welcome to choose any design style for your project!
Software Project Planning Defining the Project Writing the Software Specification Planning the Development Stages Testing the Software.
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
Computer Science Project Criteria. Computer Science Project The project is intended to simulate the analysis, design, progamming and documentation stages.
March 2003HEC-RAS Version 3.1 Other Features of HEC-RAS- part 2 Cross Section Interpolation Multiple Plans Supporting Pictures.
Graphical Analysis in Excel EGN 1006 – Introduction to Engineering.
CERTIPORT EXCEL PRACTICE. EDITING SORT/FILTER/FIND & REPLACE In the Summary worksheet, sort the data in descending order by Order Number, and then in.
Do Now Find the domain & range:. Answers to Homework
SPSS- Tutorial The following power-point slides show you how to use some of the features in SPSS. A survey of 20 randomly selected companies asked them.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Creating Analysis Files: Description of Preparation Steps.
Basic Hydrology: Gauge Analysis. Gage Analysis Gage analysis is use of historical records to construct a frequency curve for a gauging station. This frequency.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Engineers often: Regress data to a model  Used for assessing theory  Used for predicting  Empirical or theoretical model Use the regression of others.
1 Using Excel for Statistics in Gateway Cases Office 2007 & 2010.
Statistical Analysis with Excel. Learning Objectives Be able to use the Dial Caliper to measure Be able to use Microsoft Excel to –Calculate mean, median,
1 Using Excel for Statistics in Gateway Cases. 2 Concepts Covered Statistics - Descriptive Statistics - Scatter Plots - Histograms - Regression Analysis.
Project Planning Defining the project Software specification Development stages Software testing.
Why use Index-Velocity Methods? Traditional Sites – Stage vs Discharge is predictable.
Graphing Data: Information Data Table: a way to organize data in columns so it is neat and readable Title: a brief way to describe the content of a book,
Science Fair Project Type your project title here Your name Your teacher’s name Your school.
Spreadsheet I n Concepts & operations. Concepts n Workbook: Excel file n Worksheet: sheet n Row: 1-???? n Column: A - Z, AA - ?? n Cell n Cell address.
Project 1 to 3. Project 1 (10 pts) (use the word document to enter results and answers – Save this file as Lname_BUA350_Cohort#_projects#.doc Go to Total.
Hydraulic Culvert Design and HY-8
Advanced Higher Computing Science
Sinclair Wash Stream Restoration Feasibility Study
Spreadsheet Engineering
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Presentation transcript:

Victor Levesque U.S. Geological Survey Florida Water Science Center Tampa, Florida Documenting Regression Analysis for Index Velocity Ratings

Overview Data required for the rating (Stage-area and Index velocity) What to collect and what to keep Assembling and Documenting the data Examples Rating documentation (Stage-area and Index velocity) Assembling and Documenting the data What information is needed Examples

Two Ratings Stage-to-area Index-to-mean velocity Q = VA

Stage-to-Area Rating Collect cross-section survey and water level data Assemble data Document data and results Create and document a stage-area rating

Data Collection  Standard cross-section  Clearly mark cross-section in the field and document in the rating  Include a site sketch  Include distances  Document survey method  Identify water level data and datum Index Sensor Standard cross-section Flow direction Oak tree on left bank. Orange X on trunk. 20 feet upstream 150 feet Large rock with orange X

Important items to remember Cross section must be referenced to stage Survey past the maximum expected stage You should routinely check for channel changes Every year for first three years If there is a departure in the index velocity rating After a high flow event Use the same cross-section for resurvey Data Collection

Assemble the Data Data can be input to a spreadsheet Describe how and where data were collected Label all columns Include times and time datum Include water level data measured during the time of the survey Include a site sketch

\\FloridaFL-S\Projects NWIS Management Station Information GW 25xx DCP Programs Levels Summary Pictures SIMS 30xx SW 25xx30xx DCP Programs Levels Summary Pictures SIMS Historical WY WY2008 WY2007 Current WY WY2010WY2009 GW 25xx EDL Inspections Levels Station Analysis Station Description Water Quality 30xx SW 25xx30xx EDL Inspections Levels Measurements Ratings Station Analysis Station Description SWReview Velocity Water Quality Go2 PlotsSwami Scripts

Stage-Area Rating - Poor Example

Limited Documentation

Stage-Area Workbook

Where, when, who How data were collected and what are the data Details

Plot the Cross-Section

Cross-section corrected to WS elevation

Input Data to AreaComp AreaComp USGS program for the purpose of attaining cross sectional area Can use data tables or WinRiver ASCII files Provides output for stage and area

Generate a Stage-Area Rating Save all output from AreaComp Include data in Rating Workbook

Stage-Area Rating final worksheet

Documenting the Stage-Area Rating How were data collected and transformed? What data were used to create the rating? Documentation to describe how the rating was developed Leave no doubt as to how, what, and why the rating was developed

Index Velocity Rating Collect calibration data Discharge Stage Index Velocity (RangeAvg X,Y, Z, Multi-Cell X,Y,Z) Assemble data Document data Perform Regression Analysis Identify and Document Selected Rating

Collect Calibration Data Synchronize all data sensor times Configure index velocity and stage sensor data collection interval Save and document all data

Assemble the Calibration Data Discharge measurements Dates, start and end times, and total discharge Stage Dates, times and stage Index Velocity Dates and times RangeAvg X,Y,Z, Multi-Cell X,Y,Z, depth Index Velocity Configuration

Rating Analysis Documentation Label all data columns Include information about the data Rearrange the data columns as necessary Synchronize and Synthesize Data Create an organized data table Perform regression analysis Select appropriate rating

Discharge Data Worksheet

Stage Data Worksheet Free Excel Interpolation Add-In available:

Index Velocity Data Worksheet

Synchronize and Synthesize Data

Synchronization and Synthesis

Create an Organized Data Table

Add Variables

Exploratory Data Analysis Plot with Measured-Mean Velocity (y-axis) Index velocity (X, Y, Z, multi-cell X,Y,Z) Stage

Index Velocity

Stage

This is NOT Regression Analysis

Inadequate Documentation

Index-to-Mean Velocity Regression All Data

Regression Analysis continued

Select Appropriate Rating

Check the Rating

Regression Analysis

Rating Summary

Summary  Collect and document data  Carefully assemble and identify data  Maintain good notes  Perform thorough analysis  Clearly identify the final rating and provide information for the selection  Leave no doubt as to how, what, and why the rating was developed

Questions?