GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 W. N. Johnson / P. Carosso 1 LAT Calorimeter Subsystem W. Neil Johnson Calorimeter.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 E. Grove Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Advertisements

The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 S. Ritz 1 GLAST Large Area Telescope: Instrument Design Steven M. Ritz Goddard.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 J. Ormes/R. Larson 1 ACD Subsystem Jonathan F. Ormes ACD Subsystem Manager.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Annual Program Review, April 9-11, 2003 W. Althouse LAT-PR GLAST Large Area Telescope: LAT Project Status W. Althouse.
1 Gamma-Ray Astronomy with GLAST May 24, 2008 Toby Burnett WALTA meeting.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
Particle Physics and Astrophysics (PPA) Mechanical Engineering Ken Fouts.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 W Neil Johnson 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
Introduction to gamma-ray astronomy GLAST-Large Area Telescope Introduction to GLAST Science New way of studying astrophysics Schedule of GLAST project.
GLAST:Gamma Ray Large Area Telescope
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
The GLAST Large Area Telescope – Design, construction, test and calibration Luca Latronico (INFN-Pisa), Gloria Spandre (INFN-Pisa) on behalf of the GLAST.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST The Gamma-ray Large Area Space Telescope Status of the Mission F.Longo see
GLAST Large Area Telescope (LAT) Overview Peter F. Michelson Instrument Principal Investigator Stanford University William E.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
Bill Raynor Naval Research Lab
Calorimeter Subsystem of GLAST Large Area Telescope
WBS 1.03 Readout Systems Scope, Cost and Schedule
Performance of the Calorimeter of the GLAST Large Area Telescope
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
Presentation transcript:

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 1 LAT Calorimeter Subsystem W. Neil Johnson Calorimeter Subsystem Manager Paolo Carosso Calorimeter Project Manager Space Science Division Naval Research Laboratory

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 2 LAT Calorimeter Subsystem Outline  Participating Institutions  Technical Description and Requirements  Status  Organization and WBS responsibilities  Schedule  Milestones  Cost Summary  Key Issues and Concerns

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 3 Calorimeter Hardware Team  Naval Research Laboratory (NRL), Washington DC –Overall scientific and management lead –System engineering & performance assurance –Electronics –Software –Integration, test, and calibration  Stanford Linear Accelerator Center (SLAC), Stanford, CA –ASIC design and development –Electronics oversight  Commissariat à l'Energie Atomique / Direction des Sciences de la Matière, Département d'Astrophysique, de Physique des Particules, de Physique Nucléaire et de l'Instrumentation Associée (CEA/DSM/DAPNIA), Saclay, France –Management, France –PIN Photodiodes –LAT Power Supplies  Centre National de la Recherche Scientifique / Institut National de Physique Nucléaire et de Physique des Particules (IN2P3) – 3 Laboratories –LPNHE, Ecole Polytechnique - Lead, mechanical structure & optical performance, assembly and test –PCC, Collège de France - CsI detector elements, Simulations, Software –CENBG of Université de Bordeaux - ASIC Test Bench, Beam Test support and analyses  Royal Institute of Technology (KTH) and Stockholm University in Stockholm, Sweden –CsI Crystals and acceptance testing

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 4 Large Area Telescope (LAT) Design Overview 16 towers  modularity height/width = 0.4  large field-of-view Si-strip detectors: 228  m pitch, total of 8.8 x 10 5 ch. hodoscopic CsI crystal array  cosmic-ray rejection  shower leakage correction X Tkr + Cal = 10 X 0  shower max contained < 100 GeV segmented plastic scintillator  minimize self-veto > efficiency & redundant readout Instrument Tracker Calorimeter Anticoincidence Detector Shield 3000 kg, 650 W (allocation) 1.75 m  1.75 m  1.0 m 20 MeV – 300 GeV

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 5 Calorimeter Module Concept Each Module  8 layers of 12 CsI(Tl) Crystals –Crystal dimensions: 27 x 20 x 336 mm –Hodoscopic stacking - alternating orthogonal layers  Dual PIN photodiode on each end of crystals.  Mechanical packaging – Carbon Composite cell structure  Electronics boards attached to each side.  Electronic readout to connectors at base of calorimeter.  Outer wall is EMI shield and provides structural stiffness as well. Modular Design 4 x 4 array of calorimeter modules

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 6 Calorimeter Technical Challenges  Imaging calorimetry to support background rejection and improve energy measurement via shower profile correction or leakage estimation. –Hodoscopic arrangement of CsI crystals, 8 layers of 12 crystals –Longitudinal positioning in individual crystals using light asymmetry measurements at each end of crystal  Large dynamic range ( ~5 x 10 5 ) with low power electronics –Divide signal into two ranges using dual PIN Photodiode of differing areas –Custom CMOS ASIC front end electronics  Minimize passive material and gaps in active material caused by modular design, yet survive 7g launch loads. –Carbon composite structure with individual cells for each CsI crystal. –PIN diode readout via PCB on four sides of module. –EMI/structural outer wall.  Low dead time (< 20 usec), low power spectral measurements over full energy range. –Dedicated ADC for each CsI crystal end –COTS low-power successive approximation ADCs  In-flight calibration –Use cosmic rays (p – Fe)

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 7 Beam-Test Prototype Calorimeter Assembly

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 8 Derived Calorimeter Requirements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 9 Calorimeter Design Status  Full scale prototype designed and fabricated as part of NASA Advanced Technology Development (ATD) Program –Tested in SLAC Beam Test, Dec 1999 – Jan 2000 –Tested in GSI Beam Test (C, Ni beams), July 2000 –Refurbished for Suborbital flight, planned June 2001  Current design builds on ATD prototype with significant changes: –Mechanical design is based on carbon composite cell structure proposed by IN2P3, based on CMS concepts and experience –Electronics designs and interfaces have been modified to reflect the LAT-wide trigger and data flow concepts and communications protocols –Design and fabrication responsibilities were redistributed to include major contributions from collaborators in France and Sweden  As a result –The optical and mechanical performance characteristics of the new mechanical packaging concept are in progress –The analog front end ASIC design was delayed for two years. The work has recently been transferred from France to SLAC. –Restructuring of the responsibilities and the French management requires a re- definition of the baseline schedule and costs.

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 10 Design Status (cont)  Mechanical Structure –Prototype fabricated and populated with dummy crystals for vibration testing. Vibration testing complete. –Optical properties of structure coating and possible crystal wrappings have been studied.  Crystal Detector Elements –CsI Crystal procurement has been advertised, 3 bids have been received for 1 st crystals delivered by May ’01. –PIN Photodiode specification is complete for engineering model prototype diodes. –Light yield studies completed for various wrapping materials. –PIN diode bonding tests – epoxies and silicone elastomers have been tested. –Baseline design uses silicone elastomer bond stabilized by external frame that is epoxied to CsI crystal – tests beginning.  Electronics –Test structures for analog front end ASIC are under test. –1 st submission of fully functional ASIC scheduled for March. –Radiation testing (SEU, SEL) of COTS ADCs has identified two potential ADCs.

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 11 Calorimeter – Institutional Organization

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 12 Calorimeter – WBS Organization

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 13 Calorimeter Module Assembly 18 Identical Calorimeter Modules:  2 Calibration Units (Flt spares)  16 Flight Units

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 14 Calorimeter Key Documentation Status

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso Calorimeter

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 16 Schedule Milestones  Calorimeter (CAL) Requirements Review03/14/01  Interim Subsystem Review02/28/01  Interim Subsystem Review06/29/01  Calorimeter PDR07/11/01  LAT Instrument PDR08/06/01  Engineering Model (EM) assembly complete04/01/02  Calorimeter CDR06/05/02  EM Test complete06/28/02  LAT Instrument CDR08/05/02  Qual Modules A & B Ready for Integration (calibration unit)05/15/03  Flight Modules 1 & 2 Ready for Integration (calibration unit)08/01/03  Flight Modules 3 – 16 Ready for Integration 10/01/03 – 12/24/03

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 17 Interim Calorimeter Cost Estimate* (Escalated K$) *DOE/NASA funding.

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 18 Issues  Delays in committing to and implementing MoA and International Agreement are impacting schedule –NASA now moving forward with International Agreement (CNES); MoA is ready for signature; CAL Implementation Plan being developed –Hardware responsibilities have been re-allocated and French management and staffing is underway –Frequency of technical exchange to increase: series of face-to-face meetings scheduled and committed to; focus on finalizing Implementation Plan  Establishing baseline performance by PDR –Accelerated fabrication and testing of prototype PEM structure –Accelerated PIN diode specification and prototype procurement  Optical bond of PIN diode to CsI crystals –Issue is degradation of optical quality of bond through temperature cycling –Hard epoxies have failed – LAT prototype and ESA’s Integral Pixit instrument –Aggressively investigating silicone elastomeric pads and soft epoxy solutions  Qualification of COTS ADC –Speed and power requirements essentially require COTS (commercial off the shelf) successive approximation CMOS ADCs. –Testing 5 different COTS parts from Burr Brown and Maxim. SEL measurements on two Maxim parts are encouraging –SEU testing at Brookhaven will occur in March.  Fabrication, test, calibration and delivery schedule for 16 flight modules. –Delivery rate represents schedule risk; will work closely with LAT IPO to optimize overall schedule