Worldwide testbeam session summary Felix Sefkow DESY ECFA workshop Durham September 4, 2004.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Operations, Test facilities, CF&S Tom Himel SLAC.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
R Frey SLUO P61 LC Detector R&D, SLAC, and SLUO… pre-P5 meeting R. Frey, University of Oregon Detector R&D will have a huge positive impact on the physics.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Test Beam: Calorimetric Wishes… Steve Magill, Jose Repond, Andre Turcot, Jae Yu* Jan. 10, 2003 Goals for calorimeter test beam What’s needed for EFA? Requirements.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
I nstrumentation of the F orward R egion Collaboration High precision design ECFA - Durham2004 University of Colorado AGH University, Cracow I nstitute.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Final CALICE OsC meeting: Status and summary of project
Test Beam Request for the Semi-Digital Hadronic Calorimeter
IP Beam Instrumentation R&D and Testbeams for the ILC
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
Testbeam plans for LEP instrumentation
Status of Ecal(s) for ILD
Testbeams for Simulation
(My personal) CALICE Report
ScECAL+AHCAL+TCMT Combined Beam FNAL
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
A summary of world-wide test beam facilities
Technical Board – DCAL Software
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
Calice Tile-HCal and Tail-catcher/Muon Tracker
IPBI-TN R. Arnold (with help from T. Fieguth)
LC Calorimeter Testbeam Requirements
Perugia SuperB Workshop June 16-19, 2009
International Tracking Testbeam Needs
Presentation transcript:

Worldwide testbeam session summary Felix Sefkow DESY ECFA workshop Durham September 4, 2004

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 2 Session goals Had half day session at LCWS in Paris on TB needs and facilities Situation documented in “Worldwide LC testbeam” report – testbeam/wwlctb_working_group.doc Here: get an updated overview of planned testbeam efforts Launch activity to submit internationally coordinated proposal for testbeams for LC detector R&D Prepare statement for ICFA to alarm lab directors of our concern that testbeam supply will not need our demands

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 3 Outline Summary of summaries: Demand Supply Initiatives

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 4 Testbeams for calorimeter R&D

5 Geant4 hadronic shower models. GEANT4 has extensive set of hadronic shower models, from which we would like to select. GEANT4 has extensive set of hadronic shower models, from which we would like to select. Several experiments have compared testbeam data with Geant4 predictions. Several experiments have compared testbeam data with Geant4 predictions. However, used to characterize existing designs, not to design new detectors. However, used to characterize existing designs, not to design new detectors. “Particle Flow”, or imaging calorimeter, places much more stringent requirements on simulation. “Particle Flow”, or imaging calorimeter, places much more stringent requirements on simulation. Cottage industry to run all available sets to demonstrate dispersion. Cottage industry to run all available sets to demonstrate dispersion. See talks in simulation session. See talks in simulation session. Norman Graf, SLAC

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 6 Hadronic shower model dependence Remember: need to optimize imaging capability of HCAL Study by G.Mavromanolakis

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 7 Calorimeter testbeam needs 10 8 – 10 9 events = (10 – 100) days / duty_factor 100 Hz DAQ rate)

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 8 CALICE testbeam plans

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 9 LCcal beam needs Left over: more hadron data scan different gains in pad electronics combined test with Hcal Calorimeter re-arrangment (including W absorber) Beam time: at least one week e/h beam GeV Problem: time and manpower Possible solution: join efforts with other groups SUMMARY after 2003 runs Paolo Checchia, Padova

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summary 10 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U. Colorado, Fermilab Hybrid silicon/scintillator – tungsten U. Kansas Ray Frey, Oregon

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summary 11 Si/W Status and Plans Note that current design is optimized for warm, but could be optimized for cold  Would require digital pipeline → this is current focus  Would timing still be desirable? This year  Qualify prototype detectors already in hand  Fabricate initial RO chip for technical prototype studies Readout limited fraction of a wafer ($) (64 of 1024 chns.) Chips probably not in hand before Jan  Electronics evaluations  Bump bonding  “Technical” test beam, summer 2005 at earliest A few layers with 1 st round detectors and chips  Plan for a full ECal module (similar to eventual ECal) Finalize thermal plans, mechanics Provide correct front radiator for hadron shower validation in test beam. Earliest beam test: Summer 2006  Continue to evaluate configuration options Layering, segmentation What people often neglect… Ray Frey

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summary 12 Tile ECal (contd.) (from Uriel Nauenberg) Will be ready for test beam in 2006 if funding becomes available in 2005 to build a module. The big issue is electronics; we have very little help with that. The module will consist of 60 layers or 45 layers  For 11%/root(E) resolution we need 60 layers of 1/2 X0 Tungsten and 2 mm of scintillator, not 45.  For 13%/root(E) then we can go with 45 layers of 3/4 Xo and 3 mm scintillator; (Investigating the spatial resol. deterioration.) Usual disclaimer

13 ECAL R&D; Tungsten ECAL with both Si and Scintillator sampling Concept: physics requires high granularity, reasonable sampling frequency, large BR 2, compact R M. => ECAL probably should be W absorber, some Si, some cheaper sampling medium (Scint.). All Si is probably best IF it can be cost-effective, IF timing is not important (less so now!), and IF really large R is not dictated by the physics. All Scintillator is probably prohibitively expensive due to channel count at sufficient granularity Ongoing R&D: mostly simulation based on different design possibilities –EM energy and angular response studied –Photon/hadron separation in progress –Critical items Does coarse scintilllator granularity work for a hybrid ? Gap size (compactness) Test-beam Wishes & Goals: –could validate the EM response of hybrid ECALs with mixed sampling media Eg. Anti-correlation predicted in Si and Scint. response –In collaboration with existing groups encourage that data taking opportunities with large volume HCALs and expensive Si-W ECALS can also be used to explore alternative ECAL designs to Si-W Ideally gaps eg. alveoli in the CALICE ECAL could be used to study alternative sampling layers. A hanging-file type approach would facilitate understanding the intrinsic response (but not an engineered hermetic solution …) –Have funds available which can contribute significantly to a prototype ECAL construction and testing on a 2-year time- scale. Envisage wanting electron, pion beams in summer 2006 Concurrent running with HCAL activities –Exactly how to proceed depends on developing collaborations and results of simulation studies (want to use test-beam time and construction funds wisely) Graham W. Wilson for Kansas, Kansas State Universities Ray Frey

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 14 Asian plans Updates since Paris: –Still expect KEK PS runs in 2005 –J-PARC from 2008 onwards –KEK linac 2006 onwards Pb Sci TB finished, now new Huge detector design New W Sci ECAL with SiPMs Testbeam 2006 onwards Participate with Tsukuba drift chambers in CALICE TB at DESY

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 15 Muon and Tail Catcher (V.Zutshi, NIU) Vigorous R&D for a muon detector which could also serve as a tail-catcher underway in gas and scintillator technologies. All proponents are working towards exposing their prototypes to a test beam in the period. Expecting increased coordination between groups as the test beam becomes a reality.

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 16 Tracking / Vertexing (B.Schumm, Santa Cruz) A: TPCs need B > 0, but Tesla sufficient for most studies International tracking group anticipates testbeam needs beginning in late 2004 Very rough guesstimate is weeks of facilities time between now and beginning of 2006 Need for high-field magnet on test-beam line is an open question. UCSC has addressed this for Si; what about others techonolgies? Most-requested beam is few GeV hadrons or muons

M. Woods, SLAC ECFA ILC Study, Sept Outlook on IPBI IP Beam Instrumentation is a critical aspect of the Machine-Detector Interface. IPBI should be considered as one of the Detector subsystems – measurements of luminosity, energy, polarization (and electron ID at small polar angles for 2-photon veto) are critical for the ILC physics program. IPBI R&D Efforts are well underway in all 3 regions. There is an identified and growing need to develop prototypes, which need access to test beam facilities. At SLAC, a Letter-of-Intent for LC Beam Instrumentation Tests in ESA was submitted to SLAC in Fall 2003 and presented to the SLAC EPAC. Response from the EPAC and the SLAC Director was very positive. First 3 Test Beam Requests have been submitted to SLAC and cost estimates have been made. Requesting a run in June Currently waiting for SLAC response as we go thru evaluation of SLAC’s efforts for ILC (I expect a positive response) 

M. Woods, SLAC ECFA ILC Study, Sept First IPBI Beam Tests Proposed to SLAC 1.Energy BPMs (T-474 submitted) U. of Notre Dame, UC Berkeley, UC London, U. of Cambridge, SLAC - Mechanical and electrical stability at 100-nm level - BPM triplet at z = 0, 2.5 and 5.0 meter spacing. BPMs 1 and 3 define straight line. Monitor BPM2 offset over time scales of minutes, hours - 2 adjacent BPMs to test electrical stability, separate from mechanical 2.Synchrotron stripe diagnostics (T-475 submitted) U. of Oregon, SLAC - test chicane scheme with wiggler magnet - characterize detector (quartz fiber / other) performance and capabilities 3.Pair detectors (T-476 submitted) Molecular Biology Consortium, U. of Hawaii, Tohoku U., Brunel U., CERN - use “spray” beam of ~ 4-GeV electrons to mimic pair background - test speed (at nano-second level) of both 3-d and planar Si - characterize detector response to “pair background”; can vary spray beam energy and absorber thickness in front of detector plane - use MonteCarlo to superimpose 250 GeV electron to determine electron id efficiency

M. Woods, SLAC ECFA ILC Study, Sept Other IPBI Beam Tests Possible in ESA 1. IP BPMs (necessary for fast inter-train and intra-train feedbacks) - Sensitivity to backgrounds, rf pickup - Mimic LC geometry, including fast signal processing (but no feedback) - Sample drive signal to kickers 2. Tests with short bunches (~  m possible) - EMI for beam instrumentation or Detector electronics - collimator wakefield tests 3. Single Particles (electrons, photons, pions) GeV particles with 1 or less particles/bunch at 10Hz for LC Detector test beams 4. Fixed target to mimic beamsstrahlung and disrupted beam - for synchrotron stripe energy spectrometer - for IP BPM tests 5.IR Mockup - Mimick beamline geometry at IP within +-5 meters in z and Prospects less clear for these five

A summary of world-wide test beam facilities Erik J. Ramberg FNAL 4 Sept. 2004

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summary 21 A list of available facilities with multi-GeV beam FNAL -  p: GeV: available 2004-on SLAC - e,  1-30 GeV: available 2004-on DESY – e: 1-7 GeV: available CERN – e,  p: (PS) 1-15 GeV: (SPS) GeV: likely available 2006-on IHEP (Protvino, Russia) – e,  p: 1-45 GeV: available See “Report on WorldWide Linear Collider Test Beam Effort”:

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summary 22 General Impressions of Test Beam Facilities DESY: Probably the best place for low energy (< 6 GeV) electrons IHEP: Can get to higher energies for electrons. Good general purpose beam. Limited availability during year. CERN: excellent all around beams. Limited availability during year. Unknown future. SLAC: Excellent for accelerator component testing. Secondary beams for detector testing are good but have low rate. FNAL: Good availability with general purpose beam. Probably have to share with other users. Electrons are problematic. 2x 1 month Could be improved, would need investments

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summaryTB Strategy J. Yu 23 Competition on facilities from other then LC community is significant Funding situation in the regions are not all ideal –European and Asian communities seems to have better support for detector R&D and TB than North American Need to coordinate within the LC community to meet all the TB needs in a most optimal manner We are in this together so we need to work together as one entity Jae Yu:

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summaryTB Strategy J. Yu 24 Strategy and Time scale For calorimeter there are two facilities that could meet most the needs –FNAL – MTBF –IHEP, Protvino FNAL directorate willing to work with our community Have our primary contact person at Fermilab (E. Ramberg) Let’s shoot for FNAL first –FNAL Fall PAC meeting: Nov. 12 – 14, 2004 “first” means: will soon be happy to make use of all suitable resources

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summaryTB Strategy J. Yu 25 Strategy and Time scale, cnt’d Write a world-wide TB proposal ( or MOU if you like) to Fermilab directorate –Starting with Calorimeters in all regions –Including other detectors that would be ready – We could build this upon existing efforts and expand to integrate activities world-wide A workshop for this proposal planned: Sept. 23 and 24 at ANL –A focused group of people from all regions to write the proposal Submit the proposal to Fermiab directorate by Oct. 10 for a possibility of PAC review and endorsement –Request help to our leadership for this Turn this into a U.S. NSF MRI proposal for North American TB equipment support

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summaryTB Strategy J. Yu 26 TB One Page Executive Summary Introduction for TB needs –LC Physics as detector challenge –Novel technologies and approach to meet this –Technology decision giving momentum and setting time-scale –Detector concept studies and eventual TDR require serious TB efforts NOW –Many detector R&D are mature for test beam Primary goals for TB experiments –Testing of novel technologies and algorithms –Bases for conceptual detector design choices –Simulation verifications and enhancements

ECFA LC workshop, Durham, Sept 2004 Felix Sefkow, Worldwide testbeam session summaryTB Strategy J. Yu 27 TB One Page Executive Summary, cnt’d Current and anticipated TB programs –Requirement for facilities  Particle species and momentum ranges –CALICE and other calorimeter efforts –Other detector needs –Total coordinated beam time requests Current situation in facilities –Limitations in number of facilities that can meet the needs Existing facilities can meet the need in principle –Availability and scheduling Recommendations and requests –Request the lab directors to recognize the LC TB effort and adjust the priority to meet our needs –Request strong resource support from laboratories –Request endorsement for necessary funding

ECFA LC workshop, Durham, Sept 2004Felix Sefkow, Worldwide testbeam session summary 28 Summary Test beam demands are overwhelming, and exceeding availability of facilities Program now entering new phase Level of coordination, too Call for participation in generic LC detector R&D proposal, built on momentum from large calorimeter R&D groups executive summary to ICFA and lab directors today