EasyGem™2.4 Technology Summary for SECS Communication

Slides:



Advertisements
Similar presentations
This course is designed for system managers/administrators to better understand the SAAZ Desktop and Server Management components Students will learn.
Advertisements

--- IT Acumens. COMIT Acumens. COM SNMP Project. AIM The aim of our project is to monitor and manage the performance of a network. The aim of our project.
Microsoft Windows NT Embedded 4.0
WEB AND WIRELESS AUTOMATION connecting people and processes InduSoft Web Solution Welcome.
Operating-System Structures
Last update: August 9, 2002 CodeTest Embedded Software Verification Tools By Advanced Microsystems Corporation.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 4 Installing and Configuring the Dynamic Host Configuration Protocol.
Introduction to Network Analysis and Sniffer Pro
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—2-1 Ethernet LANs Operating Cisco IOS Software.
Silberschatz, Galvin and Gagne  Operating System Concepts Chapter 13: I/O Systems I/O Hardware Application I/O Interface Kernel I/O Subsystem.
Operating Systems High Level View Chapter 1,2. Who is the User? End Users Application Programmers System Programmers Administrators.
INTRODUCTION OS/2 was initially designed to extend the capabilities of DOS by IBM and Microsoft Corporations. To create a single industry-standard operating.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 11: Monitoring Server Performance.
I/O Systems CS 3100 I/O Hardware1. I/O Hardware Incredible variety of I/O devices Common concepts ◦Port ◦Bus (daisy chain or shared direct access) ◦Controller.
Measuring Performance Chapter 12 CSE807. Performance Measurement To assist in guaranteeing Service Level Agreements For capacity planning For troubleshooting.
Chapter 13: I/O Systems I/O Hardware Application I/O Interface
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
MCITP Guide to Microsoft Windows Server 2008 Server Administration (Exam #70-646) Chapter 14 Server and Network Monitoring.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 8: Implementing and Managing Printers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
1 Chapter Overview Introduction to Windows XP Professional Printing Setting Up Network Printers Connecting to Network Printers Configuring Network Printers.
Graphical Alarm Management System
WebCCTV 1 Contents Introduction Getting Started Connecting the WebCCTV NVR to a local network Connecting the WebCCTV NVR to the Internet Restoring the.
AMG Attendance System Product Description Copyright © 2009 AMG Employee Management, Inc.AMG Employee Management, Inc.
E900/E910 Configuration suggestions E900/E910. E900/E910 Configuration Suggestions The intention of this presentation is to provide some suggestions for.
Automatic Software Testing Tool for Computer Networks ARD Presentation Adi Shachar Yaniv Cohen Dudi Patimer
PPOUG, 05-OCT-01 Agenda RMAN Architecture Why Use RMAN? Implementation Decisions RMAN Oracle9i New Features.
Chapter 3 Operating Systems Introduction to CS 1 st Semester, 2015 Sanghyun Park.
1/18 Always Surpassing Customers Expectations ezAttendant.
Module 10 Configuring and Managing Storage Technologies.
Introduction to Windows XP Professional Chapter 2 powered by dj.
© Ericsson Interception Management Systems, 2000 CELLNET Drop Administering IMS Module Objectives Manage the directory structure and files Manage.
Implementing Network Access Protection
I/O Systems I/O Hardware Application I/O Interface
Module 7: Fundamentals of Administering Windows Server 2008.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
Cisco S2 C4 Router Components. Configure a Router You can configure a router from –from the console terminal (a computer connected to the router –through.
1 NexSentry Command Center Powerful security management system with UNIX server and Windows NT 4 Operator Stations.
Module 9: Preparing to Administer a Server. Overview Introduction to Administering a Server Configuring Remote Desktop to Administer a Server Managing.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 4 Installing and Configuring the Dynamic Host Configuration Protocol.
Remote Administration Remote Desktop Remote Desktop Gateway Remote Assistance Windows Remote Management Service Remote Server Administration Tools.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 2 Module 2 Introduction to Routers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Agilent Technologies Copyright 1999 H7211A+221 v Capture Filters, Logging, and Subnets: Module Objectives Create capture filters that control whether.
Operating Systems 1 K. Salah Module 1.2: Fundamental Concepts Interrupts System Calls.
Page 1 Printing & Terminal Services Lecture 8 Hassan Shuja 11/16/2004.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Sem 2v2 Chapter 5 Router Startup and Setup. A router initializes by loading the bootstrap, the operating system, and a configuration file. If the router.
Module 6: Administering Reporting Services. Overview Server Administration Performance and Reliability Monitoring Database Administration Security Administration.
THE EYESWEB PLATFORM - GDE The EyesWeb XMI multimodal platform GDE 5 March 2015.
© 2002, Cisco Systems, Inc. All rights reserved..
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
LonWorks Introduction Hwayoung Chae.
Rohde & Schwarz Topex TOPEX IP Radio Gateway July 2011.
Instructor Materials Chapter 8 Configuring Cisco Devices
Module 9: Preparing to Administer a Server
SEMI 300mm Equipment Standards Overview E39, E40, E84, E87, E90, E94, E116 Mike Baxter INTEL CONFIDENTIAL.
SEMI Standards for Equipment Automation
Chapter 2: System Structures
CIMConnect Tools to enable equipment suppliers to efficiently develop powerful SECS/GEM interfaces.
Chapter 10: Device Discovery, Management, and Maintenance
Programmable Logic Controllers (PLCs) An Overview.
Functions of an operating system
Chapter 13: I/O Systems I/O Hardware Application I/O Interface
AIMS Equipment & Automation monitoring solution
Module 9: Preparing to Administer a Server
Presentation transcript:

EasyGem™2.4 Technology Summary for SECS Communication Easy, Fast and Reliable Equipment FA Control Solution

Introduction HOST FAB Network EasyGem is based on Easycluster CTC. It supports control and status information between Host and Equipment EasyGem supports SECS II Protocol, GEM Standards and HSMS Communication EasyGem has proven reliability and flexibility through multiple OEM installs in different FAB environments. GEM CTC PMC PMC I/F PMC PMC Machine TMC Intra-tool Network Easycluster

Advantages Easy to build Easy to extend Easy to debug : Defined using Configuration File or GUI Easy to extend : GEM Definition options to change functionality. ( ex : 200mm <-> 300mm, Increased Modules ) Easy to debug : Comprehensive history and communication data logfiles ( Host<->Gem, Gem<->Equip, Error, Debug Message file ) High Reliability and Flexibility : Multiple OEM installs in varied End User facilities

Features 200mm/300mm FA Scenario Support Full Gem Scenario Support : 200mm -> Gem Scenario, 300mm -> Gem and Control/Process Job Scenario Full Gem Scenario Support : Up to Spooling, Trace, Variable Limit Set/Monitor, Material Movement Max 64 Process Module Support : PPID, CEID User ID Definition : Maximum 3000 : ID => SVID,CEID,ECID,RCMD,ALID TEPAS Support : TEPAS( Samsung : Total Equipment Prediction Analysis System ) 1 TraceID has maximum 200 SVIDs, minimum 1sec sampling time and maximum 21 hundred million counts. At the same time 10 TraceID is supported Variable and Flexible Option : User can configure Option as Fab Request and Equipment System,

User Configuration Files ALID.cfg : Alarm ID Registry File( link with Equipment Alarm Number ) CEID.cfg : Collection Event ID Registry File( includes Kornic Provision Event ) ECID.cfg : Equipment Constant ID Registry File( link with Equipment Parameter IO ) SVID.cfg : Status Variable ID Registry File( link with Equipment Status IO ) RCMD.cfg : Remote Command Registry File( includes Kornic Default Command ) Recipe.cfg : Process Program ID Registry File( link with Process Module Recipe Item ) System.cfg : EasyGem Option Configuration File

Debugging Files SECS Message Log File Report/Event ID Log File : All messages between Host and Equip. are saved. File is created at 1 hour intervals Report/Event ID Log File : Can show ReportID/Event from host in GUI. The information remains persistent, no need to reload Equipment Execution Log File : Command and Event messages between Gem and Equipment Gem Analysis Error Log File : If message from host has an error( syntax, format, reject situation ), the analysis error message is saved. Communication History and Error Log File : Ethernet Port Open Fail and Host Communication Start/End Time

Architecture Configuration System CEID RCMD SVID PP Body Host ALID Alarm Manager System CEID RCMD SVID PP Body Configuration IO Manager CTC Application1 Application2 GUI PMC / TMC . Easycluster H/W Format Unformat Analysis Event Execution Data gathering EasyGem Log File Spooling Debug Log SECS2 Message Comm Communication Task Host ALID SECS2 Format UnFormat Task

System Requirements Control System OS FA Pre-test Tool Pentium III or Higher, min. 128 MB RAM Monitor : SVGA (1,024 768) LAN Card OS : Window NT 4.0 Workstation, Windows 2000, Windows XP FA Pre-test Tool : SECSim Pro™ (GW Associates, Ver2.0)

Generic Equipment Model(GEM) State Models : Process, Communication, Alarm, Control, Material Movement, Spooling Establish Communications : Communication State Display in GUI, Timer Constants, Comm. Enable/Disable Data Collection : Collection Event, Host Defined Event Reports, Event Enable/Disable, Status Data Collection, Trace Data Collection, Host Limit monitoring, Variable Name list Req. Alarm Management : Set Alarm Enable/Disable/Auto/Semi, Alarm Reporting, Alarm Data Request Remote Control : Control Event, Control Status Variable, State Display, Appropriately Accept/Deny Equipment Constants : Non-Volatile Storage, Host Data Req. and New Data Set, EC Name List Request

Generic Equipment Model(GEM) Process Program Management : Host Upload/Download/Delete/Directory request, Process Program Verification Material Movement : Port/Wafer Status, Completion Time Equipment Terminal Services : Single/Multi Block, Message Display in GUI Error Messages : Unrecognized Device ID/Stream/Function, illegal Data, Transaction Timeout Clock : Equipment Clock Request/Set Spooling : Non-Volatile Storage, Spool Status and Display

Supported SEMI Standards SEMI E5-0301 SEMI Equipment Communications Standard 2 Message Content (SECS-II) SEMI E30-1000 Generic Model for Communications and Control of Manufacturing Equipment (GEM) SEMI E37-0298 High-Speed SECS Message Services (HSMS) Generic Services SEMI E37.1-96E High-Speed SECS Message Services Single – Session Mode (HSMS-SS) SEMI E39-0600 Object Services Standard : Concepts, Behavior, and Services (OSS) SEMI E40-0301 Standard for Processing Management (PJM) SEMI E42-0299E Recipe Management Standard: Concepts, Behavior, and Service(RMS) SEMI E84-0301 Specification for Enhanced Carrier Handoff Parallel I/O Interface(PIO) SEMI E87-0301 Provisional Specification for Carrier Management (CMS) SEMI E90-0301 Specification for Substrate Tracking(STS) SEMI E94-1000 Provisional Specification for Control Job Management(CJM) SEMI E99-1000E The Carrier ID Reader/Writer Functional Standard: Specification of Concepts, Behavior, and Services

Supported Stream & Function Msgs. Primary Function S1 F1,F3,F11,F13,F15,F17,F76 S2 F13,F15,F17,F23,F25,F29,F31,F33,F35,F37,F39,F41,F43,F45,F47 S3 F1,F3,F17,F23,F25 S5 F1,F3,F5,F7 S6 F1,F3,F9,F11,F23 S7 F1,F17,F19,F23,F25,F27,F29,F65 S9 F1,F3,F5,F7,F9,F11,F13 S10 F1,F3,F5,F9 S14 F1,F3,F9,F11 S16 F1,F5,F7,F9,F11,F13,F15,F17,F19,F21,F23,F25,F27,F29 S18 F5,F7,F9,F11,F13

Semi Standard Compliance ( E5-0301/SEMI E30-1000/SEMI E39-0600 ) GEM COMPLIANCE STATEMENT Fundamental GEM Requirements GEM Section Implemented GEM-Compliant State Models 3.0, 3.1, 3.3 Yes No Yes (See NOTE 1) No Equipment Processing States 3.4 Host-Initiated S1=F13/F14 Scenario 4.1.5.1 Event Notification 4.2.1.1 On-Line Identification 4.2.6 Error Message 4.9 Documentation 8.4 Control ( Operation Initiated) 4.12(except 4.12.5.2) Additional Capabilities  (See NOTE 2) Establish Communications 4.1, 3.2 Dynamic Event Report Configuration 4.2.1.2 Variable Data Collection 4.2.2 Trace Data Collection 4.2.3 Status Data Collection 4.2.5 Alarm Management 4.3 Remote Control 4.4 Equipment Constants 4.5 Process Program Management 4.6 Material Movement 4.7 Equipment Terminal Services 4.8 Clock 4.10 Limits Monitoring 4.2.4 Spooling 4.11 Control (Host-Initiated) 4.12.5.1

Semi Standard Compliance PM COMPLIANCE STATEMENT Fundamental PM Requirements PM Section Implemented PM Compliant Single Process Job Execution 8.2  Yes No  Yes No Process Job Milestones 8.2.1 (except 8.2.1.2, 3) Process Job Failure Indication 8.2.1.7 Abort Command 8.2.3.2 Process Job Object Implementation 8.3, 9 Reject Invalid/Incomplete Parameter 8.2.1.2.1 Reject Unsupported Capabilities 11.2 Services Implementation (not per Additional) 10 Yes  No Resource Pre/Post-conditioning   Stop, Pause and Resume Commands 8.2.3.3, 4, 5 Manual Process Start 8.2.3.9 Process Job Queuing 8.3 Process Tuning 7.5, 10.4.9 Processing of Material Groups 7.6  Yes  No Multiple Concurrent Process Jobs 7.7 Multiple Consecutive Process Jobs 7.8 Process Job With No Material 7.9 Event Notification 8.2.2 Enhanced Job Creation 10.4.2 Multiple Job Creation 10.4.3 Duplicate Job Creation 10.4.4

Semi Standard Compliance CMS COMPLIANCE STATEMENT Fundamental CMS Requirements CMS Section Implemented CMS Compliant Load Port Number 9.1 ■Yes No Carrier Slot Number 9.2 Load Port Transfer State Model 9.3 – 9.4.3 Carrier Object Implementation 10 Load Port Reservation State Model (internal buffer equipment) 12 Yes ■No Load Port/Carrier Association State Model 13 Carrier ID Verification Support 14.2 Slot Map Verification Support 14.3 Services Implementation 16 Additional Events Implementation 18 Variable Data Definitions 19 Alarms Implementation 20 Additional CMS Capabilities Load Port Reservation State Model (fixed buffer equipment) Reservation Visible Signal 12.2

Semi Standard Compliance STS COMPLIANCE STATEMENT Fundamental STS Requirements STS Section Implemented STS Compliant Substrate Tracking 8 (except 8.4) ■Yes No Substrate Object and State Model 9 Substrate Location Object and State Model 10 Service Message Implementation 11 Variable Data 12 Events 8.4 none  

Semi Standard Compliance CJM COMPLIANCE STATEMENT Fundamental CJM Requirements CJM Section Implemented CJM Compliant Control Job Object 8 ■Yes No Control Job State Model 9 Control Job Queue Model 10 Carrier Properties 11 Service Message Implementation 12 Variable Data 13 Yes ■No Events 7.3.2 Additional Requirements 14

Related Screens ( Gem Communication )

Related Screens ( Gem Configuration )

Related Screens ( Host Communication )

Related Screens ( Job Manager )

EasyGem Install Base Equipment Size Numbers Country/End User Control Type (SECS2,GEM,HSMS) CVD 200mm 4 Korea/Samsung 200mm Gem Scenario 300mm 1 Taiwan/PSC 300mm Job Control Scenario RTP 7 Asher 3 Taiwan/XXX Korea : 200mm Extension Gem Scenario Taiwan : 300mm Job Control Scenario Track 5 Korea/Dongboo