UMass Lowell Computer Science 91.503 Graduate Analysis of Algorithms Prof. Karen Daniels Spring, 2005 Lecture 3 Tuesday, 2/8/05 Amortized Analysis.

Slides:



Advertisements
Similar presentations
October 31, 2005Copyright © by Erik D. Demaine and Charles E. LeisersonL13.1 Introduction to Algorithms LECTURE 11 Amortized Analysis Dynamic tables.
Advertisements

Amortized Analysis Some of the slides are from Prof. Leong Hon Wais resources at National University of Singapore Prof. Muhammad Saeed.
CS 473Lecture X1 CS473-Algorithms I Lecture X Dynamic Tables.
Data Structures Haim Kaplan and Uri Zwick October 2013 Lecture 2 Amortized Analysis “amortized analysis bounds the worst case running time of a sequence.
David Luebke 1 5/4/2015 CS 332: Algorithms Dynamic Programming Greedy Algorithms.
1 Chapter 17: Amortized Analysis III. 2 Dynamic Table Sometimes, we may not know in advance the #objects to be stored in a table We may allocate space.
CSE332: Data Abstractions Lecture 21: Amortized Analysis Dan Grossman Spring 2010.
UMass Lowell Computer Science Graduate Analysis of Algorithms Prof. Karen Daniels Spring, 2010 Lecture 3 Tuesday, 2/9/10 Amortized Analysis.
Data Structures Haim Kaplan and Uri Zwick February 2010 Lecture 2 Amortized Analysis “amortized analysis finds the average running time per operation over.
CPSC 411, Fall 2008: Set 6 1 CPSC 411 Design and Analysis of Algorithms Set 6: Amortized Analysis Prof. Jennifer Welch Fall 2008.
Princeton University COS 423 Theory of Algorithms Spring 2001 Kevin Wayne Amortized Analysis Some of these lecture slides are adapted from CLRS.
Tirgul 9 Amortized analysis Graph representation.
UMass Lowell Computer Science Graduate Analysis of Algorithms Prof. Karen Daniels Spring, 2009 Lecture 3 Tuesday, 2/10/09 Amortized Analysis.
Amortized Anaysis of Algorihms, A.Yazici, Spring 2007CEng Amortized Analysis of Algorithms Adnan YAZICI Dept. of Computer Engineering Middle East.
Theory I Algorithm Design and Analysis (8 – Dynamic tables) Prof. Th. Ottmann.
Amortized Analysis (chap. 17) Not just consider one operation, but a sequence of operations on a given data structure. Average cost over a sequence of.
Tirgul 8 Universal Hashing Remarks on Programming Exercise 1 Solution to question 2 in theoretical homework 2.
CS305/503, Spring 2009 Amortized Analysis Michael Barnathan.
Amortized Analysis.
CS333 / Cutler Amortized Analysis 1 Amortized Analysis The average cost of a sequence of n operations on a given Data Structure. Aggregate Analysis Accounting.
Tirgul 9 Hash Tables (continued) Reminder Examples.
Andreas Klappenecker [based on the slides of Prof. Welch]
Tirgul 11 Solutions for questions from T2, T3 DFS & BFS - reminder Some Hashing Reminder : don’t forget to run ~dast/bin/testEx3.csh on your jar file before.
Hashing General idea: Get a large array
17.Amortized analysis Hsu, Lih-Hsing. Computer Theory Lab. Chapter 17P.2 The time required to perform a sequence of data structure operations in average.
UMass Lowell Computer Science Analysis of Algorithms Prof. Karen Daniels Fall, 2001 Lecture 2 (Part 2) Tuesday, 9/11/01 Amortized Analysis.
UMass Lowell Computer Science Analysis of Algorithms Prof. Karen Daniels Fall, 2001 Lecture 11 Tuesday, 12/4/01 Advanced Data Structures Chapters.
Amortized Analysis Not just consider one operation, but a sequence of operations on a given data structure. Average cost over a sequence of operations.
EXPANDING STACKS AND QUEUES CS16: Introduction to Data Structures & Algorithms 1 Tuesday, February 10, 2015.
CSE332: Data Abstractions Lecture 26: Amortized Analysis Tyler Robison Summer
Ajinkya Nene, Lynbrook CS Club. 04/21/2014. Definition Allows you to figure the worst-case bound for the performance of an algorithm (most useful for.
CS 473Lecture 121 CS473-Algorithms I Lecture 12 Amortized Analysis.
Interval Trees.
Symbol Tables Symbol tables are used by compilers to keep track of information about variables functions class names type names temporary variables etc.
Introduction to Algorithms 6.046J/18.401J/SMA5503 Lecture 14 Prof. Charles E. Leiserson.
Tonga Institute of Higher Education Design and Analysis of Algorithms IT 254 Lecture 5: Advanced Design Techniques.
Amortized Analysis The problem domains vary widely, so this approach is not tied to any single data structure The goal is to guarantee the average performance.
Amortized Analysis Typically, most data structures provide absolute guarantees on the worst case time for performing a single operation. We will study.
TECH Computer Science Dynamic Sets and Searching Analysis Technique  Amortized Analysis // average cost of each operation in the worst case Dynamic Sets.
Design & Analysis of Algorithms COMP 482 / ELEC 420 John Greiner.
1 Chapter 17: Amortized Analysis I. 2 About this lecture Given a data structure, amortized analysis studies in a sequence of operations, the average time.
1 Hashing - Introduction Dictionary = a dynamic set that supports the operations INSERT, DELETE, SEARCH Dictionary = a dynamic set that supports the operations.
Advanced Algorithm Design and Analysis (Lecture 12) SW5 fall 2004 Simonas Šaltenis E1-215b
Amortized Analysis We examined worst-case, average-case and best-case analysis performance In amortized analysis we care for the cost of one operation.
Amortized Analysis Some of the slides are from Prof. Leong Hon Wai’s resources at National University of Singapore.
CSCE 411H Design and Analysis of Algorithms Set 6: Amortized Analysis Prof. Evdokia Nikolova* Spring 2013 CSCE 411H, Spring 2013: Set 6 1 * Slides adapted.
CMSC 341 Amortized Analysis.
David Luebke 1 12/12/2015 CS 332: Algorithms Amortized Analysis.
Hashing Goal Perform inserts, deletes, and finds in constant average time Topics Hash table, hash function, collisions Collision handling Separate chaining.
Amortized Analysis. p2. Amortized analysis: Guarantees the avg. performance of each operation in the worst case. Aggregate method Accounting method Potential.
Amortized Analysis. Problem What is the time complexity of n insert operations into an dynamic array, which doubles its size each time it is completely.
CSE373: Data Structures & Algorithms Lecture 8: Amortized Analysis Dan Grossman Fall 2013.
Introduction to Algorithms Amortized Analysis My T. UF.
David Luebke 1 2/26/2016 CS 332: Algorithms Dynamic Programming.
Amortized Analysis In amortized analysis, the time required to perform a sequence of operations is averaged over all the operations performed Aggregate.
1 Chapter 17: Amortized Analysis II. 2 About this lecture Previous lecture shows Aggregate Method This lecture shows two more methods: (2)Accounting Method.
Introduction to Algorithms: Amortized Analysis. Introduction to Algorithms Amortized Analysis Dynamic tables Aggregate method Accounting method Potential.
Amortized Analysis.
Amortized Analysis of Rehashing
Andreas Klappenecker [partially based on the slides of Prof. Welch]
Complexity analysis.
Amortized Analysis (chap. 17)
CSCE 411 Design and Analysis of Algorithms
Presentation by Marty Krogel
Amortized Analysis The problem domains vary widely, so this approach is not tied to any single data structure The goal is to guarantee the average performance.
Chapter 17 Amortized Analysis Lee, Hsiu-Hui
Haim Kaplan, Uri Zwick March 2018
CSCE 411 Design and Analysis of Algorithms
CS 332: Algorithms Amortized Analysis Continued
CSCE 411 Design and Analysis of Algorithms
Presentation transcript:

UMass Lowell Computer Science Graduate Analysis of Algorithms Prof. Karen Daniels Spring, 2005 Lecture 3 Tuesday, 2/8/05 Amortized Analysis

Overview ä Amortize: “To pay off a debt, usually by periodic payments” [Websters] ä Amortized Analysis: ä “creative accounting” for operations ä can show average cost of an operation is small (when averaged over sequence of operations, not distribution of inputs) even though a single operation in the sequence is expensive ä result must hold for any sequence of these operations ä no probability is involved (unlike average-case analysis) ä guarantee holds in worst-case ä analysis method only; no effect on code operation

Overview (continued) ä 3 ways to determine amortized cost of an operation that is part of a sequence of operations: ä Aggregate Method ä find upper bound T(n) on total cost of sequence of n operations ä amortized cost = average cost per operation = T(n)/n ä same for all the operations in the sequence ä Accounting Method ä amortized cost can differ across operations ä overcharge some operations early in sequence ä store overcharge as “prepaid credit” on specific data structure objects ä Potential Method ä amortized cost can differ across operations (as in accounting method) ä overcharge some operations early in sequence (as in accounting method) ä store overcharge as “potential energy” of data structure as a whole ä (unlike accounting method)

Aggregate Method: Stack Operations ä Aggregate Method ä find upper bound T(n) on total cost of sequence of n operations ä amortized cost = average cost per operation = T(n)/n ä same for all the operations in the sequence ä Traditional Stack Operations ä PUSH(S,x) pushes object x onto stack S ä POP(S) pops top of stack S, returns popped object ä O(1) time: consider cost as 1 for our discussion ä Total actual cost of sequence of n PUSH/POP operations = n

Aggregate Method: Stack Operations (continued) ä New Stack Operation ä MULTIPOP(S,k) pops top k elements off stack S ä pops entire stack if it has < k items ä MULTIPOP actual cost for stack containing s items: ä Use cost =1 for each POP ä Cost = min(s,k) ä Worst-case cost in O(s) in O(n) MULTIPOP(S,k) 1 while not STACK-EMPTY(S) and k = 0 2do POP(S) 3 k k - 1

Aggregate Method: Stack Operations (continued) ä Sequence of n PUSH, POP, MULTIPOP ops ä initially empty stack ä MULTIPOP worst-case O(n) O(n 2 ) for sequence ä Aggregate method yields tighter upper bound ä Sequence of n operations has O(n) worst-case cost ä Each item can be popped at most once for each push ä # POP calls (including ones in MULTIPOP) <= #push calls ä <= n ä Average cost of an operation = O(n)/n = O(1) ä = amortized cost of each operation ä holds for PUSH, POP and MULTIPOP

Accounting Method ä Accounting Method ä amortized cost can differ across operations ä overcharge some operations early in sequence ä store overcharge as “prepaid credit” on specific data structure objects ä Let be actual cost of ith operation ä Let be amortized cost of ith operation (what we charge) ä Total amortized cost of sequence of operations must be upper bound on total actual cost of sequence ä Total credit in data structure = ä must be nonnegative for all n

Accounting Method: Stack Operations ä Paying for a sequence using amortized cost: ä start with empty stack ä PUSH of an item always precedes POP, MULTIPOP ä pay for PUSH & store 1 unit of credit ä credit for each item pays for actual POP, MULTIPOP cost of that item ä credit never “goes negative” ä total amortized cost of sequence of n ops is in O(n) ä PUSH12 ä POP10 ä MULTIPOPmin(k,s)0 Operation Actual Cost Assigned Amortized Cost

Potential Method ä Potential Method ä amortized cost can differ across operations (as in accounting method) ä overcharge some operations early in sequence (as in accounting method) ä store overcharge as “potential energy” of data structure as a whole (unlike accounting method) ä Let c i be actual cost of ith operation ä Let D i be data structure after applying ith operation  Let  (D i ) be potential associated with D i ä Amortized cost of ith operation: ä Total amortized cost of n operations: ä Require: so total amortized cost is upper bound on total actual cost ä Since n might not be known in advance, guarantee “payment in advance” by requiring terms telescope

Potential Method: Stack Operations ä Potential function value = number of items in stack ä guarantees nonnegative potential after ith operation ä Amortized operation costs (assuming stack has s items) ä PUSH: ä potential difference= ä amortized cost = ä MULTIPOP(S,k) pops k’=min(k,s) items off stack ä potential difference= ä amortized cost = ä POP amortized cost also = 0 ä Amortized cost O(1) total amortized cost of sequence of n operations in O(n)

Dynamic Tables: Overview ä Dynamic Table T: ä array of slots ä Ignore implementation choices: stack, heap, hash table... ä if too full, increase size & copy entries to T’ ä if too empty, decrease size & copy entries to T’ ä Analyze dynamic table insert/delete ä Actual expansion/contraction cost is large ä Show amortized cost of insert/delete = O(1)  Load factor  (T) = num[T]/size[T]  empty table:  (T) = 1 (by convention)  full table:  (T) = 1

Dynamic Tables: Table (Expansion Only) ä Load factor bounds (double size when T is full): ä Sequence of n inserts on initially empty table ä Worst-case cost of insert is in O(n) ä Worst-case cost of sequence of n inserts is in O(n 2 ) LOOSE “elementary” insertion

Dynamic Tables: Table Expansion (cont) ä Aggregate Method: ä c i = i if i-1 is exact power of 2 ä 1 otherwise ä total cost of n inserts = Accounting Method: Accounting Method: ä charge cost = 3 for each element inserted ä intuition for 3 ä each item pays for 3 elementary insertions ä inserting itself into current table ä expansion: moving itself ä expansion: moving another item that has already been moved Amortized Analysis count only elementary insertions

Dynamic Tables: Table Expansion (cont) ä PotentialMethod :  Value of potential function  ä 0 right after expansion ä builds to table size by time table is full ä always nonnegative, so sum of amortized costs of n inserts is upper bound on sum of actual costs Amortized Analysis ä Amortized cost of ith insert   i  = potential after ith operation ä Case 1: insert does not cause expansion ä Case 2: insert causes expansion use these:

Dynamic Tables: Table Expansion & Contraction ä Load factor bounds: ä (double size when T is full) (halve size when T is ¼ full): ä Delete pseudocode analogous to insert ä PotentialMethod :  Value of potential function  ä = 0 for empty table ä 0 right after expansion or contraction  builds as  (T) increases to 1 or decreases to ¼ ä always nonnegative, so sum of amortized costs of n inserts is upper bound on sum of actual costs  = 0 when  (T)=1/2  = num[T] when  (T)=1  = num[T] when  (T)=1/4 Amortized Analysis count elementary insertions & deletions

Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä PotentialMethod

Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä Analyze cost of sequence of n inserts and/or deletes ä Amortized cost of ith operation ä Case 1: insert  Case 1a:  i-1 >= ½. By previous insert analysis:  Case 1b:  i-1 < ½ and  i < ½  Case 1c:  i-1 = ½ ä PotentialMethod holds whether or not table expands no expansion

Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä Amortized cost of ith operation (continued) ä PotentialMethod ä Case 2: delete  Case 2a:  i-1 >= ½.  Case 2b:  i-1 < ½ and  i < ½  Case 2c:  i-1 < ½ and  i < ½ no contraction contraction Conclusion: amortized cost of each operation is bounded above by a constant, so time for sequence of n operations is O(n).

Example: Dynamic Closest Pair source: “Fast hierarchical clustering and other applications of dynamic closest pairs,” David Eppstein, Journal of Experimental Algorithmics, Vol. 5, August S SS

Example: Dynamic Closest Pair (continued) source: “Fast hierarchical clustering and other applications of dynamic closest pairs,” David Eppstein, Journal of Experimental Algorithmics, Vol. 5, August S SS