M. Vogel SPECTRAP status
Manuel VogelGSI X SPECTRAP
Manuel Vogel infrastructure overview UNILAC SIS 400 MeV/u ESR U 92+ Pb 81+ Bi 80,82+ 4 MeV/u Electron cooling and deceleration Stripper target Post decelerator Cooler trap Experiments with cold ions 10 5 cold highly charged ions every 10 s HITRAP
Manuel Vogel closer look: deceleration
Manuel Vogel future experimental area
Manuel Vogel SPECTRAP platform
Manuel Vogel client experiments: arrangement SPECTRAP g-factor setup offline source H1 H5 H2
Manuel Vogel setup overview (schematic)
Manuel Vogel new trap
Manuel Vogelyesterday
damage
"clean room"