Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  Sam will have soldered all parts onto our PCB so that we can test it at the meeting  Eric finished MUX code in PIC C and.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
WE’RE DONE!. Not Really WeekendMonday Raphael Build circuit on PCB Write miscellaneous firmware, i.e. DAC Dan Sam USB is tested and fully functional.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/15 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Olin Student Projects 2008 Keith Gendreau Code 662 NASA/GSFC
Molly, Gwyn, Sam, and Eric.  We ordered everything we need to make a first prototype (1 or 2 extras of all components)  Spent $775 on Digikey (includes.
I-heliostat 6/23 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/21 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters.
SNIFFER CARD for PCI-express channel
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Interface 1: Knobs GUI: link the buttons/knobs to “an action”; prompt MCA.py USB Client: do bit-masking and packet formation; send data as a control transfer.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/29 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/17 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric. Build a robust low voltage converter from an unregulated 28V supply with a user-friendly command tester that displays relevant.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We had assumed that components should have a rated current no more than mA above the requirement.  Fred says that.
I-heliostat 6/25 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We ed Fred asking about connectors and EAGLE  Sam is set up to conduct a thermal test of a converter in a vacuum 
RF Signal Wireless Test Lab Weekly Report 1: Objective: Familiarize all group members with RF wireless transmission capabilities and components.
Lab #5 Overview Activity #1 - Simulation of an Op-Amp inverting amplifier Activity #2 - Build and Test the Op-Amp inverting amplifier Activity #3 - Determining.
Kyle Merkert ECE 791/792 Senior Design Project October 2009 – May 2010 Faculty Advisor: Dr. Wayne Smith.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Deployment of MONALISA algorithms and data inside LiCAS analysis framework Jack Hobbs 06/08/08 Java 14/08/08 slide 1.
Status Report #1 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect September 17,
Solar Power Array Management for the Solar Racing Team Mark Calotes Ginah Colón Alemneh Haile Nidhi Joshi Michael Lu School of Electrical and Computer.
William. Operational Amplifier (op amp) Drawing Circuit Diagrams Inverting Amplifiers – Negative potential is higher than Positive Potential Non-Inverting.
Basic Operation of a 555 Timer Threshold Control Voltage Trigger Discharge Reset Output.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Flowcharts. Learning Objectives To learn how to break down tasks How to create a flowchart.
What we will do today: Introduce the new topic on Electronic Components. Identify the three main parts of any electronic system. Give examples of output.
Status of the TileMuon Digitizer Board Victor Ferraz.
Throttle Arduino RC Receiver Stock Golf Cart Motor Controller Motor 1 PWM signal: Voltage: 0 – 5V Period = 22ms Positive Pulse Width: 1ms – 2ms Digital.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
The Electronic Die Using the PICAXE 08
ECE 477 Design Review Team 12  Spring 2007
Printing Address Labels
Maximum Power Point Tracker
Alex Brown Cory Haugh Ajmer Dwivedi
Introduction to H-Bridge
ECE 477 Design Review Team 6 - Spring 2012
Process of Debugging a Circuit
Is there anything we can do to keep from going into this state?
Logging In SIGN IN Select Sign In/Up on the home page
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
CS334: Logisim program lab6
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Example Example 1: An electric lamp is rated 110 W, 200 V. When the lamp is operated at its rated power and voltage, calculate a) the current flowing through.
Voltage Regulator Board
Presentation transcript:

Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe

Progress  Mostly debugging PWM issues: Able to control PWM without GUI, but it didn’t work later Looking at time lag between ASCII file input and DAC output ○ Appears to be a limiting threshold for updating information (~12 ms) ○ Reduced to 4 ms when print statements were removed  Connecting PWM and DAC output Thinking of using a relay to switch between two voltages on a DAC, triggered by the PWM output from the PIC

Next steps  Today/weekend Continue to debug GUI/PIC connection Make circuit to connect PWM and DAC output Continuously updating GUI  Next week Anything of the above that isn’t finished Testing with MXS (“should be in the mail [yesterday]”) Once we solidify the system we want: PCB layout, components box design