Progress Report TDP-CART 15m Offset Antenna Collaboration National Research Council Herzberg Institute of Astrophysics Dominion Radio Astrophysical Observatory.

Slides:



Advertisements
Similar presentations
Define ecosystem. Community of organisms and their abiotic environment.
Advertisements

Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
DVA1 Project Gary Hovey and Gordon Lacy Herzberg Jamboree 23 October 2014 NRC-Herzberg Astronomy Technology Program - Penticton.
Dillon Watring Felipe Gomez Ruth Quant Faculty Advisor: Dr. Ibrahim Tansel FIU Department of Mechanical Engineering, Miami, FL.
Parabolic Dish Antennas. An Antenna is : An An effective interface between the radio and free space: Radio Antenna Free space a For Terrestrial Communications,
2001 APCO/NENA State Training Conference January 19, 2001.
DVAC CONCEPT DESCRIPTION: OFFSET GREGORIAN DISH — DVAC-1 PRIME FOCUS DISH — DVAC-2 卢雨 (Yu Lu), Vice Joint Lab. for Radio.
DVA1 Project Overview and Status Gary Hovey and Gordon Lacy SKA Project Office Visit DRAO 29 March 2014 NRC-Herzberg Astronomy Technology Program - Penticton.
SKA Specifications and Reflector Antennas P. Dewdney Mar 31, 2008.
US SKA TDP Hydroforming Production Cost Rev B 12m Primary & Support Structure US SKA Antenna Working Group Meeting May 7, 2009, Los Angeles, California.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
ALTERNATIVE MECHANICALS DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
Matt Fleming Hydroformed Reflector Time & Materials Cost Estimate SKA US TDP Matt Fleming
High Performance Low-Cost Composite Antenna Reflectors for the SKA DOMINION RADIO ASTROPHYSICAL OBSERVATORY Herzberg Institute of Astrophysics Penticton.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
CURRENT SKA TDP ANTENNA DESIGN 10 DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
SKA TDP & CART 15m (DVA-1) ANTENNA DESIGN 11 US SKA Consortium Meeting at Arlington VA June 3-4, 2010 Matt Fleming Contributions from Jack Welch Roger.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
National Astronomy and Ionosphere Center © Germán Cortés M 2008 SKA TDP Antenna Optics By Germán Cortés M. Cornell University Ithaca NY 14853, USA National.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
(Problems with) Optimising Brake Disc Design by Simulation (Problems with) Optimising Brake Disc Design by Simulation Bill Young Senior Consultant, Design.
222 MHz Yagis with Direct 50-ohm Feed
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Developing a low cost dish for MeerKAT Willem Esterhuyse Subsystem manager: Antenna Structures
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Telescope Technologies
Design of a Rocket Engine Thrust Augmentation Ejector Nozzle By: Sepideh Jafarzadeh Mentor: Dr. Timothy Takahashi Arizona State University Ira A. Fulton.
DVA1 Project Status Gary Hovey and Gordon Lacy SKA Visit, Sept NRC-Herzberg Astronomy Technology Program - Penticton.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
SKA Dishes, SEEG Meeting Cape Town September 2013 SKA Dish Verification Antenna #1 – Test Plan Gary Hovey, DVA-1 Project Manger Astronomy Technology.
US SKA TDP DVA-1 June 28-29, 2012Dish Verification Antenna No. 1 Critical Design Review, Penticton, BC Overview Of DVA-1 Optics Lynn Baker Bill Imbriale.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
DVA1 Project Status Gary Hovey and Gordon Lacy ngVLA Workshop, April NRC-Herzberg Astronomy Technology Program - Penticton.
FPL Energy Wind Index May FPL Energy Wind Index Rolling 15 months, current portfolio 1 1 Average wind speed for the period from those reference.
DVA-1 Project Overview Gordon Lacy April 2014.
M icro A ir V ehicle Wing Deployment System April 7, 2005 MAV erick S olutions Todd Adkins Leroy Cohen Jr. Adam Hollrith Brian Moore Sponsored by: Eglin.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010.
Earth Moon Earth Communications The challenge to build a very large Antenna By Mike Melum Presented to ASPE June 13, 2013.
Dish Verification Antenna – 1 Project NRC - Herzberg Gary Hovey 18 November 2013.
Dish Consortium Status in SKA1 Preconstruction
SMC 4133 AUTOMOTIVE STRUCTURES
US SKA TDP Antenna Design Progress US SKA AWG Meeting May 6, 2009, Los Angeles. California Matt Fleming Contributions from Jack Welch Roger Schultz Sandy.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Application Development in Engineering Optimization with Matlab and External Solvers Aalto University School of Engineering.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
DVAC PROGRESS OFFSET GREGORIAN DISH (DVAC-1) 郑元鹏 (Yuanpeng Zheng ) Joint Lab. for Radio Astronomy and Technology MAY 29, 2012.
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
Victor Guarino P.E. Mechanical Support Group High Energy Physics - ANL SC Design Effort Victor Guarino P.E.
CETC54 contributions Neil Roddis Apr 15, SPDO In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers,
Single Cryocooler 1.2 to 116 GHz Receiver for ngVLA S. Weinreb, A. Soliman, and H. Mani July 30, Rationale 2.Synergistic Reflector Design 3.Dewar.
Rebuilding a 6 m Dish antenna
Composite Mirror Applications, Inc
E-165 (FLASH) Status 8:00am 6/12/2004.
NGVLA Science Workshop, Socorro NM June 26, 2017
Wideband Single Pixel Feeds
Need for the ATA SKA Development Facility
New Connectivity Scheme Schedule & Budget Impacts Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council.
LARP Phase II Secondary Collimator RC-0 and RC-1
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
DVA-1 Baseline Optical Design
Agenda, Day 1, Tuesday, June 19
Presentation transcript:

Progress Report TDP-CART 15m Offset Antenna Collaboration National Research Council Herzberg Institute of Astrophysics Dominion Radio Astrophysical Observatory Gordon Lacy, P.Eng. May 2010

Initial Work Work on composite offsets was ongoing throughout With only preliminary optics, “best guess” made on mechanical configuration. Many structural arrangements have been explored. An all-molded reflector/back structure concept shows promise

Progress! Agreement between the TDP, NRC-HIA, and the SPDO on - the basic optics design (April 2010) Mechanical and structural design can now proceed. Absence of the final feed design can be accommodated for now - will require more input by the preliminary design stage. e.g. overall size, number of feeds, and feed weight & dimension (PAF) Structural design can now be progressed An optimal design will take 3 to 4 months - It cannot be done more quickly with the current resources.

Plan to Move Forward Close collaboration between NRC-HIA and the TDP has just begun. - Much preliminary work has been completed Building on this work, the near-term goals are to design: a.Composite primary and secondary reflectors b.A tubular backup structure, either in all metal, or in a combination of metal and composite c.Feed and secondary support system again in all metal or in a combination of metal and composite d.Compare performance versus cost for the various design options e.Compare with our previous offset designs to gain more information on cost versus performance f.Prepare for a CoDR some time in late 2010

Collaborative Work Current division of labour with TDP NRC-HIA providing: all composite design and analysis all dish and backing structure FEA analysis including FEA on metal parts wind-loading data from wind tunnel work on offset dishes TDP providing design and analysis of: drive systems mount and tower metal backup structure parts Combined developments: backup structure feed-leg structure feed indexer

Current Design Work has just begun on the 15m offset Gregorian dish for DVA-1 The design includes elements from NRC and ATA designs. Elements of interest in current design: One piece molded FRP primary and secondary dish surfaces. Steel or Steel and FRP tube backup structure. Feed legs based on topological optimization studies Secondary mount provides shield for feeds

Questions?