Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation.

Slides:



Advertisements
Similar presentations
Air WALT: to know some of the characteristics of air
Advertisements

Describe a water supply distribution system
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
CE 370 Filtration.
The pumps should be tightened about once a month. If a new pump is installed, the pump should be initially tightened and then re-torqued one week later.
Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.
Basic Governing Differential Equations
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Flow Control Creativity without a trip Variations on a drip Giving head loss the slip.
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
Fluid Mechanics 07.
Experiment 8 : Minor Losses
Water supply and drafting. Objectives Understand and be able to demonstrate the different hydrant lays and hook ups Explain/demonstrate how to operate.
Reservoirs Covered in Ch. 5 of Vickers Text
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
LSRII Troubleshooting Tips
Experiment (4) Flow Measurement
Suction Pumps.
Rooftop Rainwater Harvesting Pre-implementation guide for schools.
Hydraulics.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Design alum Flocculation Clear Well Sedimentation.
Pipe Networks Pipeline systems Pumps pipe networks measurements
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Nutrient Removal Project Project rationale Sequencing Batch Reactor Software that.
Elementary Fluid Dynamics: The Bernoulli Equation
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Pipe Networks  Pipeline systems  Transmission lines  Pipe networks  Measurements.
Elementary Fluid Dynamics: The Bernoulli Equation CEE 331 June 25, 2015 CEE 331 June 25, 2015 
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NRP 3: Let’s get started.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation.
Water Treatment Plant Reflections S 1 Raw Water alum QT S 2 S 4 m 1 S 3 Flocculation Sedimentation p 1 S 5 Clearwell Clean Water S 1 S 1 Raw Water alum.
Team Aquifers: Flow Control Device James Berg Jamison Hill Stephen Russo Scott Weeks CEE December 2004.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NRP 2.
Elementary Fluid Dynamics: The Bernoulli Equation CVEN 311 Fluid Dynamics 
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WTP Project Safety, Expectations, Economics, Logic Raw water To waste F1F1 F1F1 S1S1.
Water Treatment Stations Tue. (am) Tue. (pm) Wed. (am) Wed. (pm) Thur. (am) Thur. (pm) Station 1Mini-pilot (CO 166 Greenhouse - Liz) Station 2NF.
CARBURETED FUEL SYSTEM
Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Hydraulics For The Long Term
1.1 Intro to the microscope and Calculating cell size.
Hydraulic Modeling of Water Distribution Systems
Pump performance testing living with the lab © 2011 LWTL Faculty Team.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Computer Literacy BASICS
HVAC523 Circulator Pumps.
PERFORMANCE OF A GRANULAR ACTIVATED CARBON BIOFILTER IN LOW STRENGTH WASTEWATER TREATMENT D. S. Chaudhary, H. H. Ngo and S. Vigneswaran Environmental Engineering.
Plant Investigation: Purpose of the Investigation: How do environmental factors affect the height of bean plants?
Scientific Communication
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Urban Storm Drain Design: Multiple Pumps. Multiple Pumps The HDM and FHWA recommend more than one pump Redundancy Flexibility Ability to manage flows.
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Electrical Circuits ~Moving Charge Put to Use The Circuit All circuits, no matter how simple or complex, have one thing in common, they form a complete.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Pipe Networks 
Resume Tips & Tricks From Talis Group, Inc.. Resumes should be no longer than two pages, three at the absolute max. Please remember that HR people are.
T-6B On-Board Oxygen Generation System (OBOGS)
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Water System Infrastructure
Plumbing system fundamental and design course
Introduction to the Microscope
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Vacuum System Failures at HERA
OBJECTIVES Describe the operation of a pressure-differential switch and a brake fluid level sensor switch. Describe the operation of a residual check valve.
Stick Together & Civil Structures
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Lecture # 11 Water treatment:.
T-6B On-Board Oxygen Generation System (OBOGS)
Troubleshooting 11/14/2018 Water King Service Seminar.
Enhancing Rapid Sand Filtration by Backwashing with Alum
CSE 303 Concepts and Tools for Software Development
T-6B On-Board Oxygen Generation System (OBOGS)
Chapter 7: Classroom and shop manuals
Presentation transcript:

Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation

Overview  Trouble shooting guide  Hydraulic challenges  Surface tension  Startup requirements  Wrap up

When it doesn’t work!  You are creating a complex system  Any component that fails can lead to failure in the system  How do you identify the source of a problem?  Attempt to identify the events that could cause a failure in advance

Scientific Method of Troubleshooting  The Scientific method:  Clearly identify the problem  Create hypotheses  Design experiments to test the hypotheses  Draw conclusions based on the data  How can you choose which components to test first?  Intuition?  Ask which component could cause the observed symptoms  Requires an understanding of how the system works!

Modular Approach  How can you build a complex system with the greatest probability of ultimate success?  Break a system down into its components and test individual pieces  Only add components to the system after the components have been tested  Begin with the system as simple as possible  What would the simplest operating rules be?  Add unit processes one by one

Hydraulic Challenges (getting the water to go where you want it to go)  Leaks  Connections not sufficiently tight  Improvised connections lacking a good seal  Overflows  Caused by water not going where you thought it was going  Open channel flows (air and water) – coming up  Excessive head loss  Tubing size too small  Filter clogging

Simplified WTP Schematic  Can the flow accumulator be on the bench top?  What controls the water level in the flocculation tank?  Why does the water flow through the filter?  How would you start up the plant and get water to flow through the filter the first time?  How much head loss can the filter cause before the system fails? Flocculation Clear Well Sedimentation

Improved WTP  Why is this better?  Max head loss?  What if sedimentation tank were open to atmosphere?  How could you measure head loss through the filter? Clear Well Sedimentation Flocculation Open Channel Flow Design it!

Relative Strength of Forces Gravity Stable*Unstable ? * water column over air won’t break

Open Channel Flows: Water and Air  All overflows tubes are open channel flow  Minimum inside diameter for sink drain is 6.35 mm (¼”)  Minimum inside diameter for line where water level moves up and down based on filter head loss is 9.5 mm (3/8”)  What happens if the tubing isn’t large enough for open channel flow? WTP

Leak Prevention  Clear well overflow line must be flat on bench top  What happens if head loss through the filter increases too much?  Check each tank or tube with an opening to the atmosphere and ask:  What could cause an overflow at this location?  How could we design the system to reduce risk of failure  Turn off the manual supply valve when you aren’t using the plant  Make sure that all valves are off when the plant isn’t being used. WTP

Pointers  Pressure sensors must be kept dry (they can fail if one drop of water soaks into the terminals)  Use manual valves to make it easy to drain tanks  Make sure you are using the most recent configuration file in your folder!  Label all processes  Label the alum stock bottle  Label all containers containing fluids

Plant Layout  Design a plant layout that is easy to follow  Tubing lengths can be changed so you can place your devices anywhere you want them  Beware of large diameter horizontal tubes containing particles  Why? WTP

Startup Requirements  Stamp module must be on the computer side of the bench divider  Must prove that excessive head loss will cause the filter to backwash before causing a flood!  Must show that backwash won’t empty clear well  Must show that the plant switches between states correctly

Operating Criteria  Initial down flow rate of 5 m/h (40.9 ml/min)  If you increase the down flow rate make absolutely sure that the plant doesn’t overflow  Use your water treatment plant design homework to calculate the best stock concentration of alum  The best stock concentration might change if you significantly change the plant flow rate  Plan to have someone check on the plant at least once per day (alum stock!)

Competition Submission  Submit 5 copies by 5 pm on Thursday (Dec. 4).  Executive Summary  A one page cover letter to the judges where you introduce your design firm, identify the members of your design team, and describe the important features of your water treatment plant.  Final plant schematic  all valves, sensors, tanks, and pumps with correct relative elevations. Clearly show the elevation of the laboratory bench top.  Description of your design and your design process  How did you size the unit processes in your plant?  How did you test the plant?  How did you use data that you acquired to modify the design?  What are the special features of your plant that make it the best?