Team 7: Engineering an Alternate Route to Styrene
Larae Baker Adam Jones Michael Heslinga Jonathan Bush Maxine Bent
Outline Re-introduction Design Process Struggles Changes
Re-Introduction Design a styrene plant on HYSYS, a computer simulator –Capacity: 2 billion lbs/year –$0.70/lb –14% of US production New chemical process –Ethane instead of Ethylene
Design Process Research Base Case Detailed Equipment Design –Reactors –Separations –Other equipment Economic Optimization Finalized Design
Process Design
Struggle Separations –Not in patents –Heuristics No kinetic data –Cannot determine a rate law –Assumed conversion and selectivity
Changes since December Kinetics Working base case Optimization beginning Catalyst regeneration plan More detailed schedule Plant Details –50-60 acres –Texas/Louisiana
THANKS FOR LISTENING! QUESTIONS?