November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable.

Slides:



Advertisements
Similar presentations
Chapter 14 Measuring and Assigning Costs for Income Statements
Advertisements

©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 15 Overhead Application: Variable.
Chapter 2 Job Order Cost Systems.
© John Wiley & Sons, 2005 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management.
CHAPTER 14: MEASURING AND ASSIGNING COSTS FOR INCOME STATEMENTS Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 14: Measuring and Assigning.
2009 Foster Business School Cost Accounting L.DuCharme 1 Cost-Volume-Profit Analysis Chapter 3.
Inventory Costing and Capacity Analysis
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 8e © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4 2/14/05.
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Job Order Costing Chapter 4.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Product Costing Break Normal Costing ACTG 321 Agenda for Lecture 6.
ACTG 321 Agenda for Lecture 14
9 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Inventory Costing and Capacity Analysis Chapter 9.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
Variable Costing Chapter 21 Exercises.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
The Value Chain and the Cost of Inventory Absorption Costing and Variable Costing The Eskimo Pie Company Example ACTG 321 Agenda for Lecture 11.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
4 - 1 Job Order Costing – Chapter 4 Describe the building-block concepts of costing systems. Learning Objective 1.
Chapter 9 Inventory Costing and Capacity Analysis.
20 Variable Costing for Management Analysis
Throughput Costing.
The Master Budget and Flexible Budgeting
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
Chapter 2 Basic Managerial Accounting Concepts
Variable and Full Costing Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 3.
1. Describe and illustrate income reporting under variable costing and absorption costing. 2. Describe and illustrate income analysis under variable costing.
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Lecture 13.
Absorption Cost Systems Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Factory Overhead Planned, Applied & Actual
CHAPTER 11 PowerPoint Author: LuAnn Bean, Ph.D., CPA, CIA, CFE Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
Profit Reporting for Management Analysis Chapter M 4.
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
© 2007 Pearson Education Canada Slide 4-1 Cost Management Systems 4.
Absorption and Variable Costing Chapter 8 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Absorption Cost Systems Chapter Nine McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 2 Systems Design: Job-Order Costing PowerPoint Authors:
Accounting for Overhead Costs Introduction to Management Accounting Chapter 6.
1 3 Standard Costing, Variable Costing, and Throughput Costing
Accounting for Executives Week 8 6/5/2010 (Fri) Lecture 8.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 2 Systems Design: Job-Order Costing.
Accounting for Manufacturing Overhead
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
Inventory Costing Dr. Hisham Madi. Inventory Costing  The inventory costing system that is chosen determines which manufacturing costs are treated as.
© John Wiley & Sons, 2011 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management.
Cost Analysis for Management Decision Making
Cost Analysis for Management Decision Making
19 Standard Costs, Variable Costing Systems, Quality Costs, and Joint Costs.
Power Notes Chapter M4 Profit Reporting for Management Analysis
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
Job-Order Costing Chapter 3.
Job-Order Costing: Cost Flows and External Reporting
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Standard & budgeted costs
Job Costing, Overhead Calculation and Flow of Costs
The Islamic University –Gaza
© 2011 Cengage Learning. All Rights Reserved
The Master Budget and Flexible Budgeting
AMIS 3300 Chapter 9.
Presentation transcript:

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

Costs by Business Function a.k.a. the value chain R & D Manufacturing Marketing, Distribution, Sales

Costs Classified By Business Function ______ R & D PRODUCT MFG. GAAP PLANNING Marketing, & Distribution, Sales PRICING

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

Cost Flows for a Manufacturing Firm Raw Mat.s Direct Labor Mfg O/H W.I.P. F/G Inv. COGS = Balance Sheet account = expense account = Income Statement Account

Overview of Job Costing for Manufacturing Companies Manufacturing Overhead Machine Hours Indirect Costs Direct Costs Direct Labor Direct Materials Indirect Cost Pool Cost Allocation Base the “Job” Direct Costs

Five Step Approach To Job Costing 1Identify the cost object. 2Identify the direct cost categories for the job. 3Identify the indirect cost pools associated with the job. 4Select the cost allocation base for each indirect cost pool. 5Calculate the rate per unit of the allocation base to allocate indirect costs.

Calculation Of Overhead Rates Over- = total costs in the cost pool head total quantity of the cost Rate allocation base

Calculation Of Overhead Rates Over- = total costs in the cost pool head total quantity of the cost Rate allocation base When indirect costs are allocated using budgeted rates, step 5 involves the following: 5a For the budget period, prepare estimates of the total quantity of the cost allocation base to be incurred (or available). 5b For the budget period, estimate total indirect costs (overhead $$$). 5c budgeted indirect cost rate = 5b / 5a

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

Actual versus Budgeted Amounts Actual or budgeted rates for overhead. Actual or budgeted prices/rates of direct inputs. Actual quantities of direct inputs, or standard quantities based on actual production. Actual quantity of overhead, or standard quantity based on actual production.

Why Use Budgeted Amounts? Actual costs may not be known on a timely basis. Actual costs may be subject to short-run fluctuations. When actual O/H rates are used, production volume for one product affects the reported costs of other products. A system using budgeted numbers may be more economical.

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

The Levi Strauss factory in Albuquerque makes jeans and Dockers. Each product line has its own production line on the factory floor. Budgeted and actual overhead costs for the entire factory for 1997 were $1,200,000 and $1,100,000, respectively. Budgeted production for each product line was 500,000 units for the year (one million units for the factory in total). Actual production of jeans was equal to budget. However, actual production of Dockers was curtailed to 400,000 units, due to increased competition in the casual slacks market.

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using budgeted overhead dollars and production. Calculate the overhead allocation rate per pair of pants, using actual overhead dollars and production.

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using budgeted overhead dollars and production. Calculate the overhead allocation rate per pair of pants, using actual overhead dollars and production. $1,200,000  (500, ,000) = $1.20 per unit $1,100,000  (500, ,000) = $1.22 per unit

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using budgeted overhead dollars and production. Calculate the misapplied overhead: $1,200,000  (500, ,000) = $1.20 per unit

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using budgeted overhead dollars and production. Calculate the misapplied overhead: $1,200,000  (500, ,000) = $1.20 per unit $1.20 per unit x 900,000 units = $1,080,000 applied $1,080,000 applied - $1,100,000 actual = $20,000 underapplied.

Misapplied Overhead The use of budgeted overhead rates usually results in underallocated or overallocated overhead. Possible disposition of these variances include: 1) Restate to actual cost 2) Write off to COGS 3) Prorate between COGS & inventory 4) Treat as a period cost

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using actual overhead dollars and production. Calculate the misapplied overhead: $1,100,000  (500, ,000) = $1.22 per unit

Budgeted Overhead:$1.2 million Actual Overhead:$1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Calculate the overhead allocation rate per pair of pants, using actual overhead dollars and production. Calculate the misapplied overhead: $1,100,000  (500, ,000) = $1.22 per unit $1.22 per unit x 900,000 units = $1,100,000 applied $1,100,000 applied - $1,100,000 actual = $0 misapplied.

Misapplied Overhead Restatement using actual overhead rates is preferred conceptually, but is not necessarily the most conservative. Restatement can result in higher net income and ending inventory than write-off to COGS when variances are unfavorable. Is there justification for treating unfavorable variances as a period cost?

Budgeted O/H: $1.2 million Actual O/H: $1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Assume that the budgeted overhead of $1,200,000 consisted of $800,000 budgeted for variable overhead and $400,000 for fixed overhead. Also assume that the factory has the capacity to produce 1.5 million pairs of pants, and that the fixed overhead rate is calculated using capacity in the denominator. Calculate the budgeted overhead rates for fixed overhead and for variable overhead.

Budgeted O/H: $1.2 million Actual O/H: $1.1 million Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Assume that the budgeted overhead of $1,200,000 consisted of $800,000 budgeted for variable overhead and $400,000 for fixed overhead. Also assume that the factory has the capacity to produce 1.5 million pairs of pants, and that the fixed overhead rate is calculated using capacity in the denominator. Calculate the budgeted overhead rates for fixed overhead and for variable overhead. Variable O/H rate: $800K  1,000,000 = $.80 per unit Fixed O/H rate: $400,000  1,500,000 = $.27 per unit Total: $1.07 per unit

Budgeted O/H: $1.2 million; Actual O/H: $1.1 million. Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Assume that 500,000 direct labor hours were used in production in 1997, 200,000 for jeans, and 300,000 for Dockers. Calculate the overhead rate (one rate for both fixed and variable overhead) using direct labor hours as the allocation base, and using actual costs and actual labor hours. Using the allocation rate above, how much overhead would be allocated to jeans in 1997?

Budgeted O/H: $1.2 million; Actual O/H: $1.1 million. Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Assume that 500,000 direct labor hours were used in production in 1997, 200,000 for jeans, and 300,000 for Dockers. Calculate the overhead rate (one rate for both fixed and variable overhead) using direct labor hours as the allocation base, and using actual costs and actual labor hours. Using the allocation rate above, how much overhead would be allocated to jeans in 1997? $1,100,000  500,000 = $2.20 per direct labor hour

Budgeted O/H: $1.2 million; Actual O/H: $1.1 million. Budgeted production: 500K jeans, 500K Dockers. Actual production: 500K jeans, 400K Dockers. Assume that 500,000 direct labor hours were used in production in 1997, 200,000 for jeans, and 300,000 for Dockers. Calculate the overhead rate (one rate for both fixed and variable overhead) using direct labor hours as the allocation base, and using actual costs and actual labor hours. Using the allocation rate above, how much overhead would be allocated to jeans in 1997? $1,100,000  500,000 = $2.20 per direct labor hour $2.20 per direct labor hour x 200,000 direct labor hours = $440,000; which is $0.88 per pair of jeans.

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

Two Ways To Treat Fixed Manufacturing Overhead Variable Costing Also called Direct Costing Fixed Mfg O/H is a Period Cost Focus is on Contri- bution Margin This isn’t G.A.A.P. Absorption Costing Also called Full Costing Fixed Mfg O/H is an Inventoriable Cost Focus is on Gross Margin This is G.A.A.P.

What Costs Are Included In Inventory? Variable Costing Absorption Costing Variable manufac- turing costs (& any direct, fixed costs) Fixed Manufacturing Overhead Non-manufacturing costs (e.g. selling, general & admin.)

Example comparing absorption costing and variable costing 10,000 units are made and sold. Each unit sells for $350. Variable mfg costs are $150 per unit. Fixed mfg costs are $700,000. Variable non-mfg costs are $50 per unit. Fixed non-mfg costs are $400,000.

Gross Margin Income Statement COGS: $700K FMOH ÷ 10K units = $70 per unit $150 variable mfg + $70 FMOH = $220 per unit. Sales$3,500,000 Cost of Goods Sold 2,200,000 Gross Margin 1,300,000 Non-manufacturing costs 900,000 Income$ 400,000

Contribution Margin Income Statement Sales$3,500,000 Variable Costs Manufacturing costs 1,500,000 Non-manufacturing costs 500,000 Contribution Margin$1,500,000 Fixed Costs Manufacturing costs 700,000 Non-manufacturing costs 400,000 Income$ 400,000

November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable Costing The Eskimo Pie Company

The Eskimo Pie Company makes and sells the famous Eskimo Pie ice cream bar. The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non-manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non- manufacturing costs are $0.10 for each Eskimo Pie sold.

The Eskimo Pie Company The Eskimo Pie Company makes and sells the famous Eskimo Pie ice cream bar. The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non- manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non- manufacturing costs are $.10 for each Eskimo Pie sold. Required: 1. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and sells 19,999 Eskimo Pies, what is the cost of ending inventory under Absorption (i.e., Full) Costing?

The Eskimo Pie Company The company’s cost structure is as follows: fixed mfg O/H costs per month are $50,000. Variable mfg costs are $1.40 for each delicious Eskimo Pie. Fixed non-mfg costs (selling, general and administrative costs) are $27,000 per month. Variable non-mfg costs are $.10 for each Eskimo Pie sold. 1.If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and sells 19,999 Eskimo Pies, what is the cost of ending inventory under Absorption (i.e., Full) Costing? F.M.O.H. rate = $50,000 ÷ 20,000 pies = $2.50 per pie. $2.50 fixed mfg + $1.40 variable mfg = $3.90 per pie $3.90 per pie x 1 pie = $3.90

The Eskimo Pie Company The Eskimo Pie Company makes and sells the famous Eskimo Pie ice cream bar. The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non- manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non- manufacturing costs are $0.10 for each Eskimo Pie sold. Required: 2. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and sells 19,999 Eskimo Pies, what is the cost of ending inventory under Variable Costing?

The Eskimo Pie Company The Eskimo Pie Company makes and sells the famous Eskimo Pie ice cream bar. The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non- manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non- manufacturing costs are $0.10 for each Eskimo Pie sold. 2. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and sells 19,999 Eskimo Pies, what is the cost of ending inventory under Variable Costing? $1.40 per pie x 1 pie = $1.40

The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non-manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non-manufacturing costs are $0.10 for each Eskimo Pie sold. Required: 3. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and doesn’t sell any pies, what is net income (loss) for the month under Absorption (i.e., Full) Costing? The Eskimo Pie Company

The company’s cost structure is as follows: fixed mfg overhead costs per month are $50,000. Variable mfg costs are $1.40 for each delicious Eskimo Pie. Fixed non-mfg costs (selling, general and administrative costs) are $27,000 per month. Variable non-mfg costs are $0.10 for each Eskimo Pie sold. 3. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and doesn’t sell any pies, what is net income (loss) for the month under Absorption (i.e., Full) Costing? $27,000 loss (fixed non-mfg costs). (All mfg costs are capitalized in ending inventory, and no variable non-mfg costs have been incurred.

The Eskimo Pie Company The Eskimo Pie Company makes and sells the famous Eskimo Pie ice cream bar. The company’s cost structure is as follows: fixed manufacturing overhead costs per month are $50,000. Variable manufacturing costs are $1.40 for each delicious Eskimo Pie. Fixed non- manufacturing costs (selling, general and administrative costs) are $27,000 per month. Variable non- manufacturing costs are $0.10 for each Eskimo Pie sold. Required: 4. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and doesn’t sell any pies, what is net income (loss) for the month under Variable Costing?

The Eskimo Pie Company The company’s cost structure is as follows: fixed mfg overhead costs per month are $50,000. Variable mfg costs are $1.40 for each delicious Eskimo Pie. Fixed non-mfg costs (selling, general and administrative costs) are $27,000 per month. Variable non-mfg costs are $0.10 for each Eskimo Pie sold. 4. If the company begins the month with zero inventory, manufactures 20,000 Eskimo Pies, and doesn’t sell any pies, what is net income (loss) for the month under Variable Costing? $27,000 + $50,000 = $77,000 loss. (The variable mfg costs are capitalized in ending inventory, and no variable non-mfg costs have been incurred.)