15.-17.March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB.

Slides:



Advertisements
Similar presentations
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Advertisements

NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Polarity of the MERIT Magnet H. Kirk (Feb 7, 2008) Update 12 Feb: The CERN power supply group claims that the RED lead of the magnet was + (as per usual.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
MERIT pre-installation review: Preliminary conclusions A.Fabich.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Territorial Safety Officer (TSO) - Initial The TSO function2.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
RICH MEETING - CERN - April 21 st 2004 Università degli Studi di Milano Bicocca Variation of Refractive Index inside an Aerogel Block Davide Perego.
Towards new Graphical User Interfaces for nTOF experiment Collaboration meeting, Bologna 28 th Nov 2013 Towards new Graphical User Interfaces for nTOF.
Status of n_TOF Facility
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Meeting between Users’ Office, LHC experiments, GS/AIS Doris Chromek-Burckhart Head of CERN Users’ Office 16. November 2012.
Henryk Piekarz SC Magnets at Fermilab HTS Cable Test for a Fast-Cycling Accelerator Dipole Magnet E4R Test Goals and Arrangement Review September 10, 2009.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
MERIT status A.Fabich CERN VRVS 9 th Oct A. Fabich, CERN, VRVS 9th Oct 2007.
Researchers Supervisors Local Coordinators Administrators EU- Coordinators Industrial Partners Assoc. Partners.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
MERcury Intense Experiment Experiment Layout
CLEX* Status and Plans CTF3 complex CLEX
The TSO function (Territorial Safety Officer)
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
The Proposed TT2A Target Experiment
Learn about Office 365 Groups and how to use them
Status on the PS/SPS  MERIT (nTOF11) interface
The Proposed TT2A Target Experiment
Place a hold on a checked out item
MERIT pre-installation review: Preliminary conclusions
MERIT beam request A.Fabich CERN AB-ATB
Sun Mon Tue Wed Thu Fri Sat
DSC Credit Committee DSC Credit Committee – Present
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
MERIT – status and schedule
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Presentation transcript:

March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB

Agenda datetimepurposepersons requiredroom Tue 15th10:00-12:15CryogenicsF.Haug B 13:45-16:00visit TT2A P. Carbonez, A. Dorsival, S. Prodon, Y. Bernard, C. Lacroix & everybody interested ISR/TT2/TT2A 16:00-17:00transport Wed 16th 10:45-12:15SC/mercury loopA. Desirelli, J. Gulley A 13:45-15:15SC/power, solenoidF. Szoncso, F. Corsanego A 15:30-17:00SC/radiationT. Otto, M.Silari A Thu 17th9:00-10:30Power supplyC. Martins, K. Kahle A 10:45-12:15other issuescollaboration members A 13:45-15:15 mercury loop, diagnostics J.Lettry A 15:30-17:00 Summary on safety issues SC members A

Official representation CERN grey book, experiment database CERN grey book, experiment database See example of other experiments See example of other experiments According user’s office: According user’s office: Contact person: H.Haseroth Contact person: H.Haseroth Webpage Webpage greybook greybook Experimental (our own) Experimental (our own)

Control Room Contacts: Contacts: TSO: TSO: (next to gallery under ISR) (next to gallery under ISR) (stockage at antrance) (stockage at antrance) occupied 1 2

Beam windows Deflection by solenoid Deflection by solenoid Beam scan on purpose Beam scan on purpose Beam spot size at exit/entrance Beam spot size at exit/entrance Total beam loss; false steering of dipoles (see TT40 tests) Total beam loss; false steering of dipoles (see TT40 tests)

cryogenics preliminary results from M.Silari et al.: basic message basic message Ventilate to TT10 Ventilate to TT10 bg: 3.7 TBq bg: 3.7 TBq Activation of LN2 Activation of LN2 120 L 120 L min min min min min min Long-term contribution Long-term contribution ~10 ‰ of bg o.k. ~10 ‰ of bg o.k. spikes?? spikes?? If nToF running … If nToF running …

Organizational structure Inside Inside Outside Outside With persons from CERN groups etc. With persons from CERN groups etc.

Safety Definition of GLIMOS Definition of GLIMOS General linkman in matters of safety General linkman in matters of safety