GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT ProjectTrigger Scheduler, Engines, and Rates 6 Feb 2006 J. Eric Grove Naval Research Lab Washington DC Trigger Scheduler, Engines, and Rates.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
TkrRecon Status Perugia Software Workshop May, 2003.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
1 May 27, 2005 Comparison tower A data and Montecarlo OVERVIEW Comparison of MC (EM- v 4r060302p18 ) and tower A data using the “baseline” run (Run )
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project Technical/Cost/Schedule Review 05/24/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Throttle Studies David Wren Analysis Group Meeting 22 March 2004.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
GLAST LAT tracker signal simulation and trigger timing study
Overview of Instrument Analysis Effort
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Calorimeter calibrations with Flight Software.
Overview Goal Study GEM variables in SVAC ntuple
TKR to CAL for 16 Towers The usual TKR extrapolation to CAL study, for the 16 tower data. Check calibrations, look for problems, etc. Today -- “work in.
Mini Tower Preliminary Results
Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Shaped Digital Readout Noise in CAL
SVAC Configuration Verification
Presentation transcript:

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally took data!)

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 2/31 Overview of End to End Runs We successfully completed all end to end runs for Tower A The infrastructure for data analysis is in place and working well –All plots in this presentation were obtained from the SVAC reports which are automatically generated at the end of the runs –Please use them and give us feedback Two tower tests will occur in 1 to 2 weeks –We need to look at these data to provide inputs to the test plan

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 3/31 Retrieving end to end runs Go to the Runs databasedatabase To get all runs Query on –Script name: end2end –Completion Status: PASSED –Duration: > 100 –Bear in mind that Americium runs are 1 min long ! Look at Config report and digi and recon reports –Currently we are updating the reports based on the results from these runs –Comments are welcome –Please come to our Friday meetings if you want to participate

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 4/31 Retrieving Runs from the Database Can select only one test ID For all runs fill the fields the red boxes

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 5/31 Results from Database… Data Quality Reports TEST ID Serial Number

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 6/31 Run Numbers (1) There are more runs with ID’s 4/5 and 4/6

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 7/31 Run Numbers (1)

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 8/31 Event Trigger Rate CAL_LO only Am241 VDG 1 kHz 5 kHz 10 kHz 20 kHz 1 kHz Horizonta cosmicsl 4 range Zero Sup OFF 10 KHz 10 kHz VDG Rates agree to expectations

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 9/31 Error Events for Tower A Read TKR from one side only So far we found no packet nor parity errors. Only TEM errors were found VDG

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 10/31 Number of Events for Tower A Am241 CAL_LO only 4 range Z. Sup OFF VDG 2 hour runs VDG

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 11/31 Event Size for Tower A (bytes) Z. Sup OFF 4 range Z. Sup OFF 4 range Z. Sup OFF CAL_LO only VDG Z sup OFF For Cosmic rays expected about 300 bytes, CAL 4 range, TEM diag ON, Z Sup ON 200 bytes, CAL 1 range, TEM diag OFF, Z Sup ON 1700 bytes, CAL 4 range, TEM diag ON, Z Sup OFF VDG Z sup ON

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 12/31 Size of Raw FITS file 2 hour runs VDG Am241 Z. Sup OFF Every file is below 100 Mbytes, for 2 towers we want to raise the limit to 200 Mbytes

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 13/31 Digi File Size (Mbytes) Zero Sup OFF Zero Sup OFF

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 14/31 Recon File Size (GBytes) Digi timed out in pipeline 4 range has a bug in recon (fixed on the next relesease) 4 range has a bug in recon (fixed on the next relesease) Am241 and Some VDG runs Not available prior to this talk Pipeline had a recon limit of 1.8 Gbytes in jobOptions (left over from the times when we did not have ROOT 4) and some jobs failed. We also believe we need a faster turn around on processing of recon files, maybe for 2 tower tests we need to try the special queue deal with SCS

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 15/31 Ratio of Digi/Raw I am sure Heather will have fun looking into these differences….

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 16/31 Ratio of Recon/Digi file Now Heather will have a blast…. It deserves some investigation… Zero Suppression ON Zero Suppression OFF

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 17/31 Baseline Run , ID 1/1 : GEM Triggers TKR ~ DAC 30 CAL_LO ~ 100 MeV (rate agrees with expected rate when only CAL_LO is turned on see ID 3/1) TKR + CAL_LO CAL_HI ~ 1 GeV (what are these events?) TKR + CAL_HI TKR + CAL_LO Can we have a “pure” CAL_HI without a CAL_LO?

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 18/31 CAL_HI Trigger: Run event Didn’t trigger the tracker with 14 clusters associated with a track?!!! CalEnergySum = 25 MeV

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 19/31 CAL_HI Trigger: Run event Triggered CAL_HI with 24 MeV? CalEnergySum = 24 MeV

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 20/31 CAL_HI Trigger: Run event 7602 CalEnergySum = 44 MeV

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 21/31 CAL_HI Trigger: Run event CalEnergySum = 143 MeV

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 22/31 CAL_HI Trigger: Run event Didn’t trigger the tracker with 14 clusters associated with a track?!!! CalEnergySum = 56 MeV

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 23/31 External 1 KHz Run , ID 4/1: GEM Triggers TKR ~ DAC 30 CAL_LO ~ 100 MeV TKR + CAL_LO CAL_HI ~ 1 GeV TKR + CAL_HI TKR + CAL_LO We will modify SVAC reports to have better resolution on plots External triggers (last bit) from pulse generator External + software triggers

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 24/31 Runs with different TKR thresholds Run , ID 1/1, LOW Threshold TKR DAC ~ 30 Run , ID 2/3, NOMINAL threshold TKR DAC ~ 22 Fraction of events with Strip hits but TOT = 0

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 25/31 TKR readout from one side only: Average TOT Only LO/Left side cables are read out Only HI/Right side cables are read out Run , ID 2/6 Run , ID 2/7 Note that the color pattern is remarkably similar for both runs Units of counts 1 count = 200 ns

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 26/31 Lower TKR thresholds : Number of hit planes 0.22% < 6 planes 0.07% < 6 planes Run , ID 1/1, TKR DAC ~ 30 Run , ID 2/3, TKR DAC ~ 22

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 27/31 High Rate Runs Am241 (TKR and CAL are allowed to trigger) Only the pulse generator Is allowed to trigger (1 kHz) Run , ID 4/5 Run , ID 4/6

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 28/31 GEM Time Interval : High Rate Runs Run , ID 4/5 Run , ID 4/6 Run , ID 4/1 Run , ID 4/2 5 kHz (TKR and CAL are allowed to trigger) Only the pulse generator Is allowed to trigger (1 kHz) TKR and the pulse generator are allowed to trigger (1 kHz) TKR, CAL and the pulse generator are allowed to trigger (5 kHz)

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 29/31 VDG Runs Tower boundary Reconstructed XY positions Fraction of events with 0 hits (red means 0 events) Very few events make into the thick layers ~ 80% of events have at least one track Run , ID 9/1 Trigger rate ~ 100 Hz

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 30/31 High Priority “Projects” Demonstrate that the pulse generator works as expected. –Do we have all the configurations we need to understand the behavior at high rates? –Should we lower the CAL LAC threshold (for one column) to load the CAL with data and allow a fair comparison of deadtime? Do files sizes and deadtime make sense for the possible permutations of the main register configurations? –(1/4) CAL range readout, zero suppression (ON/OFF), TEM diagnostics (ON/OFF) Are there differences in distributions that could be ascribed to different timing when reading out only from LO or HI side of TKR cables? –Of course use baseline as a reference Are there idiosyncrasies in the Error events? –Need to explore in electronics and physical space Need to study topologies and rates of different trigger types –As many runs as possible More ideas? –Volunteers?

GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 31/31 Summary This week we all made an spectacular progress ! –Thank you all Today we will change the code in the pipeline (bug fixes) –We will reprocess all runs Depending on your analysis you do not need to wait for the pipeline –Go ahead and adopt a run Please let me know how you want to contribute for the data analysis –We need to plan quickly for the two tower tests that will happen in 1 to 2 weeks