Progress on Target Design Chris Booth Sheffield 14 th July 2004.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
ILC Rotating Target - Active Sliding Contact Cooling Wei Gai, Manoel Conde, Wanming Liu, Scott Doran, Vic Guarino, George Fenske (ES), Robert Erck (ES),
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
1 Beamline DayTimePresenterTopic Thurs9:00C.BoothMICE Target Wed16:00K.TilleyRecent Beamline Design Work Wed16:30T.RobertsMICE Beamline Performance + Emittance.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Target Development Lara Howlett University of Sheffield.
1 Beam and Target Issues Chris Booth 5 th May 2004.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Design of an Inertial Fusion Energy Target Injection & Tracking System Ronald Petzoldt, Dan Goodin, Mike Hollins, Chuck Gibson, Neil Alexander, and Gottfried.
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Chris Booth Sheffield 29th March 2006
Muon Ionisation Cooling Experiment Overview
Oleksiy Dolinskyy December 1st, 2014
MICE The International Muon Ionisation Cooling Experiment
Produktentwicklung und Maschinenelemente
Status of Target Design
Parameters of the NF Target
Presentation transcript:

Progress on Target Design Chris Booth Sheffield 14 th July 2004

Chris BoothUniversity of Sheffield 2 Components Linear Drive Diaphragm Spring suspension Position measurement system Drive waveform Feedback and control Operating environment concerns Radiation Beam heating

Chris BoothUniversity of Sheffield 3 Diaphragm spring Target Array of coilsMagnet(s) Position measurement Schematic design Linear Drive

Chris BoothUniversity of Sheffield 4 Linear Drive Work with Electrical Engineering Dept. Pre-prototype constructed –Moving magnet shuttle (2 magnets) –Static triple coil excitation –No commutator Does not provide required acceleration Measurements taken to measure and optimise flux-linkage Multi-phase design in progress (end July?)

Chris BoothUniversity of Sheffield 5 Diaphragm spring Target Array of coilsMagnet(s) Position measurement Schematic design Linear Drive

Chris BoothUniversity of Sheffield 6 Diaphragm Spring

Chris BoothUniversity of Sheffield 7 Diaphragm Spring suspension Design of small spring obtained from Tom Bradshaw (RAL) Scaled up to allow ≥37 mm travel Finite element studies to check stress and lifetime issues (Lara Howlett) Be-Cu sheet procured Wire-erosion arranged in Eng. Dept. workshop Produce first batch early August

Chris BoothUniversity of Sheffield 8 Diaphragm Spring

Chris BoothUniversity of Sheffield 9 Diaphragm spring Target Array of coilsMagnet(s) Position measurement Schematic design Linear Drive

Chris BoothUniversity of Sheffield 10 Position measuring system Inductive linear measuring system (Hengstler) Low mass moving scale Fixed magnetic read head Contact-free Resolution 50µm PCI-card readout Bench tests in progress, software under development

Chris BoothUniversity of Sheffield 11 Electronic Drive & Control PC-controlled arbitrary function generator High power audio amplifier (500 W? Specs. not yet finalised) Feedback & control system (to be developed) –Operator request (time & depth) –Position measurement samples (0.1 ms) –Load modified drive waveform into function generator

Chris BoothUniversity of Sheffield 12 Environment – Radiation What is radiation level at drive motor? –Problem for Nd-Fe-B magnets? Radiation level at position monitor? –Problem for electronics? –Radiation profile? Advantage in moving sensor or electronics out? –Possibility of shielding? Programme of measurements proposed for autumn ISIS run – radiation monitors plus samples magnets etc.

Chris BoothUniversity of Sheffield 13 Beam heating Tom Roberts’ presentation to collaboration meeting (30th March): “1.4E12 protons on target” to deliver 300 – 500 good muons to MICE Implies ionisation heating of 1.9 kW in 1 ms –Mean power Hz, Hz Fins to improve thermal radiation? Thicker shaft to improve conduction? (Curie point of magnets?) Effect on overall mass? Need better estimate of beam flux Model, plus tests with heating element in vacuum

Chris BoothUniversity of Sheffield 14 Timetable (as presented 30/3/04) First prototypeSummer 04 Develop controlAutumn 04 System testsWinter Cooling, stability testsSpring-Summer 05 Rad-hard componentsSpring-Summer 05 Interfaces with ISISSpring-Summer 05 Implement improvementsSummer 05 Final device construct/testAutumn-Winter 05 InstallWinter-Spring 06