PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.

Slides:



Advertisements
Similar presentations
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
Advertisements

DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
1 Visible Flexure Camera Analysis J. Kent Wallace March 14, 2006.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
ASTRI SST-2M The Prototype monolithic 1.8 m
RF Cavity / Coupling Coil Module
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
LBT Q Engineering Review TAL Telescope Alignment.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
NCI Clinical Trials Reporting Program CTRP User Meeting July 6, 2011 Gene Kraus CTRP Program Director.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
Office of Research and Sponsored Programs William S. Messer, Jr., Ph.D. Vice President of Research.
The Active Optics System S. Thomas and the AO team.
Task M2 – Working group Auriga-LNL Operation temperature KOperation temperature K Mechanical Attenuation >180dB in the frequency range.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Preparing the telescope and CCD-camera for observations Andrych K, Tvardovskyi D.
Demolition Management and Monitoring Contract Update December 13,
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
eMerger Integration Planning
LBT Q Engineering Review SAB Static Balancing.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
System Performance Metrics and Current Performance Status George Angeli.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Environmental Sustainability Master Plan Update November 18, 2015.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Development of a pellet tracking system for PANDA and WASA Goal:  know interaction point with a few 100  m accuracy in 3d(xyz). Method: Track pellets.
Risk Assessments: Guidelines for Completing
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
WBS 1.03 Readout Systems Scope, Cost and Schedule
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Budget Budget Contingency/ Cost Risks Descope Options
Management Breakout: MREFC Budget Summary Victor L
Marketing Plan A marketing plan is a part of an overall business plan.
Launch and On-orbit Checkout
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
USP-IAG Universidade de São Paulo
Q2: Do the following problem from your textbook. Be prepared to share your answers. Page 55 problem s 1-6.
Fermi Lab – 2019 CMB-S4 Workshop
MET workshop Eldin Mukovic
TEMPO Instrument Update
Presentation transcript:

PALM-3000 HOWFS - 5/29/09 C. Baranec

PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera modes – RN/DC (JR, ? days) New HOWFS structure (detail next…) – (ME, ?) Document alignment plan - (CB, 1 day) Labview alignment feedback - (CB+, 3+ days) Realign telescope simulator – (CB, 1 day) Second alignment (prior testbed) – (CB, 7 days) Amendments to alignment procedure – (CB, 1 day) 2

PALM-3000 Mechanical Engineering Update 3 Task #PriorityDescriptionStatus 11CCD50 kinematic mountFabrication by June 1 st 21CCD50/relay baseplateFabrication by June 1 st 31Collimating optics supportSolidworks model 41Main HOWFS/ACam baseSolidworks model 52ACam optics mountsConceptual 62ACam camera mountConceptual 73Field stop with ACam mirrorConceptual 84EnclosureConceptual Current flexure analysis estimates the flexure of the HOWFS is ~0.1”/hour passive, NOT including compliance of ATS150. Error budget is for 0.1”/hour with ATS150…

PALM-3000 Summary Total labor: CB – ~15 days JR – CCD testing modes, integration ME – ongoing time from Khanh Bui AB – integration Additional Fabrication costs: SciMeasure camera modes - ? Mechanical fabrication - ? New optics (col, cyl) - $1000 4