First Integration Tests Jovan Mitrevski, John Parsons Nevis Labs, Columbia University August 21/2003  on July 30/31, we successfully performed first phase.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Service Board Production Test Rafael Nobrega LHCb Roma1.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
DCZ status & results B A B AR Trigger Workshop, December 2004 Jamie Boyd University of Bristol for the Trigger Upgrade Group.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Trigger Framework Tutorial Dan Edmunds Michigan State University 14-Apr-2009 The purpose of this talk is to present the general features of the Trigger.
H. EvansD0 PMG: 1-Apr-031 Changes to the GAB Current System Architecture Changes to GAB to Streamline this Architecture How this Affects the Schedule/Costs.
H. EvansRun IIb Trigger Meeting: 26-Feb-04 1 Ensuring Success for L1Cal in Run IIb H. EvansColumbia U. Outline 1.Pre-Installation (extensive use of Test.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
H. EvansRun IIb L1Cal Meeting: 1-May-031 Goals of the Summer Integration Test Summer Integration Schedule –16-Jul-03 – 8-Oct-03 Test Infrastructure –what.
DØ L1Cal Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of Russian.
P07301 Summary Data Acquisition Module. Team Members.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Lecture 20: Communications Lecturers: Professor John Devlin Mr Robert Ross.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
5 Dec., 2001 A summary of system tests at BNL related to the ROD presented by Kin Yip From a user point of view : Description of the system of the test.
PROGRESS ON ENERGY SUM ELECTRONIC BOARD. VXS Backplane Energy Sum 18 fADC VME64 High Speed Serial VME64 16 CH Detector Signals Crate Sum to Trigger Energy.
HB LED Pulser Boards By Michael Miller The University of Iowa.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
The Snap-12 Snooper Albert Delp University of Arizona Mentors: Ken Johns, Joel Steinberg, Dan Tompkins.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
Experience with DAQ for ATLAS SCT
Status of the Beam Phase and Intensity Monitor for LHCb
Regional Cal. Trigger Milestone: Major Production Complete
7/10/2017 John Podczerwinski, Horatio Li
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CMX Status and News - post PRR -
ورود اطلاعات بصورت غيربرخط
ZDD status BESIII Collaboration Meeting, September 2012
G. Steinbrück STT meeting
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Presentation transcript:

First Integration Tests Jovan Mitrevski, John Parsons Nevis Labs, Columbia University August 21/2003  on July 30/31, we successfully performed first phase of Integration Tests of new L1CAL trigger at FNAL  VMESCL board was successfully installed and integrated  thanks to Dan for his support before and during the tests

Integration Tasks  Infrastructure installation on platform next to MCH  Installed rack with 9U (TAB) and 6U (ADC/FIR) VME crates  Installed Linux-based PC for DAQ, and Windows-based PC for firmware development  Installed Bit3 VME card in 9U crate  Installed VMESCL card in 9U crate  Installed SCL Receiver daughtercard on VMESCL card  “Offline tests” (using CLK from VMESCL on-board oscillator)  Verified can reset VME bus  Verified communication with VMESCL card  Read VMESCL status register  Write/read VMESCL scratch registers  Switch between Offline and Online modes

Integration Tasks (cont’d)  Online tests  Verified proper reception and locking onto SCL CLK in Online mode  Verified proper reception and response to SCL signals: 1. Initialization  SCL INIT recognized and sent on to TABS (checked with scope since TAB was not installed)  VMESCL local bunch crossing counter properly reset by first Turn signal after INIT, and then counts in agreement with lower bits of SCL BCID 2. Triggering  L1Periods and L1Accepts recognized  L1 trigger properly sent on to TABS for (L1Period AND L1Accept)  After successful completion of tests, Bit3 + VMESCL were sent back to Nevis  Will need to be re-installed for next stage of integration tests, including one TAB