RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 1 Progress.

Slides:



Advertisements
Similar presentations
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 WP 1.1 Description of work (month.
Advertisements

GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
IDEAS Business models to underpin Energy Positive Neighbourhoods Dr Tracey Crosbie Teesside University INTERNATIONAL CONFERENCE SUSTAINABLE PLACES October.
Sprawling Cities and TransporT From Evaluation to Recommendations.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Béatrice COUTURIER Grand Lyon RENAISSANCE LYON WP Progress and Plans WP 1.1: Energy Policy, Planning, Resarch and Development.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON State.
Malorie CLERMONT Local Leader on WP1.5 - Hespul RENAISSANCE LYON – 28/04/2009- Lyon Technical Seminar WP 1.5: Socio-economic activities – Presentation.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 WP0.1 (international.
RHONALPENERGIE -ENVIRONNEMENT Regional energy and environment agency www. raee.org.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON Introduction.
Promoting Energy Efficiency In Buildings in Developing countries.
Integrated Projects Spetember 2013 Maja Mikosinska DG Environment European Commission.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH German – Macedonian technical cooperation GTZ Project for Technology Transfer PAXIS European.
HOUSING EUROPE 1 CECODHAS European Liaison Committee for social housing August 2008 CECODHAS MISSION CECODHAS is the European Committee for social housing,
Project Implementation Plan and Principal Activities
CEDRE Dr. ImadHageChehade Jun. 7 th OUTLINE  Building history  Green buildings and their advantages  Why build Green ?  Green building certification.
Institutional Evaluation of medical faculties Prof. A. Сheminat Arkhangelsk 2012.
Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.
ESPON 2020 Cooperation Programme EU Stakeholder consultation 27 March 2013 ESPON renewal, refocus and upgrade: Mission, Priority Axes, Specific Objectives,
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 WP0.1 (international.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Dissemination leaders Hespul & Grand Lyon RENAISSANCE LYON WP Progress and Plans WP 4: Dissemination and Promotion.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 5.1.
Green Building Creating sustainable and high performance buildings.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 2 Progress.
1 1 Sustainable Energy for communities RENAISSANCE Concerto Coordinators’ meeting – 22 Oct Sylvain Koch-Mathian CONCERTO - RENAISSANCE project Coordinator.
WHY IS IT IMPORTANT THAT LOCAL GOVERNMENTS ARE INTERNATIONALLY RECOGNISED IN THE POST-2012 GLOBAL CLIMATE AGREEMENTS The local and regional perspective.
TERRITORIAL EMPLOYMENT PACT OF VALLÈS OCCIDENTAL DESCRIPTION OBJECTIVES OUTLINE THE VALLÈS EXPERIENCE EQUAL SEMINAR.GREECE, September 2002.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 Christophe Ménézo Professor.
Malorie CLERMONT Local coordination - Hespul RENAISSANCE LYON WP Progress and Plans WP 1.5: Socio-economic activities.
Malorie CLERMONT Local coordination & Hespul RENAISSANCE LYON WP Progress and Plans WP 4: Dissemination and Promotion.
1 Project supported by the European Commission ECREIN Platform in Rhône-Alpes (RA) Policies and financial instruments dedicated to the first stages of.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON Working.
ERRIN ENERGY INFODAY 2015 The next steps towards the development seminar for the Energy H Calls 2015 VLEVA office – 10th September 2014.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 2 Progress.
Malorie CLERMONT Chargée de mission & Hespul RENAISSANCE LYON WP Progress and Plans WP 1.5: Socio-economic activities.
Action towards Resource-efficient and Low Carbon Cities in Asia
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP3.
REGIONAL POLICY EUROPEAN COMMISSION The contribution of EU Regional/Cohesion programmes Corinne Hermant-de Callataÿ European Commission,
Samir BOUKHALFA AGENCE LOCALE DE L’ENERGIE DE L’AGGLOMERATION LYONNAISE RENAISSANCE LYON – Meeting in Milano 27-29/10/2008 WP Progress and Plans WP 1.3:
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
Malorie CLERMONT / Béatrice Couturier Local coordination - Hespul & Grand Lyon RENAISSANCE LYON – 28 th April 2009-Lyon Workshop WP 0.2: local Management.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Samir BOUKHALFA AGENCE LOCALE DE L’ENERGIE DE L’AGGLOMERATION LYONNAISE RENAISSANCE LYON – Meeting in LYON 27-29/04/2009 WP Progress and Plans WP 1.3:
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
Ermis Project Final conference 5th November 2012 Municipality of Cesena Lia Montalti Councillor for environmental Sustainability, Energy policies and European.
The building efficiency and district energy relationship and opportunities for action in cities: Building Energy Accelerator and District Energy in Cities.
Turin Final Conference 25 September 2014 Work Group 1 Cordelia Koenig Ministry of Urban Development and Environment Hamburg Turin Final Conference 25 September.
ACTO-Project: Monitoring Deforestation, Logging and Land Use Change in the Pan Amazonian forests Presentation Suriname 16th May 2012.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Engineering Main branches within Engineering CHEMICAL CIVIL ELECTRICAL
Saleh Al-Jufout/Tafila Technical University
Results and rollout of the pilot project in Poland
Project Coordination Group (PCG) for the implementation of the MSFD
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Project Coordination Group (PCG) for the implementation of the MSFD
GPP Training Toolkit An Introduction European Commission
Sustainable buildings
Information on projects
European Commission, DG Environment, Marine Unit
Center for Analysis of Economic Reforms and Communication
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Presentation transcript:

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 1 Progress and Plan R&D Christophe Ménézo A/Prof & INSA Lyon-CETHIL (Thermal Science Centre of Lyon)

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 2 WP 1.1 Energy and Urban Planning Aims : - to make profitable the scale of the operation and the innovation possibilities as regards energy policy - to integrate the results in the local and national policies to allow an immediate application - to share results of experiences with of other developers /planers 90% achieved No particular problem or deviations from plan ENERTECH

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 3 Development in Energy Policies of innovations provided by CONCERTO : Wood Fire Heating systems integrated in urban media used for other urban projects of Lyon agglomeration (Sathonay Camp planned in – Bron Teraillon : diagnostic of existing system and study of Wood fuel solution) Integration of results of this innovative project in local and national policies : - reference framework for sustainable housing : done & applied ° 3225 housing concerned ° experience feedback (economic and operational : environment management, over cost identification, …) - reference framework for office buildings : done & in test process m2 in planning process WP 1.1 State Of Progress (7/2007)

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 4 Other part of local policy: collaboration with Rhône-Alpes Region in order to promote the Building Environmental Quality for the social housing with adapted assistance => Reference framework in process National level : - project followed by ADEME - Enertech implied as a consultant of the group “isolons la terre” (insulating the earth). Target : reduction of heat consumption below 50 KWh/sq.m./year in renovated older buildings - CONCERTO : reference program for debate on High Efficiency Buildings WP 1.1 State Of Progress (7/2007)

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 5 WP 1.2 Ecobuildings Definition & Validation of the Objectives Accompaniment of the Design => Finished Checking of program performance objectives (numerical simulation for energy consumption and thermal comfort) => Finished Checking of Consultation Documents established by developers for selection of building companies Finished for 1 block. In process for the 2 others ENERTECH

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 6 Accompaniment and Analysis of the « Wood » Projects - Data have to be validated - Companies Consultation Documents are analyzed - Asked for design allowing the reversibility of the burner rooms Sustainable provisioning through local resource development Preparation and programming of study "Coppice of short rotation“ less than 5 years (next 18 months) WP 1.3 Wood Fuel

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 7 WP 1.3 Wood Fuel Maintenance contracts - State of the actions carried out by the promoters on equipment managements - Information retrieval and meets professionals - Launching of a technical and legal study (subcontracting) - Returned and Exchange with the promoters A notice will be ready in September

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 8 WP 1. 4 Commercial and Fiscal Solutions Impact of the program concerto on the level of the rents of balance or the selling prices Analysis of prices and Comparison with assessments of social housing operations concerned with reference framework (see WP1.1) Impact of Concerto on the level of financial loads Impact on the total cost for the tenant (rent + loads) and on the accessibility of the residences °A delay concerning the beginning of the Analysis °Will be led by a specialized department which will carry out this analysis with the concerned actors

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 9 WP 1. 5 Socio-Economic Analysis 2 types of activity Concert’action program development and implementation analysis of construction stakeholder interactions implementation of activities to ensure quality construction appropriation of high performance building by future inhabitants

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 10 WP 1. 5 Socio-Economic Analysis Concert’action project Actions completed : Definition of the technical and financial specifications for Lyon (based on common specifications for Concerto 1 French cities) Request for national co-financing (ANR-PREBAT) Definition of means for the training of construction workers Actions to be carried out : Adapt the activities according to co-financing possibilities Implement the training of construction workers

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 11 WP 1. 5 Socio-Economic Analysis Activities targeted to future inhabitants Completed actions : none Future actions : 3 phases Phase 1: to understand the level of interest that future purchasers have for high the energy performance buildings - sales phase: ongoing Phase 2 : to define and help with the creation of tools (guides) for building appropriation - appartment delivery phase: Phase 3: to analyse the sociological reasons for monitoring results (energy comsuption levels)- occupation phase: 2010

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 12 Christophe Ménézo Tel: WP leader contact ENERTECH