PALM-3000 1 PALM-3000 project status 31 Jan. 2008 COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov. 2007. AO system offline for maintenance.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Wavefront Correction SystemWavefront Correction System Hardware and Software.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
High-Order Deformable Mirror
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
P3K RTC Status Tuan Truong & Mitchell Troy P3K Team Meeting #4 7/19/2007.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Infrared Wavefront Sensor (IR-WFS) Yutaka Hayano Internal Meeting on Future Instrument Projects at Subaru April 26, 2010.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
IT Governance & Portfolio Management Update Bill Boroski Computing Sector All-Hands Meeting June 13, 2014.
PACMAN : technical objectives Hélène Mainaud Durand.

G0 Detector Working Group Meeting
2018 Safety Group 1 – 5 Year Program Timeline Guide
2017 Safety Group 1 – 5 Year Program Timeline Guide
Notes on Lab 1 – Intro to the Mechatronics Lab

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

2019 Safety Group 1 – 5 Year Program Timeline Guide
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

2016 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group 1 – 5 Year Program Timeline Guide
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance starting 29 Nov Current Activities Relayout of AO optical bench for P1640 and SWIFT (Roberts, Burruss, Bui) –On schedule. Recommissioning with PHARO planned for April 9. High-order Wavefront Sensor design (Baranec) –Received CCD-50 camera. Will be setting up testbed in lab. Real-time wavefront reconstructor computer design (Truong, Guiwits) –Design completed, beginning hardware integration (two 10-PC clusters). Software architecture definition (Truong, Cromer, Angione) –In progress. Electronics rack design (Guiwits, Croner, Cromer) Schedule 3326 actuator Xinetics DM arrives Aug Still on track for upgrade to PALM-3000 in Dec April 2010.

PALM-3000 Interim (3/08-11/09) AO bench layout

PALM-3000 Real-time computer design HOWFS DM 3326 DM 349 LOWFS DM 3326 Driver DM 349 Driver Cass Cage Computer Room Data Room fiber