September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
Overview of ARIES Compact Stellarator Power Plant Study: Initial Results from ARIES-CS Farrokh Najmabadi and the ARIES Team UC San Diego Japan/US Workshop.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
March 16-17, 2000ARIES-AT Blanket Design and Power Conversion, US/Japan Workshop/ARR ARIES-AT Blanket Design and Power Conversion The ARIES Team Presented.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
The ARIES Compact Stellarator Study: Introduction & Overview Farrokh Najmabadi and the ARIES Team UC San Diego ARIES-CS Review Meeting October 5, 2006.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
June 16, 2004/ARR 1 Thermal-Hydraulic Study of ARIES-CS Ceramic Breeder Blanket Coupled with a Brayton Cycle Presented by A. R. Raffray With contributions.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Overview of ARIES Compact Stellarator Study Farrokh Najmabadi and the ARIES Team UC San Diego US/Japan Workshop on Power Plant Studies & Related Advanced.
December 3-4, 2003/ARR,1 1 ARIES-CS Engineering Approach Presented by A. R. Raffray University of California, San Diego L. El-Guebaly S. Malang D. K.
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
Ceramic Breeder Blanket Conceptual Design for ARIES-CS Contributors: S. Malang, A.R. Raffray, and L. El-Guebaly ARIES Meeting University of Wisconsin,
Exploration of Compact Stellarators as Power Plants: Initial Results from ARIES-CS Study Farrokh Najmabadi and the ARIES Team UC San Diego 16 th ANS Topical.
Overview of the ARIES-CS Compact Stellarator Power Plant Study Farrokh Najmabadi and the ARIES Team UC San Diego Japan-US Workshop on Fusion Power Plants.
March 8-9, 2004/ARR 1 Some of the Major Considerations in Designing a Ceramic Breeder Blanket for ARIES-CS Presented by A. R. Raffray With contribution.
Comparison of 2-FP and 3-FP CS Coil Geometry Configurations Contributors: T.K. Mau, Rene Raffray and The ARIES Team ARIES Meeting General Atomics, San.
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
May 6-7, 2003/ARR 1 ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach Presented by A. R. Raffray University of California, San Diego.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Minimum Radial Standoff: Problem definition and Needed Info L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison With Input from:
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
Magnet for ARIES-CS Magnet protection Cooling of magnet structure L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting UCSD January.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
March 3-4, 2005 HAPL meeting, NRL 1 Assessment of Blanket Options for Magnetic Diversion Concept A. René Raffray UCSD With contributions from M. Sawan.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
ARIES ACT1 Power Core Engineering M. S. Tillack, X. R. Wang, F. Najmabadi, S. Malang and the ARIES Team ANS 20 th Topical Meeting on the Technology of.
Updates of the ARIES-CS Power Core Configuration and Maintenance
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Can We achieve the TBR Needed in FNF?
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Trade-Off Studies and Engineering Input to System Code
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Presented by A. R. Raffray University of Wisconsin, Madison
Status of ARIES-CS Power Core Engineering
CERAMIC BREEDER BLANKET FOR ARIES-CS
ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach
ARIES-CS Power Core Engineering: Status and Next Steps
University of California, San Diego
Presentation transcript:

September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San Diego ARIES Meeting Georgia Institute of Technology, Atlanta, GA September 3-4, 2003

September 3-4, 2003/ARR 2 Outline Summarize engineering plan of action Modular maintenance approach with limited number of ports for 3-field period configuration Benefit of larger port sizes: maintenance scheme with ports between each pair of adjacent coils 2-field period configuration

September 3-4, 2003/ARR 3 Covered in S. Malang’s presentation at this meeting Initial assessment for 2-field period configuration Presented at ARIES project meeting in May 2003 Engineering Activities: Year 1 Perform Scoping Assessment of Different Maintenance Schemes and Design Configurations -Three Possible Maintenance Schemes: 1.Sector replacement including disassembly of modular coil system (e.g. SPPS, ASRA-6C) 2.Replacement of blanket modules through maintenance ports arranged between each pair of adjacent modular coils (e.g. HSR) 3.Replacement of blanket modules through small number of designated maintenance ports (using articulated boom) -Each maintenance scheme imposes specific requirements on machine and coil geometry

September 3-4, 2003/ARR 4 To be studied next Li or LiPb + He-cooled FW presented at this meeting (S. Malang’s presentation) Presented at May 2003 ARIES project meeting Presented at Jan. 03 ARIES project meeting Engineering Activities: Year 1 -Scoping analysis of possible blanket/shield/divertor configurations compatible with maintenance scheme and machine geometry, including the following three main classes: 1. Self-cooled liquid metal blanket(LiPb) (might need He-cooled divertor depending on heat flux) a) with SiC f /SiC b)with insulated ferritic steel and He-cooled structure 2.He-cooled liquid breeder blanket (or solid breeder) with ferritic steel and He-cooled divertor 3.Flibe-cooled ferritic steel blanket (might need He-cooled divertor depending on heat flux) -Evolve coil configuration(s) -Material and thicknesses -Radius of curvature, shape -Space and shielding requirements (PPPL, MIT)

September 3-4, 2003/ARR 5 Modular Design Approach Using Selected Ports and Articulated Boom Previously Discussed for 3-Field Period Configuration Minimum Port Sizes -1.6 m x 2.3 m and 1.2 m x 5.0 m -Quite limiting constraint on size of module -Desirable to accommodate ~2 m x 2 m x 0.25 m module -Better to consider maintenance based on limited number of ports Maintenance based on 3 ports (horizontal or vertical) seems possible -half field period length ~ 9 m -minor radius =1.85 m (local plasma height varies over about m) -Weight of empty module < 1 ton -These are comparable to EDITH- system boom* Space Available for Ports for NCSX-Based 3-Field Period Configuration (R=8.25 m) * Experimental -In-Torus Maintenance System for Fusion Reactors, FZKA-5830, Nov

September 3-4, 2003/ARR 6 Plasma Access for Articulated Boom Between Ports is a Concern for Modular Maintenance Approach With Limited Number of Ports Final number of ports, largest module size and degree of freedom of articulated boom (probably with at least 3-4 “elbows”) would depend on toroidal access through plasma space between port and furthest serviced region Configuration enabling use of additional ports for maintenance would be beneficial -Plasma access concern alleviated -Shorter reach would allow for larger boom capacity and larger modules -Parallel maintenance through ports could speed up process -Need greater space between coils (~2m x 3 m) -Larger reactor or 2-field configuration would help

September 3-4, 2003/ARR 7 Latest 2-Field Period Configuration from P. Garabedian Coil Filament Configuration R = 8 m = 2.3 m A = coils ( 8 per period ) Thickness = 57 cm. Aspect ratio = 2 Coil-plasma min. distance = 1.5 m Plasma Shape

September 3-4, 2003/ARR 8 2-Field Period Configuration Plasma Shape over Half Period Top View of Coil Configuration Side View of Coil Configuration

September 3-4, 2003/ARR 9 Comparison of Port Access Area Between Adjacent Coils for 3 Different Configurations Port Configuration Port #1Port #2Port #3Port #4Port #5Port #6Port #7Port #8 NCSX-like 3-field period R=8.25 m 2.6 x x x x x x 4.2 NCSX-like 3-field period R=9.68 m 3.1 x x x x x x field period R=8 m* 3.9 x x x x x x x x 10.9 Port toroidal dimension x poloidal dimension (m x m) * Assuming a coil cross-section of 0.57 m x 1.15 m

September 3-4, 2003/ARR 10 2-Field Configuration Provides Substantially More Space for Ports Between Each Pair of Adjacent Coils Need further study to confirm dimensions and configurationSystem study for physics and configuration parametersConfirmation of coil cross-sectionBenefit of larger blanket modules Details of maintenance schemeSolid view of plasma shape inside coils to check radial space available for blanket

September 3-4, 2003/ARR 11 1.How many protection barriers are required on a reasonable safety basis? 2.For a He-cooled ceramic breeder blanket with a He/steam heat exchanger (to drive a steam power cycle), a break in the steam generator pipe coupled with a break in the blanket coolant channel can lead to over-pressurization of the module and possible Be/steam reaction. Must the module be designed to take the steam pressure (with the penalty of thicker walls) or do the coolant channels in the blanket provide a sufficient barrier to take the pressure load? 3.Is it acceptable to have a water-cooled shield in combination with a LiPb blanket? 4.Safety issues associated with an external vacuum vessel and mitigating solutions: e.g., for a liquid metal blanket, a rupture would lead to a spill of hot liquid which when touching the coils could lead to over-pressurization as He gets vaporized. Also, Brad has mentioned a possible concern with arcing of the coil. 5. Latest updates on material interactions: -compatibility between structural materials and breeder/coolant limits the allowable operating temperature -coatings: differentiate between electrical insulation, thermal insulation and material compatibility functions. Safety/Engineering Discussion Session