Far Detector Data Quality Andy Blake Cambridge University.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Online Monitoring and plane checkout Online monitoring is used at the mine for: –sanity checks - “is everything working” –diagnostics - rates, hot/dead.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Data Quality Update. Andy Blake Cambridge University Friday February 23 rd 2007.
(I) MINOS Data Quality Software. Andy Blake Cambridge University Thursday December 7 th 2006.
Low Level Processing of MINOS Data. Andy Blake Cambridge University Friday March 31 st 2006.
SpillServer and FD neutrino events As part of my CC analysis studies, I have been attempting to isolate beam neutrino candidates in the FD using both scanning.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Atmospheric Neutrino Event Reconstruction Andy Blake Cambridge University June 2004.
Far Detector Fiducial Volume Studies Andy Blake Cambridge University Saturday February 24 th 2007.
Partially Contained Atmospheric Neutrino Analysis Andy Blake Cambridge University March 2004.
FD Timing Calibration Status Guardians of the FD timing calibration: –John Chapman, graduation in ~3-6 months. –Andy Blake, renewal of contract (or redundancy!)
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Far Detector Timing Calibration Andy Blake Cambridge University November 2004.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Partially Contained Atmospheric Neutrino Analysis Andy Blake + John Chapman Cambridge University January 2004.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Low Level Processing of MINOS Data. Andy Blake Cambridge University Tuesday June 6 th 2006.
Andy Blake Cambridge University Thursday April 12 th 2007 Towards a Combined Atmospheric Analysis.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
1 ND Online Monitoring Contents: –What is Online Monitoring? –How does it work? –What does it provide? –What are its limitations? –What is the status of.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Problems with Muon System N. Bondar O.Maev
Offline shifter training tutorial L. Betev February 19, 2009.
Examination of Corrupted Data in the Tile Calorimeter Stephanie Hamilton Michigan State University The ATLAS Experiment Supervisor: Irene Vichou (U of.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
N. Saoulidou, Fermilab1 Study of the QIE Response (Current Injection Mode) & development of diagnostic tools
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Валидация TRT DCS CONDITIONS SERVICE Евгений Солдатов, НИЯУ МИФИ “Physics&Computing in ATLAS” – 22/09/2010.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Rainer Stamen, Norman Gee
HCAL Database Goals for 2009
Level-1 Calo Monitoring
CMS Pixel Data Quality Monitoring
Presentation transcript:

Far Detector Data Quality Andy Blake Cambridge University

Far Detector Data Quality Andy Blake Cambridge University The atmospheric analysis group has studied the Far Detector data in great detail. - Large data set (August 2003 – February 2005). - Time spent at the Soudan mine! - Performed a complete physics analysis. Tools developed to examine data at many levels. - Raw data, cosmic muons etc… - Readout pathologies, hardware failures etc… - Cuts developed to select good and bad data. - But not in widespread use…! Next iteration of atmospheric analysis underway. - Need detailed data quality checks for this analysis. - Opportunity to develop tools for wider use…!

Far Detector Bad Channels DCS Systems Veto Shield Hot/Cold Busy Badly calibrated ? Problems that we don’t know about yet! Physics Data Coil On HV On No Holes! ? GLOBAL DATA QUALITY CHANNEL-BY-CHANNEL QUALITY Far Detector Data Quality Andy Blake Cambridge University Far Detector data quality issues roughly divide in two:

Data Quality Tools Far Detector Data Quality Andy Blake Cambridge University Shift Logbooks Online Monitoring Database DCS Info Raw Data Calibration Info Cosmic Muons Etc.

Far Detector Data Quality Andy Blake Cambridge University (1) Select good physics runs. → Determine which runs were intended as physics data. → Identify causes of bad data (e.g. LI leaks etc.) → Produce list of good physics runs. (2) Identify when detector was in a bad state. (e.g. HV trips, coil trips, veto shield holes etc.) → (DCS) database + tools to access it. Global Data Quality: (3) Compile record of bad detector components. (e.g. hot/cold/busy chips, bad readout, bad calibration etc.) → (HARDWARE) database + tools to access it. → Information from raw data – pass through offline framework. Channel-by-Channel Quality:

Far Detector Run Selection Andy Blake Cambridge University Soudan Database Cambridge Fermilab SELECTION Run Summary DBU DATA QUALITY CHECKS

Far Detector Run Selection Andy Blake Cambridge University Cambridge Entry in database. Run types 2, 769. ~5000 snarls. Fermilab Run types 2, 769, seconds. 1 snarl. Number of subruns during period August 1 st 2003 → July 31 st 2005 : Cambridge Only Overlap Fermilab Only This represents quite a large discrepancy! Far Detector run selection procedure :

Run Selection Issues Andy Blake Cambridge University (1) Modified Runs Approximately 1500 subruns have “modified” bit set. Corresponds to several weeks live time (The Far Detector DAQ is typically left with the “modified” flag set for long periods of time). Typical “modified” run comments*: – Testing the E4 trigger. – Removed Pulser Boxes from LI config. – Flashing LI at 500Hz. – Switched HV cards. – “Restarting DAQ after recovery”. – “Standard physics data”. These runs are generally okay for use in physics analyses – use other data quality cuts to reject any bad data. ( N.B: In contrast “test” runs typically correspond to changes in readout components – so it’s probably not wise to use these in physics analyses. )

Run Selection Issues Andy Blake Cambridge University (2) The Database (DBUSUBRUNSUMMARY Table) ~1200 runs have no entry at all in the database! – most are bad runs (e.g. the DAQ crashed before the run started) but a significant number do correspond to good physics data. – the gaps occur before 2005 so no beam data is affected. ~100 subruns can be recovered by searching for gaps. – Gap in middle of run: subrun GAP – Gap at end of run: subrun GAP ~300 subruns are on the Fermilab list but not in the database. ~20 subruns are under 10 seconds according to the database, but are actually several hours long!

Run Selection Issues Andy Blake Cambridge University (3) Short Runs Cambridge List has ~600 subruns with < 5 minutes data. (Mostly from March 2004 – dynode threshold scans + timing system tests, I think that we forgot to set a snarl threshold for this month!). Fermilab List has ~100 subruns with < 5 minutes data. Generally suspicious of short runs: – total number of snarls or timeframes is sometimes a “round” number. – some runs have unusually high or low snarl rates. – some runs have been used to test new software or components. – all test/modified data before May 2004 is just labelled as “normal data”. Run Selection Summary Most of the differences between the Cambridge and Fermilab run lists can easily be explained – but there are still some discrepancies.

New Data Selection Andy Blake Cambridge University Select runs using database: Run types 2, 769, 17153, >5 minutes data. Select “good” physics events. New Cambridge data selection: Select “clean” cosmic muons. Fill in gaps in the database! Physics Analysis. Timing Calibration. Good data!

Physics Data Andy Blake Cambridge University Select “Good” Physics Events: Data should contain events with: – correct trigger bit(s) set. – 10 < digits < – LI channels < 500 – dead chips < 20. – dead crates = 0 – event rate < 75 Hz Remove high voltage trips + data with incomplete ROP mask. Select physics events. These cuts have the following effects: – remove runs where HV is down or readout is incomplete. – remove “normal data” which isn’t actually physics data! – remove runs with anomalous events or rates. Remove anomalously high rates.

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 require less than 20 dead chips singles < 50 Hz

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 require all 32 half-crates to be working!

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 singles > 2500 Hz 300 Hz Light Injection! Is this bad?

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 Raw Snarls

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 Filtered Snarls

Physics Data Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 require event rate less than 75 Hz Filtered Snarls remove these runs!

Cosmic Muons Andy Blake Cambridge University Select “Clean” Cosmic Muons: Data should contain events with: – Hits in >10 planes. – Hits in >3 planes in each view. – Satisfies straight line fit (rms <1 cm). [ typically these events occur every ~3 seconds ]. – Cosmic muon rate < 1 Hz. These cuts have the following effects: – Select clean events for timing calibration. – Remove runs with anomalous events or rates. Remove anomalously high rates. Select cosmic muons.

Cosmic Muons Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005

Cosmic Muons Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 remove these runs! require muon rate less than 1 Hz

Feedback from Analysis Andy Blake Cambridge University Please tell me if you find any bad runs!

Aside: VARC Errors Andy Blake Cambridge University Far Detector readout errors recorded in “VarcErrorInTfBlocks” Two types of readout error are reported: – “ETC” errors (e.g. error in ETC readout, overflow of FIFO). – “Sparsifier” errors (e.g. corruption in FIFO, overflow of VME buffer). Data corruption or buffer overflows could corrupt or truncate physics events – need to be careful!

VARC Errors Andy Blake Cambridge University VME VMM ETC READOUT PROCESSOR Sparsifier VME Buffers signal control digital signal VA Readout Card data stored in FIFOs. data stored in VME buffers.

VARC Errors Andy Blake Cambridge University FIFOsBUFFER SPARSIFIER VME TRANSFER SPARSIFIER ~250 kHz (VA chips) Singles: ~15 kHz (detector) ~10 kHz (shield) Light Injection: ~30 x Rate ~10 kHz Total: ~35 kHz VME TRANSFER ~320 kHz (VA channels) Singles: ~15 kHz (detector) ~10 kHz (shield) Light Injection: ~300 x Rate ~100 kHz Total: ~125 kHz Far Detector data rates should be well within readout capabilities.

VARC Errors Andy Blake Cambridge University 100% DEAD TIME25% DEAD TIME August 1 st 2003 → April 30 th 2004

VARC Errors Andy Blake Cambridge University August 2003 BIT 0 – “ETC FIFO has overflowed”BIT 4 – “VME buffer has overflowed”

VARC Errors Andy Blake Cambridge University All 259 ETCs in detector! All 46 VARCs in detector! August 1 st 2003 → April 30 th 2004 Something went horribly wrong!

VARC Errors Andy Blake Cambridge University Error bit maps from a sample of data: The error bits look really crazy!

VARC Errors Andy Blake Cambridge University August 1 st 2003 → January 31 st 2005 Sep 26 th 2003 → Apr 1 st 2004

VARC Errors Andy Blake Cambridge University ? ? ?? ? ?

Summary Andy Blake Cambridge University Making progress towards a complete run selection. – Have analysed data from August 1 st 2003 → January 31 st Have uncovered some new issues. – The database has a large number of gaps. – The appearance and disappearance of VARC errors. Things that need doing. – HV/coil status database + access tools. – Hardware database + access tools.