All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.

Slides:



Advertisements
Similar presentations
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Advertisements

Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Dec 7, 1999D0 Dir Review Inst/Com DØ Silicon Hookup and Commissioning p Goals and timeline p Overview of Silicon Read out p “Stand alone” commissioning.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
June, 2000NIU Workshop Online DAQ System: From Detector to Tape T. Yasuda Fermilab.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
ADC Operations Shifts J. Yu Guido Negri, Alexey Sedov, Armen Vartapetian and Alden Stradling coordination, ADCoS coordination and DAST coordination.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CMS ROC Report Patricia McBride May 26, 2005.
CLAS12 Commissioning with Cosmincs
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
CMS Pixel Data Quality Monitoring
Presentation transcript:

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is the status? What are the goals for the next few weeks? The end game? Conclusions

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! What have we been doing?? We’ve been keeping up with our philosophy of “Commissioning components in their final Run II form!! ” Detector construction has been winding down Detector assembly and installation coming along nicely Physicist shifter contributions have been extremely valuable in making significant progress in establishing infrastructure – Completing SiDet 10% test HV and readout cabling & shifts – Completing fiber optic & laying Tracker readout cables – Completing Wave guide QC at Lab3 – Preparing cable bundles and labeling them – Replacing calorimeter BLS back-planes – Modifying Calorimeter BLS power supplies – Testing MCM modules – And much much more….

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Current Shift Schedule No X-Mas Shutdown this year!!!

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! However…. However…. Tracker Readout electronics and Trigger hardware bottle neck Installation and electronics schedule leaves practically no time to commission significant portion of the detector But nothing can ever stop us from starting cosmic ray commissioning We’ve had three workshops – July 14 and Sept. 1 for SiDet 10% test stand Establish SDAQ calibration Cosmic ray data taking with SMT-S & N Barrel + Disk Module – Nov. 16 for Integration workshop at DAB to prepare detector systems for Dec. cosmic ray run  This workshop was an EXTREMLY successful one A lot of people worked very hard and made significant progress Virtually all systems are participating in commissioning We must squeeze out as much as we can, before the roll in

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! A Cosmic-ray event at 10% test

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Nov. 16 Workshop Goals Primary goal: Prepare detector systems for cosmic ray run Run Calibration on (Data taking and COMICS downloading): Calorimeter in L3/DAQ ( Fill and turned on HV ) SMT on SDAQ Muon Readout in the same event, triggered by cosmic scintillation counter coincidence and/or L1  : 1 Cetral Muon Scintillation counter  crates 1 PDT Crate w/ 6 PDT 1 Forward Pixel Crate 1 MDT crate 1 Cal crates 3 SMT crates 1 CFT crate 1 TFW crate Total of 10 crates

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Run online Examines on Control room Linux machines: Calorimeter + Cal elec Central + Forward Muon SMT CFT Global Run online event display Muon – Calorimeter Integrate SR for multi-run per node functionality Ship data to SAM Run offline reconstruction at FCC – Need Run configuration information Need cable maps

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Event of the day LOOK!!!!!!! Aligned hits!!

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Plots of the day!! Calorimeter Peds HV OFF Calorimeter Peds HV ON

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Dec. 14:Start cosmic ray commissioning Readout Cosmic Ray hits from 2 Axial Layers of CFT super sector 2 + WAMUS + FAMUS Systems Readout Cosmic Hits in >1/2 CC and ICD (Cal Trigger) Complete integrating L3 Muon Filter and Streaming Readout Noise from partial SMT-S & perform coherent noise study, especially the effect to Calorimeters (Read out all 12 crates) Reconstruct Muon Tracks Test offline streaming and check functionality, eg Lum blocks Run offline reconstruction farm as data is shipped over, using proper calibration information Display events using FULL online event display

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! SSA2 +y

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Cosmic Ray Commissioning Run Duration: Dec. 14 – Roll in (26 days, assuming Jan 15 roll-in) Primary goals: – Check out the detector as one integrated unit every day – Subject as many parts of the detector as possible to long term stability tests Will have a workshop on Thursday, Dec. 14 to prepare: – Iron out all the remaining little bugs – Another integration of all available systems – Clear and comprehensive shifter instructions and tools for feed back – Daily task lists for evening and owl shifts Shifts cover: 6pm-2am and 2am-10am M-F, 24 hrs Sat. & Sun (Except for Dec. 23, 24, 25, 31, and Jan 1)  Need a total of 32 shifts/wk Detector installation, debugging, and commissioning continue during the day

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! End Game? Given the current schedule of electronics & Installation No chance to check out most the electronics outside the collision hall Prepare for worst case scenario – Detector rolled in w/ Partially cabled SMT-N and H-Disks Electronics checkout in progress w/ incremental installation Partial L1 trigger (Cal and muon?) No L2/L3 trigger hardware to handle rates Beam starts rotating in the Tevatron most of the day – Installing & Checkout of the electronics is a nightmare – Need to prepare for good tools for fast turn-around and feed back – Need to increase number of experts to cover three shifts – Shifters must help out debugging Will take much longer to bring up the detector

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Conclusions Significant progress has been made on all fronts A few dedicated people are working very hard Detector installation making good progress Electronics are serious concern  Worried that we might not have had a chance to look at some parts before roll-in Detector checkout need to keep up with installation and hook up Cosmic ray run must be carried out as long as we can – These 26 days are the only thing we’ve got before the roll in – This is the model for our collider run operation – Need to accumulate experiences w/ detector running

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! So let’s Roll up our Sleeves and Participate in getting the Experiment brought up!!!!

All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Who can help? Experts installing and commissioning sub-detector systems must continue their job, interacting with engineers & Techs. Given the current stability of the system, it is better if we can have a few dedicated people for this shifts  One can imagine these “Experts” be the run guiders at the beginning of the run This means – Anyone who does not need to interact with Engineers and Techs – Anyone who wants to learn detector systems in the field – Anyone who wants to get into the action  In other words, every single one of you can do this Send me by next Wednesday, Dec. 6, for shifts  Will prepare some tutorial