Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
An International Scoping Study of a Neutrino Factory & Super-beam Facility.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MUTAC04 Alain Blondel, 28/4/2004 Activities towards future accelerator-based neutrino facilities in Europe 1. little historical perspective 2. general.
Neutrino Factory R&D in Europe Rob Edgecock/RAL. Outline Introduction i.e. what has happened since last year European feasibility study Proton driver.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
 1 of 13 Stephen Brooks / RAL / March 2005 Muon Front Ends Providing High-Intensity, Low-Emittance Muon Beams for the Neutrino Factory and Muon Collider.
International cooling experiment 1 Towards an International Cooling Experiment Motivations: --Ionization cooling is an important ingredient in performance.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Muon Collaboration Meeting Steve Geer MUTAC Review, Jan, 2003 Muon Collaboration WELCOME.
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
Final CALICE OsC meeting: Status and summary of project
Accelerator R&D for Future Neutrino Projects
The Way Forward ISS to IDS
Outline: Why now ? What ? How ?
Report on EUCARD WP6: MICE Transnational Access (TA)
FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan
W. T. Weng Brookhaven National Laboratory
ECFA recommendations (September 2001:)
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Design Studies Rob Edgecock/RAL

Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

Introduction Last year: - time for a “3 rd ” Nufact design study - this time involving all 3 regions - World Design Study (WDS) Steering group created US:Steve Geer Bob Palmer Mike Zisman Japan:Yoshi Kuno Yoshi Mori Kenzo Nakamura Europe:Alain Blondel Rob Edgecock (chair) Helmut Haseroth Charged with: - define scope and charge - initiating NuFact’04 obvious target, but…….. …….one or two problems have delayed start Much done, but more work required Still plan to start soon Comments very welcome!

WDS Scope Much discussion about this (still)! Concluded WDS must acknowledge current status In particular, existing international “sub-collaborations” Cannot subsumed into WDS (by us) Identified six possible sub-collaborations Either formed, forming or (perhaps) should be formed

WDS Scope Sub-collaborationSummary of Task 1Proton DriverDefinition of critical parameters and R&D on components 2TargetryR&D on solid and liquid targets to prove viability; R&D on pion collection 3MICEDemonstration and study of ionisation cooling 4FFAGsStudy of FFAG acceleration, proof of principle and R&D on critical components 5Design and engineering studies Cost and performance optimised Neutrino Factory Design 6Physics and detectors Define parameters for accelerator & detector, inc. detector cost Mainly hardware R&DMainly simulations and theory

Scope Overall coordination of all sub-collaborations required in longer term Not by us – we are merely encouraging creation of some WDS: concentrate on simulations, theory, etc  cost optimised NF layout, inc. detectors Aims: - continue studies of alternative options for machine - integrate alternatives via end-to-end simulations - select “best” based on cost/performance optimisation - include detector(s) in cost optimisation Follows on directly from previous feasibility studies Will require close interaction with other sub-collaborations Possible duration: 4-5 years(?), hopefully starting soon Main deliverable: detailed design report

WDS Charge The feasibility of a Neutrino Factory has been demonstrated by a number of studies performed in the US, Japan and Europe. The cost, however, as determined by the second study in the US, was higher than is desirable and since it was published work has been on-going to find cheaper alternatives to the most expensive parts of the machine, while maintaining the performance. What is required now is a “third” feasibility study which brings these studies to a close, does end-to-end simulations of the machine and develops an overall cost optimisation of the machine plus detectors. For the “best” layout, more detailed engineering should be performed and a detailed design report produced. In detail, the charge is: 1) 1)continue simulation studies of different elements of the accelerator complex 2) 2)identify related R&D that needs to be done and initiate international collaborations to do it 3) 3)once the studies of the different options in 1 are complete, do end-to-end simulations to demonstrate feasibility of at least one layout and perform cost optimisations with far detectors 4) 4)if there is more one than layout, select the best based on cost and performance optimisations 5) 5)write preliminary design report for selected option 6) 6)perform detailed engineering studies of the selected option 7) 7)at the end of the study, write a detailed design report

Next Steps……. Get endorsement and comments from three regions Plans have been presented to: - EMCOG - MUTAC Will need to be presented in Japan Some action required When WDS is endorsed in all three regions: - identify likely contributors - develop detailed plans in collaboration - setup management structure, WP, etc - identify host laboratory - etc!

Design Study in Europe Funding difficulties in Europe Some improvement recently: - EC FP6 - UK - CERN management But mainly for R&D: - proton driver - target & TT2A - MICE - FFAGs Not part of current WDS Big hope: FP6 Design Study - up to 10MEUR - funds both simulation and R&D - 4 year duration

FP6 Design Study Three submission dates defined by EC: - March March March 2006 Created a steering committee Defined 8 WPs Website: Director:Ken Peach Coordinator:Rob Edgecock Japanese representative:Yoshi Mori US representative:Mike Zisman BENE representative:Vittorio Palladino Proton Driver:Roland Garoby Chris Prior Targetry:Roger Bennett Jean-Eric Campagne MICE:Alain Blondel John Cobb FFAGs:Francois Meot ? Accelerator FS:Helmut Haseroth Rob Edgecock Physics & Detectors:Mauro Mezzetto Pilar Hernandez Paolo Strolin WPTitleResponsibleSummary 1ManagementEdgecock Proton DriverGarobyInsufficient manpower 2TargetryBennettR&D on targets to prove viability; engineering of target station 3CollectionCampagneViability of horn 4MICEBlondelR&D on critical components 5FFAGsMeotR&D on SC dipoles 6MachineHaserothCost and performance optimised Neutrino Factory Design 7Physics and detectors Mezzetto Strolin Define parameters for accelerator & detector, inc. detector cost ??????????

Current Status Waiting for Round 2 decision – September In the mean time: – – Start anyway! – – Try and increase participation – – Focus on specific projects to attract new people – – Talking to CERN bosses for small resource increase – – Investigating alternative FP6 actions In addition, APS studies in US WDS not starting today!  WDS not starting today! Comments?