Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
ATLAS MDT Electronics Mezzanine PCB Radiation Hardness Assurance Eric Hazen – Boston University.
E. Hazen - LECC Amsterdam1 Production Testing of ATLAS MDT Front-End Electronics G. Brandenburg, J. Oliver, M. Nudell, Harvard University,
The Connector Board The best way to get in... or out!
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Sept 25, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
ATLAS MDT-ASD PRR – 30-August-2002George Brandenburg – Page 1 ATLAS MDT-ASD Operational Tests at Harvard George Brandenburg Michelle Dolinski Peter Hurst.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review.
US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 1 MDT Electronics.
R. Ball September 27 th  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Ethernet and Wifi Chapter 7 & 8. Send and Receive Data network adapter or network interface NIC card the most common wired Ethernet network interfaces.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
E. Hazen – FNAL – 5 Apr 2004 L1CTT DFEA Motherboard / Daughterboard Design, Cost, Schedule 4.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
BCID Reset T.Dai, H.Boterenbrood, E.Pasqualucci Mar. 26 th 2009 MDT JTAG and BCID/ECID Reset Meeting 1.History; 2.BCID of First Bunch.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
CCB to OH Interface M.Matveev Rice University November 12,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Single tube detection efficiency BIS-MDT GARFIELD Simulation GARFIELD Simulation Anode wire voltage as a function of the distance from the wire Electric.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
AHCAL LDA CALICE electronics and DAQ Meeting DESY Hamburg, Dec. 10, 2012 André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Novosibirsk, September, 2017
HCAL Data Concentrator Production Status
HB RM prototype component status
CMS EMU TRIGGER ELECTRONICS
FEE Electronics progress
UK CMS Oversight Committee Mtg
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
ASD-TDC joint test with MDT-CSM
Presentation transcript:

Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the final CSM –Allows chamber testing with production mezz cards and cabling –Automatic JTAG Daisy-chain to mezz cards –LVDS repeaters on TDC signals Status/Schedule –Can start design immediately –(Could be) Ready in time for spring test beam Spacer Frame CSM Motherboard RJ-45 Cables To CSM-0 New Adapter Mezzanine PCB Ribbon Cables To Mezz cards

Dec 11, 2001E. Hazen -- ATLAS Muon Electronics2 On-Chamber CSM Adapter Proposed Block Diagram

Dec 11, 2001E. Hazen -- ATLAS Muon Electronics3 On-Chamber CSM Adapter Mechanical Layout