Feedwater Heater Heat Transfer Richard Galati Brent Smith Justin Pierce
Overview Intermountain Power Plant Intermountain Power Plant – Provides power to Los Angeles – 2 Generator Units 950MW output each 1900MW Total Output – Proposed 3 rd unit will make it the 13 th largest generating station in the US
The Feedwater Heater
Overview Feedwater Heater Feedwater Heater – Condenses steam – Preheats water before entering boiler – Increases efficiency and total BTU output
Feedwater Heater
Heat Transfer Finding Heat Transfer Finding Heat Transfer – Variables Provided by Manufacturer U n - Stage Thermal Resistance A n - Stage Area Log Mean Temperature Difference Log Mean Temperature Difference All temperature values provided from instrumentation on feedwater heater All temperature values provided from instrumentation on feedwater heater
Q for each stage is calculated Q for each stage is calculated – De-Superheating – Condensing – Drain Cooling Q tot = Q ds + Q c + Q dc Q tot = Q ds + Q c + Q dc Results compared with projected data from manufacturer Results compared with projected data from manufacturer Heat Transfer
Conclusions Q tot, predicted = x10 6 BTU/hr Q tot, predicted = x10 6 BTU/hr Q tot, actual = 144.5x10 6 BTU/hr Q tot, actual = 144.5x10 6 BTU/hr Difference = 17.41x10 6 BTU/hr Difference = 17.41x10 6 BTU/hr Why: Why: – 20 years of use – Increase of Flow Rate – Other…