April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
AMANDA Lessons Antarctic Muon And Neutrino Detector Array.
GoldenDOMs Status and analysis plan Shigeru Yoshida (for Hiroko M) Dept. of Physics, Chiba University.
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
April 4, 2007 Rolf Nahnhauer1 DESY-PROJECT IceCube Digital Optical Module Production.
IceCube 1400 m 2400 m AMANDA South Pole IceTop Skiway 80 Strings 4800 PMT Instrumented volume: 1 km3 (1 Gt) IceCube is designed to detect neutrinos of.
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
The IceCube High Energy Telesope The detector elements Expected Sensitivity Project Status Shigeru Yoshida Dept. of Physics CHIBA Univ. ICRC 2003.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Dynamic Traffic Light Timing Tony Faillaci John Gilroy Ben Hughes Justin Porter Zach Zientek.
PD Kobe Univ. 06/29/2007 General performance of the IceCube detector and the calibration results I am Mina Inaba from Chiba university. I will.
IceCube System Testing
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
Summary of the Acoustic R&D Parallel Session R. Nahnhauer DESY September 23rd, 2011 IceCube Meeting Uppsala1 x AAL Quo vadis?
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
Progress in Chamber Simulation Experiments At UCSD Laser Facility Farrokh Najmabadi Kevin Sequoia, Sophia Chen HAPL Meeting September 24-25, 2003 University.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
High Energy - Engineering Working Group IceCube PY8 Spring Collaboration Meeting Apr 29, 2009 Jim Baccus.
Astronomy & Astrophysics Advisory Committee (AAAC) May 11, 2006 Vladimir Papitashvili Antarctic Sciences Section Office of Polar Programs National Science.
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN.
AMANDA and IceCube neutrino telescopes at the South Pole Per Olof Hulth Stockholm University.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Progress in Chamber Simulation Experiments At UCSD Laser Facility Farrokh Najmabadi and Kevin Sequoia HAPL Meeting February 5-6, 2004 Georgia Institute.
Why Neutrino ? High energy photons are absorbed beyond ~ 150Mpc   HE  LE  e - e + HE s are unique to probe HE processes in the vicinity of cosmic.
Studies on PINGU’s Sensitivity to the Neutrino mass Hierarchy P. Berghaus, H.P. Bretz, A. Groß, A. Kappes, J. Leute, S. Odrowski, E. Resconi, R. Shanidze.
October 20, 2008 Rolf Nahnhauer DESY-PROJECT IceCube Digital Optical Module Production.
March 02, Shahid Hussain for the ICECUBE collaboration University of Delaware, USA.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Science Advisory Committee March 30, 2006 Jim Yeck IceCube Project Director IceCube Construction Progress.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
April 26, 2007Rolf Nahnhauer IceCube Spring Meeting1 IceCube Future Directions - Acoustic Rolf Nahnhauer DESY.
Optical Receivers Theory and Operation
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
5 June 2002DAQ System Engineering Requirements 1 DAQ System Requirements DOM Main Board Engineering Requirements Review David Nygren.
Feasibility of acoustic neutrino detection in ice: First results from the South Pole Acoustic Test Setup (SPATS) Justin Vandenbroucke (UC Berkeley) for.
US TileCal Meeting at UTA Possible Electronics Evolution J. Pilcher University of Chicago.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Organizing future KM3NeT production 06-July-2010.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
DOM acceptance and calibration
NUV-SiPM short technology description
IceCube System Testing
Phototube response for a multi-element Optical Module
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Time calibration Dmitry Chirkin, LBNL UC Berkeley, November 2004.
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 2

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 3 DOM PRODUCTION Production of up to 5500 Optical Modules until end 2008 : Gel mixing, filling and potting PMTs Collar mounting and assembly of electronics Sealing of DOMs at low pressure DOM testing in DFL Harness DOM with suspension Finally pack DOMs and ship them to the pole

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 4 PRODUCTION SCHEDULE Numbers from February 2004 slightly changing with time Baseline change: 80 strings  70 strings + 10 strings from contingency xxx

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 5 Great job…all sites

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 6 Should be no problem to do

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 7 A plug for John Joseph and LBL, good job here DOM Main Board Production

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 8 PYYearDOMs ready at PSL DOMs ready in Sweden DOMs ready at DESY 034/04-3/ /05-3/ /06-3/ /07-3/ /08-3/09~200~185~200 DOM integration will finish 7/08 to 11/08 decision how many DOMs for how many strings have to be produced, will come in May 2007 DOM Production in Total

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 9 Components for Final Production

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 10 DOM TESTING 3 MDFL at PSL 1 DFL at DESY 1 DFL in Uppsala

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 11 DOM Testing Requirements Electronic and optical requirements Reboot- and communication over a wide temperature range from +20°C to -45°C (or -55°C for ice-top DOMs) Single photo electron detection Wide dynamic signal range – capable to handle large light pulses with up to several 1000 photo electrons per microsecond ime resolution better than 5ns for single photo electron pulses High voltage calibration of the PMT better than 5% Optical sensitivity within low variations for different DOMs Dark noise rates less than 1kHz in ice Mechanical requirements Vibration and pressure fluctuation during transport Rapid temperature variations from +20°C to -45°C Very high environment pressure up to 650 bar

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 12 DOM PASSPORT Main Page

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 13 DOM Passport - Example Pages Dark Noise Optical Sensitivity Time Resolution

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting is also starting out good FAT Status Snapshot in 2006

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting DOM Testing example (DESY) timeloadgoodbad  FAT FAT FAT FAT FAT16FAT17 No dominant error source could be identified in FATs Different small problems appeared for all FATs at all sites Only ~1% of DOMs are cannibalized – goal was 5% or better Good components are used in next years production

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 16 DOM SHIPPING

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 17 Awesome! After 06/07 season: 200 DOMs at Pole 256 DOMs at McM 957 vs plan of 900 DOM Shipping 2006

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 18 DOM Shipping 2007

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 19 DOM Quality in the Ice DOMs from all production sites show same behaviour in the ice ☺

April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 20 Summary DOM mass production is running without problems Production teams well trained Delivery of components mostly smooth Many small problems contribute to test failure rate Total failure rate after rework sufficiently small (better than expected) All sites well prepared for continuous mass production until autumn 2008