Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, 2005 11:00 am Presented.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

1 Case Study Case Study Watkins Creek Franklin, TN.
BAT Work Group. BAT Work Group Goals Develop a procedure for identifying technologies eligible for funding Propose policies and regulation necessary to.
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Fayette County Wastewater Management Plan October 6, 2005.
IPN-ISRAEL WATER WEEK (I2W2)
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
A SCHEME FOR MUNICIPAL WASTEWATER TREATMENT IN INDIA By PROF SOLI J ARCEIVALA Formerly, Chief, Environmental Health, UN / WHO SE Asia Region and Director,
Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Part III Solid Waste Engineering
Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009.
Case Study Case Study The Waters Montgomery, AL. Project Summary Location – Montgomery, AL Acreage – 1,250 acres Units – 2,500 residential units Product.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
1 Case Study Case Study Serenbe Palmetto, GA. 2 Project Summary Location:Palmetto, Georgia Acreage:900 Units:Approx. 165 residential units, 115 Live/work.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Lake Auburn, Maine New residential development ordinances (From the City of Auburn Comprehensive Plan) Lake Auburn Watershed Neighborhood Association
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Connecticut Department of Energy and Environmental Protection.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
AN ADVANCED URBAN WATER MANAGEMENT CONCEPT: GRAYWATER SEPARATION Sybil Sharvelle September 11, 2008.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Open Space Residential Development Bylaw Town of Rehoboth.
Senior Citizen Living 1766 N Atherton St State College, PA EDSGN 100 Section 06 Erika Arrojado Cody Shustack Matthew Malencia Andrew Zaunegger.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Assessment of on-site sewage disposal systems after severe flooding Steven R. Tidwell, E.I. U.S. Public Health Service APHT3 – Disaster Engineer Presentation.
Asset Management in Action: Use of a Triple Bottom Line Approach to Prioritize Capital Improvement Needs Richard Cuthbert R. W. Beck, Inc.
La. Food Processors Conference Facility Upgrade and Expansion Considerations for Treatment of Process Waste Todd Farrar, P.E.M. General Engineering & Environmental.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Fayette County Wastewater Management Plan February 14, 2006.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Update on the resolution related to a rule to be proposed to the Texas Commission on Environmental Quality related to the beneficial reuse of wastewater.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Kennett Township land Stewardship Initiative
Delivering Water Reuse Solutions
Water Reuse in Agriculture
Homeowner Responsibility
Water Reclamation Plant Feasibility Study Update May 28, 2014
South Carolina Town of Kiawah Island June 7, 2016.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Florida and Reclaimed Water
Anne Arundel County Maryland
Sludge Removal Requirements
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Homeowner Responsibility
BAT Work Group.
California Water Boards PFAS Efforts
Presentation transcript:

Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented by: Luna County Planning Department and Zia Engineering & Environmental Consultants, LLC

Background Luna County Comprehensive Plan indicates that County is on the verge of an “environmental catastrophe” County residents outside of Deming and Columbus rely on septic tanks and domestic wells New NMED regulations came into effect September 1, 2005 Border 2012 grant to explore treatment options to address these concerns

Project Scope Research existing information and choose a study area Identify alternative treatment methods Assess alternatives to determine feasibility –Ability to meet regulations, previous experiences, demands on community, technical considerations, flexibility, cost –County’s stated goals: provide an alternative to septic systems; water reclamation and reuse; create outdoor recreational opportunities; aesthetic improvements; provide educational opportunities Prepare of a schematic system design

Interstate 10 Deming City Limits County ETZ Zone

Study Location T24S R9W Section 24 SW quarter (La Hacienda Estates) –94 septic systems –74 domestic wells –Growing area of subdivisions –Property nearby that could serve as treatment site (state land and gravel pits)

Alternative Treatment Methods Lagoon Earthen reservoirs with an impervious liner that can be used alone or in combination with other processes to provide complete wastewater treatment

Alternatives (continued) Small Treatment Plant Smaller version of the typical wastewater treatment plants that most large communities use for the treatment of their wastewater (two options: custom design or pre-packaged)

Alternatives (continued) De-centralized Treatment Systems An alternative that utilizes more than one location throughout the study site to implement treatment (two options: on-lot or cluster)

Alternatives (continued) Treatment Wetland Attempt to mimic natural wetland processes to treat wastewater

Advantages and Disadvantages Treatment Lagoon AdvantagesDisadvantages  Minimum operation and maintenance  Low technological demands  Can design to store sludge  Land use intensive  Not flexible  Difficult to upgrade  Difficulty in consistently reducing nitrogen levels  Algal growth can be extensive  Odor production may be a problem at headworks  Eventual sludge removal may be difficult  Requires a NMED groundwater discharge permit  Requires a collection system  Requires groundwater monitoring  Requires a certified operator

Advantages and Disadvantages Small Treatment Plant AdvantagesDisadvantages Flexible Able to meet all regulated effluent levels Proven effective in the region Easy to upgrade Cost Frequent sludge disposal required Requires a NMED groundwater discharge permit Requires a collection system Requires an Advanced Licensed Wastewater Operator

Advantages and Disadvantages De-centralized Treatment Systems AdvantagesDisadvantages No or minimal collection system required Low maintenance requirements Proven effective in the region Contract out O&M services No NMED groundwater discharge permit required Easy to upgrade Numerous maintenance locations Difficult to ensure current maintenance is done Maintenance of septic systems may be necessary Use of individual homeowners’ property

Advantages and Disadvantages Treatment Wetland AdvantagesDisadvantages Aesthetically pleasing Habitat creation Land use intensive Extensive pre-treatment required Regional systems have not been effective Not flexible Requires a NMED groundwater discharge permit Requires a collection system

Summary Matrix of Treatment Alternatives (1 = Low Desirability; 3 = High Desirability) Treatment Lagoon Small Plant Pre- Packaged Plant On-lot Treatment Cluster Systems Meets County’s Goals Complexity Flexibility Reliability O&M Requirements Cost Ability to be Upgraded Total

Effluent Alternatives Constructed Wetlands can be successfully used as a final polishing and effluent disposal step Agricultural use treated wastewater to irrigate an existing agriculture operation or to develop a new one Residential treated wastewater may be used to irrigate residential landscaping Discharge release the water into a leach field and discharge to the groundwater table

WetlandAgricultureResidentialDischarge Meets County’s Goals 3231 Additional Treatment 3321 Quantitative Cost 1322 Total7874 Summary Matrix of Effluent Alternatives (1 = Low Desirability; 3 = High Desirability)

Recommendation Meets all the criteria and goals Lowest cost option * – no collection system required Puts the responsibility in the hands of the homeowner * Costs calculated without grants or other funding considered De-centralized cluster treatment with residential sub-surface irrigation

Estimated Costs for Recommendation Capital CostAnnual O&M 4-Home Cluster System $24,100$1,650 Irrigation System (4 homes) $8, Total $32,100$1,650 Capital CostAnnual O&M Cluster Systems for La Hacienda Estates $872,600$59,000 Irrigation System for La Hacienda Estates $200, Total $1,072,000$59,000

Questions?