EPFL, 14.10.05 Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch.

Slides:



Advertisements
Similar presentations
Electricity Investigation 2 Review.
Advertisements

Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Installation of the new end mirror 1Frans Mul - July 2008.
Principles of Manufacturing Safety First! Part II
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
ME: 121 Engineering Practices
1 INTRUSION ALARM TECHNOLOGY DETECTION DEVICES. 2 INTRUSION ALARM TECHNOLOGY Detection devices can be either passive or active. Passive devices typically.
By Ian Agopsowicz.  Get 20 inches of copper wire (1.0 mm thick)  Get one AA battery  Get 6 small magnets.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
How Does Electricity Flow? Electricity & Magnetism Science Instructor: Miss Aartman.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
Sumo Robot. Materials Part NameQty 3-9 volt Motor2 Gear sets2 Wheels4 Axles 4 Base1 Straws2 Switches2 Bolts & Nuts4 Hook up wire15'
Principles of Manufacturing Safety First! Part II Safety Materials for Scroll Saw and Band Saw Copyright © Texas Education Agency, All rights reserved.
How to get a chassis off your monitor without giving yourself a nasty boot! A very simple guide to discharge the monitor and remove the chassis so that.
EDR - Mech. 2; December 16/17, 2002 Hans de Vries - 1 Status of Vertex at NIKHEF VELO Mechanics  RF/vacuum foil  Rectangular bellow  RF measurements.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
First, let’s review the structure and use of a breadboard.
Wall survey: With and without TT7. The wall targets are hybrid targets made of precise uncoded targets (the pin targets) which enter in the hole of the.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
TEMPLE CHANDELIER HOIST SUPPORT SYSTEM BYU Capstone Nick Barnwell, Andrew Marshall, Matt Steward April 15, 2014.
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Package Substrate Jan Business Confidential Top Metallization mm mm Bottom Metallization Beryllium Oxide OR Alumina We should see.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Name ______ 6 __ Jan. __ Lesson 4B – How Batteries Work.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
TCT measurements with irradiated strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
LED Flashlight.
GENIX 1/2.
Start on the corner of your picture *(Not the corner of the paper)
Sensors May 25, 2013.
Development and characterization of the Detectorized Phantom for research in the field of spatial fractionated radiation therapy. D. Ramazanov, V. Pugatch,
Company’s name : TeCH Enterprise E.
The 11T cryo-assembly: summary of design and integration aspects
Study of Chinese oil-less chamber
LCLS-II SPQA Magnet Leads Soldering
ADAGIO.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Hydraulics Gap Control
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Technic Conductivity Test Apparatus
LHCb VErtex LOcator ENGINEERING DEPARTMENT
OT Survey & Adjustment Outline: Survey technique at present
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Single Detector Design
Rack Placement Chopper Workshop
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Liceo Scientifico “A. Volta”
Presentation transcript:

EPFL, Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch

EPFL, Requirements : Reliability of the system  „Fail-safe“ system  Simple principle of operation As little as possible additional material As a careful touching of the beam pipe is permitted....

EPFL, Beam Pipe Distance Monitoring both during installation and data taking Top- and Bottom Boxes Side Boxes Minimum distance : 7 mm !!

EPFL, First switch activated at 7 mm distance from the beam pipe  signal Second switch activated at 6.5 mm distance from the beam pipe  alarm Three switches under & at the front of the detector box Three switches on top & at the front of the detector box One switch at the side of the detector box Each switch consists Of two mettalic blades, Allowing a distance- Dependent signal

EPFL, Metall blade („finger strip“) : Thickness 500 microns Beryllium Copper Switching precision < mm Foil around the beam pipe : Thickness 100 microns Copper

EPFL, Safety Switch for side boxes Metallic foil Stesalite piece & non magnetic blade [Design model]

EPFL, Safety switch for top (and bottom) boxes Metallic foil Stesalite piece & non magnetic blade [Design model]

EPFL, Next steps...  Furhter tests with different finger strips  Detailed studies on electrical connection possibilities  Studies on optimal fixation points (on the detector boxes)