Prospect Eleven Fixin’ One Line of Code UNLV October 30, 2005.

Slides:



Advertisements
Similar presentations
BY: CY HOWARD.  Play dig it is helping me with getting more in tuned with blogs n other information websites.
Advertisements

Things you should never say to your professor…. Sorry I missed class. Did we do anything important?
Princeton University Prospect Eleven Dec 08, 2005 Prospect Eleven: The Making, Testing and Running of Princeton’s Entry in the 2005 DARPA Grand Challenge.
Scary s. Before We Get Started Please turn your cell phones to stun. Restrooms are down the hall and on the right We’ll take a 5 minute break around.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Rerun of Beer Bottle Pass November 1, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Over the UP Mainline 8:27 / 9.1 miles 2005 Grand Challenge Course 8:27.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 The Finish 19:36 / 132 miles 2005 Grand Challenge Course 19:36.
DAPRPA Grand Challenge, Unfinished Business, November 2, :50 11:08 10:50 / 43 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Prospect Eleven As Rescue Vehicle, 11:56 / 48.6 miles 2005 Grand Challenge Course 11:56 11:33.
DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18:44 / 143 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Back by Primm 8:18 PST 2005 Grand Challenge Course 8:18.
DAPRPA Grand Challenge, Unfinished Business, November 2, :19 / 63 miles 2004 Grand Challenge Course 12:19.
National Qualifying Event (NQE) California Speedway, Fontana, CA September 27 – Oct 5, 2005.
Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, :53 / 11.8 miles 2005 Grand Challenge Course 8:53.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Autonomously, 10:31 /36 miles 2005 Grand Challenge Course.
DAPRPA Grand Challenge Event, October 08, 2005 The Launch of Prospect Eleven 2005 Grand Challenge Event Launch Movie.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Beginning the Assent: 16:57 Rerun to Beer Bottle Pass.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Again Lake Bed 8:05 PST 2005 Grand Challenge Course 8:05.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Approaching Beer Bottle Pass 19:02 / miles 2005 Grand Challenge Course 19:02.
DAPRPA Grand Challenge Event, October 07, 2005 The Day Before; “E-119” Garage 2005 Grand Challenge Event.
DAPRPA Grand Challenge, Unfinished Business, November 2, :22 / 77.2 miles 2004 Grand Challenge Course.
Prospect Eleven Testing in Princeton Prior to NQE August, 2005.
DAPRPA Grand Challenge, Unfinished Business, November 2, :08 / Start 2004 Grand Challenge Course 7:08.
DAPRPA Grand Challenge, Unfinished Business 2004 Grand Challenge Course 143 miles The ’04GC Team 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, November 2, : Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Lake Bed 8:13 PST 2005 Grand Challenge Course 8:13.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Another Narrow Gate, 11:12 / 46 miles 2005 Grand Challenge Course 11:12.
This is the picture you sent to the printer on October 21, 2010 at 2:00 PM What would you like to do with it? PRINT Remove from Printer.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Back & Forth Return to Beer Bottle Pass Route to/from Beer Bottle Pass from Start of 2005.
DAPRPA Grand Challenge, October 8, 2005 Grand Challenge Event Autonomous Run, 9.4 miles Finish, 9.4 miles Start PassBy.
Present Perfect Tense & Past Perfect Tense By Melanie Daigneault.
Earl Haig Public School PROGRAM AREA REVIEW TEAM Community Meeting Tuesday, January 27, 2009 Earl Haig P.S.
Son, what is your main wish for today?... I answered…
Effective communication through Mary Coker MD Expo Oct 2010.
By Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Chair, PAVE (Princeton Autonomous.
Review Etiquette Use District Check daily Respond promptly Address lines Subject line Salutation = “To” line.
Princeton University Prospect Eleven Nov. 17, 2005 System Architecture Event-Based –Modules “subscribe” to the information they need and receive it as.
Professional Etiquette. Why Learn Etiquette? From: Sent: Wednesday, December 11, :29 AM To: Subject: _______________________________________________________________.
Princeton University Prospect Eleven Nov. 17, 2005 Prospect Eleven: Princeton University's Entry in the 2005 DARPA Grand Challenge Thursday, November 17,
Administrative Policy Writing Spring Administrative Policy Writing Spring 2012 The final project for this class is a revision project. You will.
Passport to Meden You must pass each challenge and have your passport stamped in order to claim your certificate to say you have mastered the basics.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2004 Course November 2, 2005.
Attendance. School starts each day at 7:30. We do lots of work each day and missing just a day can make it harder to keep up! Breakfast. Breakfast is from.
Smart Driving Cars: Looking Back to Princeton’s participation in the DARPA Challenges Alain L. Kornhauser, Ph.D. Professor, Operations Research & Financial.
Autonomous Vehicle Initiatives at Princeton University Alain L. Kornhauser Professor, Operations Research & Financial Engineering Director, Transportation.
VOLUNTEER CONFERENCE REGIONAL NEWSLETTERS Lesley Lenssen and Andrew Kozman 4 th September 2015.
AHJS Drama Club Someone Save My Baby Ruth.
BMTS 365 Biomed Mechanical Instruments 2 BMTS /11/2013.
Objectives.  is short for electronic mail.  It allows you to quickly send a message to anyone else in the world as long as they have their.
University and Colleges Admission Service 2017 entry.
Unit-2 Objects and Classes
Girls Honor October 2017 Meeting
Professional Etiquette
Professional Etiquette
What I am Thankful For Mr. How November 2010 Period 1.
Tips Need to Consider When Organizing a College Event
PAVE & the DARPA Challenges
NHS Meeting October 30, :30-4:00PM.
זכויות סוציאליות.
ماجستير إدارة المعارض من بريطانيا
CHEM 1411 CRN: Tu: Lab 223 (7-10 pm) Th: Lecture 313 (7-10 pm)
Lesson 1: Components of Patient Lists
Attendance. School starts each day at 7:30
Enhancing Mathematical Learning through Talk
Administrator Roundtable Classes & Events October 24, 2008
Warmup (p. 10) – Take notes PASSED/PAST – Passed is the past tense of the verb “to pass”. Past is used for every other part of speech. PRECEDE/PROCEED.
August 31-September 3.
Home work 2 Jie.
Presentation transcript:

Prospect Eleven Fixin’ One Line of Code UNLV October 30, 2005

DAPRPA Grand Challenge, Unfinished Business, October 30, 2005 Fixin’ “one line of code” at UNLV 6: Grand Challenge Course

DAPRPA Grand Challenge, Unfinished Business, October 30, 2005 Fixin’ code in the shade at UNLV 2005 Grand Challenge Course

DAPRPA Grand Challenge, Unfinished Business, October 30, 2005 Fixin’ code in the shade at UNLV 2005 Grand Challenge Course L2R: Anand Atreya’07, Andrew Saxe’08, Prof. Alain Kornhauser*71 P03 Play Movie

DAPRPA Grand Challenge, Unfinished Business, October 30, 2005 Fixing “one line of code” From Anand Atreya Sent Wednesday, November 9, :44 pm To Alain Kornhauser Cc Bcc Subject RE: please send me the code change Everywhere I saw something like: currentObstacles.RemoveAt(i); I preceded it with: State.RelativeFrameUpdated -= currentObstacles[i].relativeFrameEventHandler; The problem was that each time we removed an obstacle from the list of current obstacles, we were not unhooking it from the RelativeFrameUpdated event. Thus, the garbage collector never determined that the old obstacle was no longer needed, and as a result it was never cleared. -- Anand

DAPRPA Grand Challenge, Unfinished Business, October 30, 2005 Ready to Attach the ‘05 and ‘04 DARPA GC Courses After Fixin’ “one line of code” at UNLV 16:14