GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

Job Loss Analysis Overview
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
Oct Safety Meeting G. Haller 1 Oct Safety Meeting REG & GLAST LAT DAQ & Electronics Gunther Haller (650)
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Gulf of Mexico Simultaneous Operations Safe Work Practice
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Continuity of Operations Planning COOP Overview for Leadership (Date)
LCLS NEH Operational and User Safety Programs
A Review of Board of Health Liability James A. LeNoury LeNoury Law Counsel to alPHa February 5th, 2015.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
GLAST Large Area Telescope:
New Employee Orientation Job Hazard Analysis (JHA)
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Best Practices: Job Briefings. Practice Statement Provides a uniform methodology and outlines key components of job briefings.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
SWMS SWMS made for construction firms Existing laws concerning safety and health require enterprises to present.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Pipeline Safety Management Systems
LCLS-II ES&H Requirements: Subcontractors
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Who is Responsible for Overhead Crane and Hoist Operations
THEMIS Mission Assurance
Mechanical Integration
GLAST Large Area Telescope:
Cranes, Hoists and Lifting Devices Identification
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Management of Change Report Errors to Management.
GLAST Large Area Telescope:
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Safety is part of our culture at Halliburton
Control of Knife and Hand Cutting Tools
GLAST Large Area Telescope:
A Review of Board of Health Liability
Workshop commissioning Installation Coordination at ESS
Ian Evans SSRL Safety Office
Introduction and Overview
PSS verification and validation
GLAST Large Area Telescope:
Safety Program for LCLS Experiments
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview Ken Fouts Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 2 Safety Comes First Safety Safety of test personnel, the LAT system and its test articles is the primary concern in all I&T test activities. Safety awareness is built into all phases of I&T testing. It will be an agenda item at the LAT Daily I&T Test Plan meetings. I&T test methods and procedures shall be developed and executed to ensure that the LAT and its test articles are in no danger due to improper handling, erroneous wiring, electrostatic discharge, contamination, power or operational problems. From LAT-MD-01376… LAT I&T received positive feedback from external audits done during our Safety Stand-down. I&T hoisting and lifting equipment is “pre-engineered” for specific lifts and analyzed to East/West Range (EWR) Safety requirements. Detailed lifting procedures for the LAT instrument and components are reviewed and released prior to use. All MGSE lifting or hoisting equipment is proof tested and tagged prior to being delivered to I&T.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 3 Safety Comes First During the Stand-down we: –Reviewed our internal safety documentation. –Updated safety training plans. –Completed two training classes for Electrical Safety. –Updated Area Hazard Analysis (AHA) for B33, and office areas in B34 and B84. –All employees completed a routine Job Hazard Analysis & Mitigation (JHAM) for there daily work. –Signed a “Personal Commitment to Safety at SLAC” at the completion of training. New guidelines for hoisting and rigging have been defined. –All lifting operations require written procedures. LAT I&T was already in compliance. –All Procedures will be reviewed by the Hoisting and Rigging Board prior to approval to lift.