1 UW Forest Engineering Schiess & Jaross Long-Span VS. Conventional Skyline Yarding: Road Densities, Economics and Silvicultural Options Peter Schiess.

Slides:



Advertisements
Similar presentations
Topics in Forest Transportation Network Design Professor Frank Greulich College of Forest Resources University of Washington Seattle, Washington Nihon.
Advertisements

Rien Visser, Virginia Tech
1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.
St. Croix River Crossing Project Public Information Meeting
Rigging and Rigging Practices Section G of the Logging Code.
Timber Management Elements of Forestry Kenneth Williams
TWO VIEWS ON CANADA’S FORESTRY INDUSTRY
Timber Harvest Planning Course Learning Objective: Be able to describe the harvest planning process including different levels (or types) of harvest plans,
David O. Wallin Department of Environmental Sciences Huxley College of the Environment Western Washington University Bellingham, WA
Virginia Department of Forestry 2014 SWCD Annual Meeting.
0 1 5/9/2015 Creating and Maintaining Multi-Strata Stands Is FVS wrong? GMUG 11/15/2013 Weikko Jaross DRAFT subject to change1.
Ground-Based Primary Transport TOPICS: Conventional ground skidding equipment Mechanical felling, tree processing & forwarding equipment & systems Management.
SCHEDULE. ROAD-SIDE DITCH REVISITED Revisiting the road-side ditch problem: By how much is the contributing area of each stream cell increased in shifting.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
RAILROAD OPERATIONS UPDATE ‘The Monster Arrives” 15 AUG 1969.
Cumulative Impact Estimation For Landscape Scale Forest Planning Finn Krogstad & Peter Schiess Forest Engineering, U. Washington.
FE Watershed Analysis Lecture 1a - Overview Finn Krogstad UW Forest Engineering
Forest Products – Log Uses Log Use Data largely from the Washington Mill Survey 2012 (published February 2014) Key Categories of Log Consumption –Lumber.
Forest Resources Wednesday, April 5. Characteristics of a Forest Resource Renewable Renewable Slow growth Slow growth Replant Replant Self-regenerate.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
National Forest Certification October 7, Why Consider NFS Certification? Force for change – To-date certification has had positive impacts on state,
TOPIC 9 –HISTORY OF FOREST MANAGEMENT  19 th CENTURY TO PRESENT  PARADIGM SHIFTS  SUSTAINABLE FOREST MANAGEMENT  CANADIAN MODEL FOREST NETWORK.
Current Integrated Use of Biomass from Forest Treatment Plummer Forest Products.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Caitlin Michele Ambesi & Matthew Otto Burchhardt.
The Impact of Changing Economic Conditions Since 2005 on the Forest Sector Richard W. Guldin and W. Brad Smith U.S. Forest Service Research & Development.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
The Potential of the Alder Resource: Challenges and Opportunities David Hibbs and Andrew Bluhm Hardwood Silviculture Cooperative Department of Forest Science.
Sediment Retention model
Challenges and Opportunities in Using Wood to Pay for Fuels Treatments Guy Robertson USDA Forest Service.
Forests, Parks and Landscapes
Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart.
Chapter 9: Economic Transformation, 1820—1860
Wisconsin’s Forests and the Comprehensive Planning Law Preserving forests in the wilderness of Smart Growth.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Self-Supporting Truckways: Closing the Gap in Financing Expanded Goods Movement By Robert W. Poole, Jr. and Peter Samuel.
New approaches to Materials Education - a course authored by Mike Ashby and David Cebon, Cambridge, UK, 2007 © MFA and DC 2007 UNIT 6. Objectives in conflict:
Riparian Strategies: Operational Issues. Purpose: Physical requirements and limitations of logging systems when harvesting in riparian areas Physical.
Beyond the Basic Forest Resource Model Monday, April 10.
Developing a rapid assessment protocol for headwater drainage features Les Stanfield, Southern Science Information Section, MNR and Mari Veliz, Ausable.
TRANSPORTATION INFRASTRUCTURE l Transport functionality : product movement and product storage. l Product movement, in-transit inventory, material handling:
Form-Finding of Long Span Bridges with Continuum Topology Optimization and a Buckling Criterion Salam Rahmatalla (Graduate Student) Prof. Colby C. Swan.
Determining the Feasibility of the Recovery of Woody Biomass Bob Rummer, US Forest Service Mark Engle, Four Corners Consulting.
December 1, Market Value Determination Revenue and Transportation Interim Committee December 1, 2015.
Watershed Analysis Presented to the Washington State Forest Practices Board By Mary McDonald and Marc Engel Department of Natural Resources, Forest Practices.
Timber Harvest Elements of Forestry Kenneth Williams Fisheries Extension Specialist Langston University Aquaculture Extension Program.
UW Forest EngineeringKrogstad, Rogers & Schiess Comparing Environmental Impacts of Long-reach vs. Conventional Skyline Design Options Finn Krogstad, Luke.
Team 16: Alex Johnson Ashwin Nair Phuc Van Nguyen Ziran Zhu.
The Impact of the Railways Year 9. Social & Economic Impact of the Railways People became more interested in politics & this led to the growth of political.
WOOD 492 MODELLING FOR DECISION SUPPORT Lecture 14 Sensitivity Analysis.
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
RURAL TRANSPORT. Rural road transport: Africa  Personal motorised transport widespread in Asia; rare in Africa  African countries have to rely on inappropriate.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Aligning industry needs and restoration needs
Canada’s Primary Industries:
Loggers' Perception and Cut-Block Design
FOR 350 Silviculture.
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
Timber Supply Analysis Discussion Paper October 28, 2016
Landscapes: Forests, Parks and Wilderness
Forestry Practices ~ Part II ~.
Site and situation factors of industry
SOME ASPECTS OF FOREST ECONOMICS RESEARCH
BEST MANAGEMENT PRACTICES (BMP’S)
Wind Power Feasibility in North Carolina
ROUNDABOUTS Improving Safety and Efficiency
Introduction to Geographic Information Science
REGIONAL ISSUES & CONTROVERSIES
ISyE 6203 The HDT Case Vande Vate Fall,
Forest Resources Monday, April 4.
Presentation transcript:

1 UW Forest Engineering Schiess & Jaross Long-Span VS. Conventional Skyline Yarding: Road Densities, Economics and Silvicultural Options Peter Schiess & Weikko Jaross Forest Engineering, University of Washington & Departement of Natural Resources, Washington

2 UW Forest Engineering Schiess & Jaross Overview Issues and Objectives - why are we interested in long-span systems, what are the objectives General Skyline Systems Developments European Long-Span Systems North American Slackline Systems Production and Cost Issues Discussion and Conclusions

3 UW Forest Engineering Schiess & Jaross Issues Agreement between DNR and the Federal Government resulted in a Habitat Conservation Plan Ultimate goal is to reduce impact on sensitive habitats (fish/wildlife/water quality)

4 UW Forest Engineering Schiess & Jaross Several Approaches minimize road densities by increasing yarding distances (Current External Yarding Distances are < 1200 ft) reduce sediment deliveries to streams -road locations -construction practices -road system management (traffic/closures)

5 UW Forest Engineering Schiess & Jaross Road Densities in Relation to Yarding Distances (AYD’s) for Several Harvest Plans in Western Washington

6 UW Forest Engineering Schiess & Jaross Objectives assess current state of cable yarding production and costs for EYD > 2000 ft (1500 to 4000 ft EYD) Outline the critical issues

7 UW Forest Engineering Schiess & Jaross Skyline Operations - Turn of the Century YardingYarding Distances > 4000 ft Distances > 4000 ft up to 40,000 ft of cableup to 40,000 ft of cable crew of 26 people and morecrew of 26 people and more cheap labor - expensive transportation system (railroads)cheap labor - expensive transportation system (railroads)

8 UW Forest Engineering Schiess & Jaross Skyline System Developments changes in labor marketschanges in labor markets increased wages improved transportationimproved transportation (diesel trucks- dozer) cheaper to haul/build roads than to yardcheaper to haul/build roads than to yard Slackline systems EYD < 2000 ft Highlead < 1000ftSlackline systems EYD < 2000 ft Highlead < 1000ft

9 UW Forest Engineering Schiess & Jaross European Long-Span Cable Systems cheap laborcheap labor -high priced timber -difficult terrain long-span cable systemslong-span cable systems Standing skylinesStanding skylines (or Wyssen Systems) Wyssen, Gantner, Baco Yarding spans ftYarding spans ft

10 UW Forest Engineering Schiess & Jaross System Characteristics for a Wyssen-type Cable System Yarder W-90, 4400 lbs. Carriage Skyline, 5000 ft, 1 1/4 in Mainline 5000 ft, 5/8 in Spool truck Rigging Hardware Radios Landing Cat Loader Low-power, one-drum system with low drum speeds Relies on gravity for inhaul (down) Outhaul under power to get carriage out (up) Simple set-up (except for intermediate supports)

11 UW Forest Engineering Schiess & Jaross

12 UW Forest Engineering Schiess & Jaross Swiss Experiences with Long-Span Systems

13 UW Forest Engineering Schiess & Jaross Cycle Elements for a Wyssen-Type Long-Span System Reported by Different Authors

14 UW Forest Engineering Schiess & Jaross Total Cycle Times for Three Cable Systems, a Highlead, Large Tower and Wyssen Systems

15 UW Forest Engineering Schiess & Jaross North American Long-Span Tower System Only few, documented studiesOnly few, documented studies Binkley, 1965 Skagit BX 185, 3-drum yarderSkagit BX 185, 3-drum yarder 4,400 ft of 1-inch mainline4,400 ft of 1-inch mainline 5700 ft of 3/4-inch haulback5700 ft of 3/4-inch haulback 5000 ft of 7/ ft of 7/16 5,000 ft of 1 3/4 inch skyline on spool truck5,000 ft of 1 3/4 inch skyline on spool truck Average cycle time 9 min. for 1300 ft of AYDAverage cycle time 9 min. for 1300 ft of AYD

16 UW Forest Engineering Schiess & Jaross Model Development & Comparison

17 UW Forest Engineering Schiess & Jaross Owning & Operating Costs for a Large Tower and a Wyssen System

18 UW Forest Engineering Schiess & Jaross Variables and Values Used in Production Equations

19 UW Forest Engineering Schiess & Jaross Production Rates for Three Cable Systems, a Highlead, Large Tower and Wyssen System

20 UW Forest Engineering Schiess & Jaross Production Costs for Three Systems, a Highlead, a Large Tower and a Wyssen System

21 UW Forest Engineering Schiess & Jaross Rigging Times for Three Systems : a Highlead, a Large Tower and a Wyssen System

22 UW Forest Engineering Schiess & Jaross What does it mean? North American experiences with Wysssen long-span systems are well correlated with European experiences Production = f( distance, rigging supports, volume/station of corridor removed) Production not correlated with silviculture (clearcut - selection cut)

23 UW Forest Engineering Schiess & Jaross What does it mean? Available volume >.7 mbf/station of corridor Line speeds are important Large, old towers (rebuilt) appear to offer a feasible solution Full suspension a key to successful operations over long spans

24 UW Forest Engineering Schiess & Jaross Conclusions Time studies for Wyssen systems on the West Coast agreed well with models developed in Switzerland Rigging times are a significant factor Long-span systems are a promising alternative, when used with appropriate silvicultural systems (selection cuts with appropriate volume removal) Turn assembly becomes important (like Heli)