December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout.

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
NLC - The Next Linear Collider Project Interaction Region Issues Jeff Gronberg / LLNL Santa Cruz Linear Collider Retreat June This work was.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Beam Delivery, MDI related updates Andrei Seryi for BDS Area GDE/LCWS meeting at Bangalore March 10, 2006.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
11-13th October 2007 BDS KOM, SLAC 1 Accelerator and detector requirements specification and optimisation on example of interaction Region Deepa Angal-Kalinin.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
Working Group D Backgrounds M Sullivan for everyone in WG D IRENG07 Sept 20, 2007.
Collimation Baseline Configuration and Collimation Studies Frank Jackson ASTeC Daresbury Laboratory.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Manchester Christmas meeting 2006: The ILC interaction region and beyond Rob Appleby Happy New Year everyone!
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
Ring to Main Linac (RTML): Status and Plans ILC January Meeting (KEK) Peter Tenenbaum 19-Jan-2006.
Beam Delivery configuration materials to start discussion Andrei Seryi, Deepa Angal-Kalinin, Hitoshi Yamamoto BDS area GDE meeting at KEK, January 19-20,
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
ILC2016x 12/08/2016 LCWS2016 (Morioka, Japan).
For discussion of Final Focus and IR of plasma-based collider
Accelerator and detector requirements specification and optimisation on example of interaction Region BDS Design Team 11-13th October 2007 BDS KOM, SLAC.
CLIC-ILC BDS & MDI work.
Beam-Based Feedback in LCLS-II
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
CNGS Proton Beam: Introduction
Constraints on Working with Two IRs
The 2mrad horizontal crossing angle IR layout for the ILC
Beam Delivery System Schedule at ILC2010
First look at final focus part of super-B factory
Collimation Optimisation
NLC 2001 Beam Delivery Layout
Y. Nosochkov and M. Woodley (SLAC)
Standard SLAC BSY Copper Protection Collimator Rated at 20 kW
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout

December 15, 2004M. Woodley, Beam Delivery Group2 Yuri’s ILC 20 mrad dump lines NLC BSY dump lines 11 mrad Yuri-style Big Bends 55 m “stretch” 200 m drifts Andrei’s 20 mrad ILC FF (x 4) Symmetric “Push-Pull” Layout IR1 20 mrad IR2 2 mrad

December 15, 2004M. Woodley, Beam Delivery Group3 bending in energy collimation system reduced for zero net coll/FF bend; reduces max η (was m) Andrei’s “ff126” modifications applied to latest NLC coll/FF system Includes: spoilers absorbers muon shields photon masks PCs stoppers instrumentation feedback

December 15, 2004M. Woodley, Beam Delivery Group4 Yuri-style (NLC) 11 mrad Big Bend ISR:

December 15, 2004M. Woodley, Beam Delivery Group5 Plans add energy spectrometers (~55 m) add polarimeters (~50 m) “Push-Pull” or longitudinal IR separation? 2 mrad coll/FF/extraction design incorporate Brett Parker’s design for fast extraction / tune-up into NLC dump line adjustments for PPS (people in one IR with beam in the other IR)

December 15, 2004M. Woodley, Beam Delivery Group6