Can we run step 3 with the downstream Tracker in a fixed position? This means during step 3 the downstream Tracker can never be moved on air skates or.

Slides:



Advertisements
Similar presentations
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Advertisements

Sustainability is Good for Business HOUSEKEEPING DEPARTMENT.
Bivariate Data Pt. 4 October Gotchas Don’t fit a straight line to a nonlinear relationship. Use residual plots to determine if the linear fit is.
Features and Benefits Systems can be designed to be portable with the use of a forklift or semi-portable. Does not require engineered piles or costly foundation.
Miscellaneous North America User Meeting - Milwaukee, Wisconsin Fixes, Enhancements, and Additions Stairs Ladders Handrails Kick Plates Connections.
Tips: * Just delete the page you don’t like. * Save the page you want only before submit to us.
Non-Traditional Day Hemet High School Non-Traditional Day HHS What is non-traditional? What is non-traditional? For Girls it might be…
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
1 Tracker Window & Diffuser Radius vs Scraping Aperture Chris Rogers Analysis PC 6th April 06.
Frequency Scanning Interferometry in detail 3 Oxford contributions to IWAA 2002 Multiple, simultaneous length measurements S. M. Gibson et al (After the.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Strategy and Competitive Advantage in Diversified Companies
Welcome! You can use this small app to easily find solutions to problems and download and run troubleshooters. To run a troubleshooter, simply click ‘Run.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Economies of scale in police air operations Daniel Livingstone, Home Office 04/03/2013.
Solar shading - helping to significantly reduce energy consumption in buildings.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
 Where are you going to source your finance?  Two types of finance ◦ Internal ◦ External.
Non-Traditional Day Hemet High School Non-Traditional Day HHS What is non-traditional? What is non-traditional? For Girls it might be…
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Workplace Organisation Today we are going to look at different kinds of working environment, e.g. Open plan Cellular Hot-desking Teleworking Flexible working.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
SOFTWARE ENGINEERING MCS-2 LECTURE # 3. SOFTWARE PROCESS  A software development process, also known as a software development life- cycle (SDLC), is.
Using the CMMI in small Organisations Stephen Fletcher PAS Ltd, UK.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
My PowerPoint Learning how to use PowerPoint Have you felt like you are on a roller coaster ride with your learning? You’re not alone.
Water Pollution How water polluted in world? Effects of water pollution.
Understanding the costs and savings FACTSHEET 7 Food and Garden Organics Best Practice Collection Manual.
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
How to build the turn table.. 1. The following parts are required : Rail Curved 22½ Deg. x : Train Wheel W/O-Ring x : Technic.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
LAS VEGAS IS RUNNING OUT OF WATER! Las Vegas Hoover Dam Hoover Dam is were we get most of our water from. It used to be very high but now it is really.
Product Focus: Using the Light Hatch to reduce time, costs and risk.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Applications of Linear Systems Objective: To choose the best method for solving a system of linear equations.
Clarification Meeting: Provision of Cleaning, Horticulture & General Maintenance Services for Majuba Rail Project 04 February 2016.
C. Rogers, ASTeC Intense Beams Group Rutherford Appleton Laboratory
بسم الله الرحمن الرحیم. Jet grouting.
Tips for Efficient Air Conditioning Maintenance
2016 Maintenance Innovation Challenge
Life Skills are Essential
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Capacity Utilisation.
World Health Organization
Validating Magnets Using Beam
Duct casings for particulate filters DCA
How to turn on MICE Step IV
Spaghetti Westerns Sustainability in the Public Sector
Troubleshooting MAIN 220 Fall 2003 Chris Miller 11/11/2018.
Garden Group Project.
GTR Class 387 – Great Northern Introduction
FREE CONVECTION – FIXED POWER TD1005
Week 13: Up the Ante and Test Yourself
Title of Project References Tips Significance Statement Key Findings
Warm- Up Jerry wants to ride in a hot air balloon. It costs $180 dollars to rent the balloon and an additional $30 dollars for each hour the balloon is.
ورود اطلاعات بصورت غيربرخط
مديريت موثر جلسات Running a Meeting that Works
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
STEEL PLATES.
Linear Optical Quantum Computing
C2 GPS Business SOLUTIONS Best Practice
Spray Booths Follow safe operating instructions
SoLID SIDIS He3 target collimator optimization
ES Waterfall Bridge.
DOUBLE PRODUCTIVITY BY SOLVING LONG STANDING PROBLEMS
Presentation transcript:

Can we run step 3 with the downstream Tracker in a fixed position? This means during step 3 the downstream Tracker can never be moved on air skates or rails to the offline position. Why? We don’t want to move 10 tonnes over an unsupported base plate. Not possible to grout the base plates for air skates and difficult to shim for rails. Does this fit in with the physics and maintenance scenario’s? We can get 360 Deg access to both Trackers by moving the upstream tracker (tracker 1) to the offline position. Motivation to do this is to save staff and capital cost.

Step 2

Plan view of step 2

Tracker 2 (Fixed) Tracker 1 (offline) Tracker 1 Tracker 2 (offline) DownstreamUpstream Downstream ? This is like going back to step 2