ENBIS/1 © Chris Hicks University of Newcastle upon Tyne An analysis of the use of the Beta distribution for planning large complex projects Chris Hicks,

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

The Normal Distribution
© C.Hicks, University of Newcastle IGLS04/1 Stochastic simulation of dispatching rules in the capital goods industry Dr Christian Hicks University of Newcastle.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Spring 2008, King Saud University PERT Dr. Khalid Al-Gahtani 1 Activity Duration 1.“Guess” the activity duration, especially smaller activities. 2.Use.
Chapter 11- Confidence Intervals for Univariate Data Math 22 Introductory Statistics.
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: Dongping Song Supervisor: Dr. C.Hicks and Dr. C.F.Earl Dept. of MMM Eng.
Engineering Economic Analysis Canadian Edition
Continuous Random Variables and Probability Distributions
Helicopter System Reliability Analysis Statistical Methods for Reliability Engineering Mark Andersen.
Engineering Probability and Statistics - SE-205 -Chap 4 By S. O. Duffuaa.
Fundamentals of Hypothesis Testing. Identify the Population Assume the population mean TV sets is 3. (Null Hypothesis) REJECT Compute the Sample Mean.
Genetic Algorithms for multiple resource constraints Production Scheduling with multiple levels of product structure By : Pupong Pongcharoen (Ph.D. Research.
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Continuous Random Variables Chap. 12. COMP 5340/6340 Continuous Random Variables2 Preamble Continuous probability distribution are not related to specific.
Stochastic Models in Planning Complex Engineer-To-Order Products
PG Conf /1 © F.A. Hossen, M&S Engineering University of Newcastle upon Tyne Managing Project Planning Risk Fouzi A. Hossen.
© C.Hicks, University of Newcastle IGLS06/1 Laissez-faire or full control? An evaluation of various control strategies for companies that produce complex.
ENBIS/1 © Chris Hicks University of Newcastle upon Tyne Stochastic simulation studies of dispatching rules for production scheduling in the capital goods.
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: D.P. Song, C.Hicks and C.F.Earl Dept. of MMM Eng. Univ. of Newcastle.
Planning operation start times for the manufacture of capital products with uncertain processing times and resource constraints D.P. Song, Dr. C.Hicks.
© C.Hicks, University of Newcastle ASAC06/1 Establishing the relationship between mean tardiness and the number of resources under close control for companies.
Using ranking and DCE data to value health states on the QALY scale using conventional and Bayesian methods Theresa Cain.
- 1 - Summary of P-box Probability bound analysis (PBA) PBA can be implemented by nested Monte Carlo simulation. –Generate CDF for different instances.
SEEM 3530 Program Evaluation and Review Technique
Market Risk VaR: Historical Simulation Approach
Copyright © Cengage Learning. All rights reserved. 7 Statistical Intervals Based on a Single Sample.
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: Dongping Song Supervisors: Dr. C.Hicks & Dr. C.F.Earl Department of MMM.
8-1 Introduction In the previous chapter we illustrated how a parameter can be estimated from sample data. However, it is important to understand how.
Chapter 9 Numerical Integration Numerical Integration Application: Normal Distributions Copyright © The McGraw-Hill Companies, Inc. Permission required.
Special Continuous Probability Distributions Leadership in Engineering
1 Assessment of Imprecise Reliability Using Efficient Probabilistic Reanalysis Farizal Efstratios Nikolaidis SAE 2007 World Congress.
Chapter 6 The Normal Probability Distribution
Statistics for Data Miners: Part I (continued) S.T. Balke.
Lesson 2 - R Review of Chapter 2 Describing Location in a Distribution.
1 Special Continuous Probability Distributions Gamma Distribution Beta Distribution Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS.
1 Lecture 13: Other Distributions: Weibull, Lognormal, Beta; Probability Plots Devore, Ch. 4.5 – 4.6.
ETM 607 – Input Modeling General Idea of Input Modeling Data Collection Identifying Distributions Parameter estimation Goodness of Fit tests Selecting.
- 1 - Bayesian inference of binomial problem Estimating a probability from binomial data –Objective is to estimate unknown proportion (or probability of.
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
1 3. M ODELING U NCERTAINTY IN C ONSTRUCTION Objective: To develop an understanding of the impact of uncertainty on the performance of a project, and to.
Calculating Risk of Cost Using Monte Carlo Simulation with Fuzzy Parameters in Civil Engineering Michał Bętkowski Andrzej Pownuk Silesian University of.
Probability = Relative Frequency. Typical Distribution for a Discrete Variable.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Chapter 12 Continuous Random Variables and their Probability Distributions.
Shanghai Jiao Tong University 1 ME250: Statistics & Probability ME 250: Design & Manufacturing I School of Mechanical Engineering.
1 1 Slide © 2007 Thomson South-Western. All Rights Reserved Chapter 8 Interval Estimation Population Mean:  Known Population Mean:  Known Population.
PERT/Activity Diagrams, Completion Probability and the Z Score
1 / 12 Michael Beer, Vladik Kreinovich COMPARING INTERVALS AND MOMENTS FOR THE QUANTIFICATION OF COARSE INFORMATION M. Beer University of Liverpool V.
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Chapter 7 : Risk Management – part 2
Lesson 2 - R Review of Chapter 2 Describing Location in a Distribution.
Incorporating Uncertainties into Economic Forecasts: an Application to Forecasting Economic Activity in Croatia Dario Rukelj Ministry of Finance of the.
Statistics Sampling Distributions and Point Estimation of Parameters Contents, figures, and exercises come from the textbook: Applied Statistics and Probability.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Lecture Slides Elementary Statistics Twelfth Edition
PERT/Activity Diagrams, Completion Probability and the Z Score
Estimating the Value of a Parameter Using Confidence Intervals
Chapter 17 Project Management McGraw-Hill/Irwin
Elementary Statistics
Monte Carlo Simulation Managing uncertainty in complex environments.
CPM, PERT & Schedule Risk Analysis in Construction
Continuous Probability Distributions
Dept. of MMME, University of Newcastle upon Tyne
Dept. of MMME, University of Newcastle upon Tyne
Summer Training Industrial Engineering Department
Dept. of MMME, University of Newcastle upon Tyne
4 WEIBULL DISTRIBUTION UNIT IV Dr. T. VENKATESAN Assistant Professor
Presentation transcript:

ENBIS/1 © Chris Hicks University of Newcastle upon Tyne An analysis of the use of the Beta distribution for planning large complex projects Chris Hicks, Business School Fouzi Hossen, Mechanical & Systems Engineering

ENBIS/2 © Chris Hicks University of Newcastle upon Tyne Introduction Large complex projects are often planned using project management systems based upon the Project Evaluation and Review Technique (PERT). PERT models uncertainties using the Beta distribution based upon estimates of optimistic, pessimistic and most likely activity durations. The Probability Density Function for a Beta distribution can be uniform, symmetric or skewed.

ENBIS/3 © Chris Hicks University of Newcastle upon Tyne Objectives To explore the relationship between the planning values used, the Beta distribution parameters and shape. A case study then establishes the cumulative impact of uncertainties using data obtained from a company that produces complex capital goods.

ENBIS/4 © Chris Hicks University of Newcastle upon Tyne The General Beta distribution Г represents the Gamma function α and β are the shape parameters and a and b are the lower and upper bounds

ENBIS/5 © Chris Hicks University of Newcastle upon Tyne Figure 1 Beta function for α = β Symmetric

ENBIS/6 © Chris Hicks University of Newcastle upon Tyne Figure 2 Beta function for α < β Left skewed

ENBIS/7 © Chris Hicks University of Newcastle upon Tyne Figure 2 Beta function for α > β Right skewed

ENBIS/8 © Chris Hicks University of Newcastle upon Tyne Planning estimates: optimistic (to), pessimistic (tp) and most likely (tm) Mean Standard deviation AlphaBeta Where μ s and σ s refer to the standard Beta distribution, which has a lower bound of 0 and an upper bound of 1 PERT parameters and the Beta distribution (Source: Moitra, 1990)

ENBIS/9 © Chris Hicks University of Newcastle upon Tyne Relationships Let us assume that to =X * t m and tp = Y * t m and substitute into previous equations

ENBIS/10 © Chris Hicks University of Newcastle upon Tyne

ENBIS/11 © Chris Hicks University of Newcastle upon Tyne

ENBIS/12 © Chris Hicks University of Newcastle upon Tyne

ENBIS/13 © Chris Hicks University of Newcastle upon Tyne

ENBIS/14 © Chris Hicks University of Newcastle upon Tyne For any values of X and Y we can calculate α and β and find the PDF

ENBIS/15 © Chris Hicks University of Newcastle upon Tyne Case Study Objective is to establish the cumulative effect of uncertainty through a series of simulation experiments. Data obtained from a collaborating capital goods company.

ENBIS/16 © Chris Hicks University of Newcastle upon Tyne (No. 15) (No. 11) (No. 17) Typical product, considered in simulation Uncertainties are cumulative because an assembly cannot start until all the necessary components and sub assemblies are available

ENBIS/17 © Chris Hicks University of Newcastle upon Tyne Experimental Design ExperimentXYαβ (Full factorial design with 1000 replicates) Note: T m is assumed to be the Company’s estimated operation time

ENBIS/18 © Chris Hicks University of Newcastle upon Tyne Results Histograms of lead-time for a typical component, assembly and the product are provided in the paper. The effective of cumulative uncertainty is to move the distributions to the right. Probability of meeting a due date produced by a deterministic planning system is very low. Product Lead Time BetaLxLyHxHyLxHyHxLy Mean (days)

ENBIS/19 © Chris Hicks University of Newcastle upon Tyne Conclusions The paper has established the relationships between the planning parameters t o, t m and t p. and the Beta parameters and the PDF. A case study has investigated the cumulative effect of uncertainties at assembly and product level. The results showed that lead-time was sensitive to the planning assumptions used. The lead time was 3 times longer in the worst case than the best case, despite the fact that the same most likely times were used. The probability of meeting due dates established by deterministic planning systems was very small. Managers should: i) minimise uncertainty; ii) take into account uncertainty in planning.