UMD Jan 2004 1 Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
USCMS/HCAL/TriDas. October, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland October 2003.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
CMS/ESSC. May, 2002HCAL TriDAS1 HCAL FE/DAQ Overview Shield Wall CPUCPU DAQ RUI HPD FE MODULE DAQ DATA SLINK64 [1 Gbit/s]  18 HTRs per Readout Crate FRONT-END.
USCMS Mayl TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Boston University October 31, Technical Status and Progress Report D. Baden, T. Grassi HCAL Trigger.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.
Communication Between FPGA and LabView - FPGA part.
UMD DOE Review - 30-Aug-05 Drew Baden1 CMS Trigger Elecctronics CMS HCAL TriDAS is a joint effort between: –University of Maryland – Drew Baden –Boston.
HTR status Tullio Grassi Univ. of Maryland Feb 2004.
CMS June TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
Understanding Readout Issues with the Pilot System October Fpix Upgrade Meeting Bora Akgün Will Johns Karl Ecklund Helmut Steininger Jordan Tucker.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Preparing software for LTU T.Blažek, V.Černý, M.Krivda, R.Lietava, M.Mojžiš Bratislava, Birmingham TDAQ working group meeting, CERN, March 24,
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Online clock software status
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
ATLAS SCT/Pixel TIM FDR/PRR
ATLAS SCT/Pixel TIM FDR/PRR
CCS Hardware Test and Commissioning Plan
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
Task T - CMS at LHC Global Calorimeter Trigger
ECAL OD Electronic Workshop 7-8/04/2005
Calorimeter Trigger Synchronization in CMS,
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
Trigger system Marián Krivda (University of Birmingham)
XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
TTC news December 04 Sophie Baron TTC.
The Trigger Control System of the CMS Level-1 Trigger
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for HCAL (and ECAL ?) One board per crate HTRHTR HTRHTR HTRHTR DCCDCC HTRHTR HTRHTR HTRHTR DCCDCC HTRHTR HTRHTR HTRHTR DCCDCC … … Rack-to-Rack CAT7

UMD Jan Jeremy’s Schematic (simplified) TTCrx TTC fiber Clk80 Input from GLOBAL Fanout 18 Outputs 40MHz RX_CLK = 40MHz RX_BC0 BC0 FPGA RX_CLK = 40MHz RX_BC0 QPLL 80MHz X-tal Path without QPLL, coming from another rack will increase jitter

UMD Jan Alterative scheme… TTC fiber Clk80 Input from GLOBAL Fanout 18 Outputs 40MHz RX_CLK = 40MHz RX_BC0 BC0 FPGA RX_CLK = 40MHz RX_BC0 TTCrx QPLL 40MHz QPLL can run stand-alone and replace the crystal

UMD Jan Resistor (removed in Global mode) TTC fiber Clk80 Input from GLOBAL Fanout 18 Outputs 40MHz RX_CLK = 40MHz RX_BC0 BC0 FPGA RX_CLK = 40MHz RX_BC0 TTCrx QPLL 40MHz 0 