Lunch. Bryan District Average Construction Cost Grade Separation –$ 10 Million 2 Lane to 4 Lane –$ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones)

Slides:



Advertisements
Similar presentations
RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
Advertisements

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
TEAMING FOR SUCCESS “TXDOT IS HERE TO HELP” Site Selection and Access For Large Distribution Centers 1 Several DCs in industrial park near Alliance Airport.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Central Texas Turnpike Project Tour Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike.
Cost Estimation System Tool
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Tax Increment Financing Town Center Project Midwest City, OK.
Chapter 3 Measuring Excavation and Sitework
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Chapter 34 Bridge Construction.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
1 Freeways and Interchanges CE453 Lecture 33 Source : A Policy on Geometric Design of Highways and Streets (The Green Book). Washington, DC. American Association.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
What Makes a Roadway Safe? ISLAND COUNTY PUBLIC WORKS DEPARTMENT Press key to advance this display.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
Highway Functional Classification PEAR Workshop September 2009 Spencer Stevens, Planning Office Joe Hausman, Office of Highway Information Ed Christopher,
Signs, Signals, Markings & Speed Limits Driver Risk Prevention Curriculum State of New Hampshire Departments of Education and Safety Division of Program.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
1 Topic. II.9. Sewerage Facilities. Manholes and Street Inlets Kinds of Sewerage Facilities §Facilities for the sewer network inspection, maintenance and.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
2002 AASHTO ROADSIDE DESIGN GUIDE A CONCISE OVERVIEW.
June 13, 2007 Access Management Program. NHCRP Report Impacts of Access Management Techniques Source: NHCRP Report 420, TRB 1999 Composite Crash.
Highway Design Class CTC 440. Introductions Students Me.
1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Creating a GIS Based Traffic Control Planning Tool for the Dallas District Andrew Karl Dr. Maidment CE 394K.3 GIS in Water Resources Term Project Due:
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
Department of Civil Engineering,
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
Jason J. Siwula, PE – Safety Engineer DOES 24+0=22+2? AN INTRO TO HSM METHODS.
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Urban Storm Drain Design: Cooperation with Municipalities.
Julie Skallman State Aid Division Director & State Aid Engineer.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Basic Hydraulics: Culverts – I
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Basic Hydrology & Hydraulics: DES 601
Zoo IC Phase II – WTBA Staging December 16, 2014.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Geometric Design: General Concept CE331 Transportation Engineering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Small Structure Design 101
1 The Highway Safety Manual Predictive Methods. 2 New Highway Safety Manual of 2010 ►Methodology is like that for assessing and assuring the adequacy.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
DICKINSON AVENUE RECONSTRUCTION
Work Zone Safety Review – District 1 - Duluth
Project Scope of Work Project Contacts
Geometric Design: General Concept CE331 Transportation Engineering.
Construction Considerations
Presentation transcript:

Lunch

Bryan District Average Construction Cost Grade Separation –$ 10 Million 2 Lane to 4 Lane –$ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones) –$ 1 Million/ Mile Signal –$ 100,000 Freeway – Controlled Access –$ 10 Million/ Mile

Programming - Strategies Gather data from similar projects –Cost/ mile equivalents Original plans TxDOT’s – Roadway Design Manual “Green Book” (Policy on Geometric Design of Highways and Streets TxDOT’s – Bridge Design Manual Site visit –note existing structures –consider topography Bid tabs and Estimator

General Estimate –Prepare ROW (Item 100) –Pavement –Structures Bridges Culverts/ Inlets/ Storm sewer –Items 462 through 466 Retaining walls –Item 423 –Embankment/ Excavation (Item 132/110) –Signals –Contingency (15-20% subtotal 1) –Mobilization (10% subtotal 2)

Items ftp://ftp.dot.state.tx.us/pub/txdot- info/des/specs/specbook.pdf (2004 Spec Book)ftp://ftp.dot.state.tx.us/pub/txdot- info/des/specs/specbook.pdf m (state wide and region specific) m ry/cserve/bidprice/s_0101.htm (Bryan District Low Bid) ry/cserve/bidprice/s_0101.htm

Pavement Main lane –$90/ SY (Flexible) Frontage/ Ramps –$65/ SY (Flexible) Urban Arterial –$80/ SY (Rigid)

Structures (400 Items) Culverts (Item 462) Reinforced Concrete Pipe (Item 464) Inlets/ Manholes (Item 465) Headwalls/ Wingwall (Item 466) Safety End Treatment (Item 467) Retaining Walls (Item 423)

Estimating Bridge Type

Bridge Design Manual Chapters 4 & 5

Bryan District Tx Girder Structure = $75/(sq. ft) Bryan District Average Tx Girder = 75/$SF

Estimator supports generation of cost estimates using cost-based and bid- based techniques. Regional information

Accounts for quantity

s/estimator.htm Wow! what a great program… but where can I get a copy?

Construction Cost = $ 5.9 Million

Construction Bid = $ 20 Million

Estimate = $23.3 Million