Fatality Modeling and the PEER Testbeds Shoaf and Seligson Casualty Project Kickoff UCLA CPHD 27 January 2003 Keith Porter, California Institute of Technology.

Slides:



Advertisements
Similar presentations
Decision Structures - If / Else If / Else. Decisions Often we need to make decisions based on information that we receive. Often we need to make decisions.
Advertisements

Microprocessors through the Ages A brief history of the microprocessor
Seismic Simulation: Advances with OpenSees
Hazard Recognition and Risk Analysis
PEER 2002 PEER Annual Meeting Thinking Ahead: Issues for Adoption of PBEE uPeter J. May uCenter for American Politics and Public Policy uUniversity of.
Design should address: UNDERSTRENGTH OVERLOAD
Hazard Recognition and Risk Analysis 2 Safety & Administration Fire Escape Route Gathering Place Room Hazards Restroom Locations Food Breaks Cell Phones.
Visual 5.1 Search and Rescue Operations  Sizeup  Search involves:  Locating victims.  Documenting location.  Rescue involves procedures and methods.
On time invariant probabilistic modelling of duration of load effects for timber Sven Thelandersson Structural Engineering Lund University.
Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift Marios Panagiotou Assistant Professor, University of.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
HISTORY OF ENGINEERING-BASED EARTHQUAKE CASUALTY MODELING.
1 Holmes IRCC Workshop October 18, 2006 Motivation and Development of PBEE for Existing and New Buildings William T. Holmes Structural Engineer Rutherford.
Protecting Infrastructure: The Role of Standards John Hooper Director of Earthquake Engineering Magnusson Klemencic Associates.
ATC 58 Performance Assessment Calculation Tool (PACT)
Van Nuys Sensitivity Study Keith Porter PEER Building Testbed Progress Meeting Richmond Field Station 23 May 2002.
Pacific Earthquake Engineering Research Center (PEER) Overall Status Report Jack P. Moehle Director University of California, Berkeley.
PEER Tall Buildings Initiative—Task 2 Workshop April 18, PEER Tall Buildings Project T ask 2 – Develop Consensus Performance Objectives Interview.
Research Status UC Science Building PEER Testbeds Fall 2002 Quarterly Meeting Holiday Inn Oakland Airport 8 November 2002 Keith Porter, California Institute.
Panel Discussion: PBEE Practice and Needs Paul Somerville, URS Joe Maffei, R&C Ron Hamburger, SGH Lloyd Cluff, PG&E Tom Shantz, Caltrans Jim Malley, Degenkolb.
PEER Jonathan P. Stewart University of California, Los Angeles May 22, 2002 Geotechnical Uncertainties for PBEE.
PBEE Decision Variable Considerations DISCUSSION PEER TESTBED MEETING 5/23/02.
© Simpson Gumpertz & Heger Inc. 1 Development of Performance-based Seismic Design Standards & Criteria Ronald O. Hamburger, SE, SECB Senior.
Quantifying risk by performance- based earthquake engineering, Cont’d Greg Deierlein Stanford University …with contributions by many 2006 IRCC Workshop.
Risk Decision Making for Buildings – From Owners to Society Mary Comerio University of California, Berkeley PEER Summative Meeting 13 June 2007.
The story continues… Jack Moehle. PEER Graduation “Take a couple years off and find out what you really want to do.”
Pacific Earthquake Engineering Research Center (PEER)
The use of risk in design: ATC 58 performance assessment procedure Craig D. Comartin.
Modeling Decision Variables: Dollars, Deaths, and Downtime Judith Mitrani-Reiser (JHU) James L. Beck (Caltech) PEER Annual Meeting San Francisco, CA January.
PEER Tall Buildings Initiative—Task 2 Workshop April 18, Background of Seismic Codes and Performance Expectations.
OFFICE OF THE FIRE COMMISSIONER MANITOBA URBAN SEARCH AND RESCUE Urban Search and Rescue Manitoba CAN TF-4 Rivers Manitoba January 2011.
Overhead Sign Support Structures: Meeting AASHTO 2001 John W. van de Lindt CDOT Staff Bridge Communication Day – September 27, 2004.
Implementation, Adoption, and Stakeholder Perspectives Peter J. May University of Washington PEER Summative Meeting – June 13, 2007.
Framework for Performance-Based Earthquake Engineering Helmut Krawinkler, Stanford U. PEER Summative Meeting – June 13, 2007.
PEER Summative Meeting 13 June 2007 Implementation, Adoption, and Stakeholder Perspectives Peter J. May University of Washington.
PEER Research: Accomplishments & Impact Greg Deierlein, Stanford University and the PEER Research Committee PEER Summative Meeting – June 13, 2007.
PEER A Survey of Bridge Practitioners to Relate Damage to Closure Keith Porter Bridge Testbed Meeting 21 Oct 2003.
Crosscutting Topic 2 Bridge Impacts and DVs Keith Porter PEER Bridge Testbed Progress Meeting Richmond Field Station May 22, 2002.
Breast Cancer Awareness October is Breast Cancer Awareness Month Submitted by Kadee Brousseau, Peer Advisor, University of Missouri.
Module 1-1 Road Safety 101. Module Tracking Your Progress Through Highway Safety Core Competencies Core Competency 1: Core Competency 2: Core Competency.
Seismic LRFD for Pile Foundation Design
Specifications for Highway Bridges
Fire Safety through Building Design
PEER 2002 PEER Annual Meeting Lessons from the Nisqually Earthquake for PBEE uStephanie E. Chang.
Performance-Based Earthquake Engineering
NFPA Urban Fire Forum October 20 – 23, 2011 Quincy, MA Glenn A. Gaines, Deputy Fire Administrator Risk Reduction for Citizens and Fire Department Members.
6 th International Workshop on Micropiles Tokyo, Japan, August 24-27, 2004 Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr. Donald.
Performance-based Earthquake Engineering – A Very Short Introduction (why taking Dynamics of Structures) Dr. ZhiQiang Chen UMKC Spring,2011.
IMPLEMENTATION OF SCEC RESEARCH IN EARTHQUAKE ENGINEERING ONGOING PROJECTS SCEC PROPOSAL TO NSF SCEC 2004 RFP.
AGI LEADERSHIP FORUM James W. Russell, Ed.D. Vice President Outreach.
Estimation of Future Earthquake Annualized Losses in California B. Rowshandel, M. Reichle, C. Wills, T. Cao, M. Petersen, and J. Davis California Geological.
Stress Definition: An individual’s physiological and emotional response to stimuli that place physical or psychological demands on an individual and create.
Fatigue of Materials. Fatigue Definition: Damage accumulated through the application of repeated stress cycles Variable amplitude loadings cause different.
NEEDS FOR PERFORMANCE-BASED GEOTECHNICAL EARTHQUAKE ENGINEERING
The Role of Building Codes in Delivering Seismic Performance John Hooper Director of Earthquake Engineering Magnusson Klemencic Associates.
BALLOON + JET ENGINE = QUALITATIVELY NEW TRANSPORTATION MEAN ??????? NO !
Progress towards Structural Design for Unforeseen Catastrophic Events ASME Congress Puneet Bajpai and Ben Schafer The Johns Hopkins University.
THE FRAGILITY OF OLDER ROAD USERS IN BRITAIN Kit Mitchell.
PROBLEM # 2 SQUARE HSS Page # 4-52.
Week 1 Seminar Firefighter Fatalities in the United States.
ShakeOut M 7.8 Earthquake on the San Andreas Fault: Initial Damage Assessment & Impacts on Critical Lifeline Infrastructure Ken Hudnut (USGS) November.
Pacific Earthquake Engineering Research Center HAWAII WASHINGTON CALIFORNIA OREGON Core University Partners: UC Berkeley, Davis, Irvine, Los Angeles, San.
During the semester Introductions Basics of earthquakes
Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr
Load Combinations Represent Plausible Events
UC Alumni Leadership Forum 2017
Risk or Consequence? The Concept of Consequence Based Explosion Resistant Design Sirous Yasseri IMECHE Seminar on Engineering Structures Survival: Blast.
By: Prof Dr. Akhtar Naeem Khan
اختر أي شخصية واجعلها تطير!
التعامل مع ضغوطات العمل إعداد وتقديم إقبال المطيري
Presentation transcript:

Fatality Modeling and the PEER Testbeds Shoaf and Seligson Casualty Project Kickoff UCLA CPHD 27 January 2003 Keith Porter, California Institute of Technology

2 Casualty Modeling in PEER Brief history of seismic design PEER PBEE methodology PEER decision variables PEER testbeds PEER fatality modeling requirements

3 2-minute History of Seismic Design Before 1924, no code for seismic design 1920s: allowable stress design (ASD) [ Resistance/Demand  factor of safety ]  OK 1980s: load and resistance factor design (LRFD) [  R   D ]  [ P f  acceptable P f ]  OK 1990s+: performance-based engineering (PBE) [ Performance ≥ Demands ]  OK

4 PEER PBEE

5 PEER Decision Variables Dollars Deaths Downtime

6 PEER Testbeds Ages, systems, damage measures, stakeholders & decision variables

7 Requirements of the Fatality Model p[D deaths | DM, &] DM: damage measures – which ones? &: what else matters? –Structural system –Occupancy numbers, patterns, demographics –Search and rescue resources –… Illustrate for Van Nuys