K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
The MICE Target Lara Howlett University of Sheffield.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Time Remaining 20:00.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
ESS Program Plan and Schedule Update
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
Hydrogen System Update
Brief Status SPS Prototype PSB Prototype Installed in LS1
MICE Target Report Video Conference 29/11/07
Project Manager’s Report + DC/MoM Report
MICE CM31 Schedule summary
Far Detector Activities Late 2017 – Early 2018
Crystal Template - Trial Version.
Target 3D Instructions for import of the implant library
Ciprian Plostinar Workshop on Testing and Commissioning
CMB-S4 Detectors & Readout Task Force Update
Daresbury ESS In-Kind Contributions
Overall time schedule of SRF activities
GLAST Large Area Telescope:
Electron Beam Systems ETC and Methodology
UPPSALA UNIVERSITY_GERSEMI PROJECT
Accelerator Installation Schedule
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009

Critical path: No particular issues, but: – Vacuum tubes ready to be sent to Sheffield – Stator assembly ready for vacuum tubes at Sheffield – Weld trials successful – Parts in manufacture

Manufacturing: highlights:

Installation and commissioning schedule: Presented / discussed at Target w/s last Friday Revised version to be presented / discussed at CM24 Need to have Target w/s with ISIS in June: – Make sure manufacturing remains on track; – Discuss installation and commissioning plans; – Ensure manpower assumptions for shutdown are valid