Tera-Pixel APS for CALICE Progress meeting, 31 st August 2007 Jamie Crooks, Microelectronics/RAL.

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
Tera-Pixel APS for CALICE Progress meeting, 17 th May 2006 Jamie Crooks, Microelectronics/RAL.
VLSI Digital System Design
Tera-Pixel APS for CALICE Progress meeting, 17 th September 2007 Jamie Crooks, Microelectronics/RAL.
TPAC1.1 Jamie Crooks. TPAC1.1 (honest) First Batch Four boards – Received 10 at last meeting from Paul – Tested before bonding 9 boards operated correctly,
TeraPixel APS for CALICE Progress meeting 30 th March 2006 Jamie Crooks, Microelectronics/RAL.
ASIC1 progress Jamie Crooks, Feb 08. Bonding Problems: Resolved Smaller bonding wedge + revised programShorts to seal ring discovered under bonds.
Introduction to Op Amps
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
1 Electronic Circuits VOLTAGE REGULATION. 2 Electronic Circuits THE ZENER REGULATOR;
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
1 Daniel Micheletti Darren Allen Daniel Mazo Jon Lamb Lyle Johnson Pixel Perfect WiCam: A Wireless Digital Camera Presented by : Kyle Swenson.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
ASIC1  ASIC2 Things still to learn from ASIC1 Options for ASIC 1.01  1.1  1.2 Logic test structure for ASIC2.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
U.B. Presentation October Bernard COURTY L.P.C.C. College de France - Paris.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
Irradiation Test of the Omegapix2 Digital Tier May 18-22, 2015, CERN Olivier Le Dortz, LPNHE Paris Juin 2015.
Phase-1 Design. i PHC Phase /04/2008 System Overview Clock, JTAG, sync marker and power supply connections Digital output.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
F February 5, 2001 Pixel Detector Size and Shape David Christian Fermilab.
Tera-Pixel APS for CALICE Jamie Crooks, Microelectronics/RAL SRAM Column Concept.
J. Crooks STFC Rutherford Appleton Laboratory
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
NMOS FABRICATION 1. Processing is carried out on a thin wafer cut from a single crystal of silicon of high purity into which the required p-impurities.
ClicPix ideas and a first specification draft P. Valerio.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
MIT Lincoln Laboratory kickoff-1 PWW 4/7/2000 Via Topology for 3-D Integration 7 April 2000 Peter W. Wyatt and Paul V. Davis
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
TIMELINE FOR PRODUCTION 2  Need to be ready for production end next year  => submission of final mask set ~September 2015  Would like one more iteration.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
Tera-Pixel APS for CALICE Progress 30 th November 2006.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Series Circuits and Parallel Circuits.. Series and Parallel Circuits Series Circuits: only one end of each component is connected Example: Christmas tree.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
Potential Dividers and their application as sensors Electricity Lesson 9.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
4.9 Source Transformations The Node-Voltage Method and the Mesh-Current Method are powerful techniques for solving circuits. We are still interested in.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Development of T3Maps adapter boards
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Purpose of This Minilab
Markus Friedl (HEPHY Vienna)
DCD – Measurements and Plans
Mini-drawers, FE-ASIC , Integrator
RCU3 –> RCU4 New Schematics
TPAC1.1 progress Jamie C 4th June 2008.
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Assembly order PCB design
LCLS Machine Protection System
Presentation transcript:

Tera-Pixel APS for CALICE Progress meeting, 31 st August 2007 Jamie Crooks, Microelectronics/RAL

Test progress (predicted) turn on 13 th Aug !  ~8 days  4 th September in my plan today 31 st Aug  ~1 day  ~1 days ~1 day  ~1 day ~1 day

Pixel results: Very preliminary!

Monostable + bias VDD1V8MSO PORHIT600 RST600HITIN biasp biasn VSS VDD1V8DCO MSOBIAS2 EnB (pad)(array) msobias2 (column)

Monostable + current limit bias VDD1V8MSO PORHIT600 RST600HITIN biasp biasn VSS VDD1V8DIG OUTBIAS (pad)(array) msobias2 VDDO 3.3v1.8v

System overview FPGA LVDS TRx ASIC1 3.3v I/O 1.8v CORE (2m Cable) 3.3v DAC Need to either –run chip I/O at ~1.8v –Correct the design so the I/O can be run at 3.3v and the bias chain still operated correctly Simply driving 3.3v signals into the chip would forward-bias the protection diodes in the pads!

Option 1: Level Shifters FPGA LVDS TRx ASIC1 1.8v I/O 1.8v CORE (2m Cable) 3.3v 1.8v DAC 1.8v Re-spin sensor card adding level shifting circuits, –Active –Passive (resistor divider) Card footprint can remain the same if LA connectors are removed

Option 2: Direct connection FPGA ASIC1 1.8v I/O 1.8v CORE 3.3v 1.8v DAC Remove LVDS transceivers on both boards Bond/solder across the footprint FPGA can work with single-ended outputs/inputs at 1.8v Cable must be short, fast signals may be compromised and operation may need to be slowed down

Option 3: Adjust power supplies FPGA LVDS TRx ASIC1 2.0v I/O 2.0v CORE (2m Cable) 3.3v 2.5v DAC Run the chip at 2v –Possible degradation to lifetime/reliability Run the LVDS and inverters at 2.5v –This is below the minimum supply (3v) stated in datasheet –Parts do work at >2.1v but probably not at full quoted data-rate (that we don’t need) Noise margins are compromised but circuits should function as intended Requires minor modifications to the power regulators/distribution on the sensor card.

Option 4: Combined cards FPGA ASIC1 1.8v I/O 1.8v CORE 3.3v DAC Re-spin FPGA daughter card to include the sensor footprint

Option 5a: Die Modification Use laser or focussed ion beam (FIB) techniques to make corrections to the existing chip design Cut opening through: Oxide layers M6,M5,M4,M3, Deposit M2 track Connection from M2 to M3 is broken by removing metal 3 above the vias Metal 3 (shown) (metals 4,5,6 similar structures above forming power ring) Metal 2

Option 5b: Die Modification Use laser or focussed ion beam (FIB) techniques to make corrections to the existing chip design Cut ~10 micron access holes through M6, M5, M4, M3 (Cut ~5 micron dia. hole through M2) Connection from M2 to M3 is broken by removing metal 3 above the vias & optionally also M2 below VDD1V8DIG OUTBIAS 1.8v VSS Use laser or focussed ion beam (FIB) techniques to make corrections to the existing chip design –Remove connection to VDDO –Drive OUTBIAS with voltage DAC to give crude control of current flow – should be sufficient for this bias as it only limits current flow in logic cells. VDDO V-DAC

Option 6: Design Modification Make changes to the design and re-fabricate –Single mask (M2) change

Summary of Options Sensor card DAQ card CableTimesacleCost 1Level shiftersRe-designNo change2m ok~4 weeks? 2Direct connectModify existing Minimum lengths only ~1 week? 3Adjust power suppliesModify existing No change2m ok~instant 4New FPGA+Sensor card AbandonRe-designNone~4 weeks? 5Die modificationsNo change ~2 weeks?(a) Quote requested (b) Giulio? 6Design modify + re-fab No change ~8 weeks?~$25K