Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Laser interferometric beam size monitor (Shintake-monitor)

Slides:



Advertisements
Similar presentations
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Halo calculations in ATF DR Dou Wang (IHEP), Philip Bambade (LAL), Kaoru Yokoya (KEK), Theo Demma (LAL), Jie Gao (IHEP) FJPPL-FKPPL Workshop on ATF2 Accelerator.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
2. High-order harmonic generation in gases Attosecond pulse generation 1. Introduction to nonlinear optics.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Very Forward Detectors Workshop on beam position monitoring and detector alignment.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
The Detector and Interaction Region for a Photon Collider at TESLA
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Taikan SUEHARA, 3 rd ATF2 project KEK, 2006/12/18 Status of Shintake-monitor Optics (focused on phase stabilization) Taikan SUEHARA The University.
Photon Diagnostic Station For TAC IR-FEL Test Facility ILHAN TAPAN* *on behalf of the TAC collaboration Uludag Universitesi, Bursa,16059, TURKEY References.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
About L* i.e. the distance between the end of the last quadrupole “QD0” and the IP Until now, L* has been different for SiD and ILD, -> due to detector.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Taikan Suehara, 2008/03/05 Shintake monitor in ATF2: status, performance and prospects Taikan Suehara (The Univ. of Tokyo) M.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
BASIC CONCEPT reflecting layer glass capillary wall CENTER LINE optically active layers polyimide.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Overview of the GlueX Tagger and Photon Beamline..
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
Taikan Suehara, ILC-Asia physics meeting, 2009/06/13 page 1 Tau-pair analysis for LoI+ Taikan Suehara ICEPP, The Univ. of Tokyo.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ATF2 background and beam halo study D. Wang(IHEP), S. Bai(IHEP), P. bambade(LAL) February 7, 2013.
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
Beam halo and background Bremsstrahlung photon spectrum modeling Update on 9 th Nov
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
1 Progress of the Thomson Scattering Experiment on HSX K. Zhai, F.S.B. Anderson, D.T. Anderson HSX Plasma Laboratory, UW-Madison Bill Mason PSL, UW-Madison,
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
ALICE setup: update on the installation 18/10/2010 Angela Intermite.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Layout of a Building Leveling Instruments Builders Level Level-Transit Laser Beam Level.
FCC-ee Interaction Region design
M. Sullivan Apr 27, 2017 MDI meeting
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Layout of Detectors for CLIC
Beam-beam effects in eRHIC and MeRHIC
Test of Optical Stochastic Cooling in CESR
Large Booster and Collider Ring
Final Focus Synchrotron Radiation
Bubble Chamber Planning Meeting
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
LCLS Commissioning Parameters
The fingerprints of elements
Serge Kalmykov, UNL (WG 6, Tuesday, 10/26/2017) vg +15 fs
The Measurement of Forward Particle Production in LHC
IPBI-TN R. Arnold (with help from T. Fieguth)
Low Energy Electron-Ion Collision
USPAS Course on 4th Generation Light Sources II
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Laser interferometric beam size monitor (Shintake-monitor)

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Baseline Layout 2.5m spacing from bend to dump. Edge of the dump is at ~10cm beyond the beam line.

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Photons from beam pipe 70~90% of photons (by electrons interacting with pipe) come forward, up to beam energy (1.3GeV)

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Photons from beam pipe No energy dependence for position of detector.

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Photons from beam pipe Spread over beam pipe (signal is focused to center)

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Photons from beam pipe

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Photons from beam pipe Energy spectrum is broad up to 1.3GeV The rate seems to be very high (with no collimeter) –0.7~0.9 photons for 1 collision to pipe Position is much spread than signal

Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Shipping Optical table –Returned back to Nittsu because of some problem of carry-in (and bad weather) –Retry tomorrow with some attachments Other components –Have carried-in in Hongo –Now checking