PingER Managament. Tasks Achieved During Last Week Incorporated historical downdays search (instead of just the previous week) Incorporated historical.

Slides:



Advertisements
Similar presentations
Relational Database Systems Higher Information Systems Advanced Implementation in Microsoft Access.
Advertisements

Fleet Management Jason Lawrie. New features constantly being added 122 releases in the last 12 months 277 improvements made in that period Help is available.
FUNCTIONAL ICT LEVEL 2 Advanced Excell. Data types.
Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info. Expert Judgement Analoques Estimating Simulation Activity Duration.
Practice Insight Instructional Webinar Series Reporting
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
AiDA Redesign Phase II August 13, AiDA Redesign Status: –Phase I redesign implementation work is currently underway by the technical team –Phase.
DSE Cardinus Garry Storer IT Training Co-Ordinator IT Services.
Access 2007 Product Review. With its improved interface and interactive design capabilities that do not require deep database knowledge, Microsoft Office.
PingER Management1 Error Reporting Model for Ping End-to-End Reporting (PingER Management)
March 20, 2008 Team DunKyan.  Functionality implemented to date  Current activities  Plans for rest of semester  Software demonstration  Reporting.
PingER Management. Motivation The PingER database stores ping results from a huge number of monitoring site -remote site pairs. The PingER database stores.
PingER management. Tasks Achieved Remote Node Names –The remote node names have been included in the table –The table structure was modified by adding.
OOP Project Develop an Application which incorporates the following OO Mechanisms and Principals: – Classes Visibility Constructor(s) Class Variable (if.
Progress Presentation. Current Task Currently my task is to extend my package to produce plots of loss quality as a function of time. Currently my task.
Progress Presentation. Tasks Completed I have resolved most of the bugs in the previous graphs of stanford to the world monitoring data. Completed work.
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
Selection Sort
Handling Large Projects  Project Decomposition  Stepwise Refinement Functional Decomposition Design Decomposition  Work Breakdown Structures (WBS)
1 PingER Executive Plots MAGGIE 21 st Feb Sequence 1. Brief Overview of Project 2. Current Implementation and Capabilities 3. Types of Charts.
1 times table 2 times table 3 times table 4 times table 5 times table
Access 2007 ® Use Databases How can Access help you to find and use information?
MEDICAL THERAPY PROGRAM WEB BASED MODULE. Background History of the MTP module Rolled out Phase 1 – 2002 Began Phase 2 – 2005 Implementation of Phase.
ONLINE CLAIMS TRACKING
Practice Insight Instructional Webinar Series Reporting
Using The Wiki Big Picture Twitcher Exercise Recap Feedback Forms Extension Exercise Check Learning Design Planning Timer Web Design.
Barbara Lee Schueppert Northwest Technical College
STOP BULLYING by Lucinda Brunson.
Lecture 7 Interaction. Topics Implementing data flows An internet solution Transactions in MySQL 4-tier systems – business rule/presentation separation.
What’s New in VRS? GUGM May 15, 2008 Presenter: Kelly P. Robinson GIL Service Georgia State University
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
Your project title here Your name Construction Management University of Houston PROGRESS REPORT Reporting Period: From date – To date.
Lister Hill National Center for Biomedical Communications Gateway Update MLA 2005.
Let VRS Work for You! ELUNA Conference 2008 Presenter: Kelly P. Robinson GIL Service Georgia State University
NARFE’S NEW Online Activities Modules What are Online Activities Modules Online refers to internet access only – Provides easy access to specific.
NCSU Libraries Kristin Antelman NCSU Libraries June 24, 2006.
Display time for Project having around 25,000 entities of each type Display time for Project having around 25,000 entities of each type Table loading.
Selection Sort
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 7 1 Microsoft Office FrontPage 2003 Tutorial 8 – Integrating a Database with a FrontPage.
Incorporating Feedback Lesson 5 0. Check-in: paper prototype By now, your paper prototype should be complete, so that you can begin creating your app.
WEEK 1 You have 10 seconds to name…
Scenario Topics. Creating Work Item Lists Use a work item list: To track status for a team or group of tasks. To view or change work items offline. To.
VLE Development Work Placement By Timothy Bryan. The Placement  To assess, upgrade, improve and utilise the current Moodle site for Stockport College.
CS 101 – Nov. 11 Finish Database concepts –1-1 relationship –1-many relationship –Many-to-many relationship Review.
1 Weekly Slippage Report Current (Start / Finish) vs. Last Week Comparison Microsoft Project Users Group  Introduction  Current (Start / Finish) vs.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
DRIVER DRIVER DIAGRAM a framework for success A framework for success.
Tables Learning Support
Weekly Progress 14 Dec Tasks Undertaken  In the VRVS meeting with SLAC I was given the following tasks : To evaluate the project’s current functionality.
Weekly Progress MAGGIE 8 th March Overview I am currently working on a software in java which provides graphical analysis of PingER historical data.
3-1 Modeling Basic Entities DBMS Create Sort Search Addition Deletion Modification Create Sort Search Addition Deletion Modification DBMS is a Software.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Databases Computer Technology. First Record Last Record New Record Previous Record Current Record Next Record Working with Microsoft Access (Database)
GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled.
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
Workforce First Line Managers Middle Managers Senior Management CEO Strategic Planning 90 Days + Tactical Planning 2 weeks ahead Operational / Task Planning.
PHL 323 Week 2 Individual Ethical Systems Table Complete the Ethical Systems Table located on the student Web site. To purchase this material click below.
PHL 323 Week 2 Summary Complete the Ethical Systems Table located on the student Web site. To purchase this material click below link
WEB 434 Week 5 DQ 1 Based on the Honigman (2008) article, “Peek-a-boo, I SEO you,” identify three things you can do when designing a Web site to improve.
WEB 434 Week 5 DQ 2 Identify and describe three critical practices to achieve search engine optimization (SEO). Check this A+ tutorial guideline at
Perspectives on drafting
Proposed administrative data handbook
Times Tables.
Name, department/event, date
Amendment Invoice Task Force Progress Report
3 times tables.
6 times tables.
Presentation transcript:

PingER Managament

Tasks Achieved During Last Week Incorporated historical downdays search (instead of just the previous week) Incorporated historical downdays search (instead of just the previous week) In case a site was down last week, go back in time to see when it was last seen up.In case a site was down last week, go back in time to see when it was last seen up. The formats for some fields needed to be re- implemented.The formats for some fields needed to be re- implemented. The table was improved as a result of some suggestions from Les.The table was improved as a result of some suggestions from Les.

Current Task Currently I am working on integrating the beacons sites list with the downsites table, Currently I am working on integrating the beacons sites list with the downsites table, Which would allow the update of beacon site status in the downsites databse. Which would allow the update of beacon site status in the downsites databse. There are some problems due to mismatch between the names in the list and those in the PingER data There are some problems due to mismatch between the names in the list and those in the PingER data Will finish this, as soon as the mismatches are resolved at SLAC. Will finish this, as soon as the mismatches are resolved at SLAC.

Further Tasks To provide sorting capability in the web display as well as some analysis such as total no. of down pairs etc. To provide sorting capability in the web display as well as some analysis such as total no. of down pairs etc.