JPL’s Approach for Helping Flight Project Managers Meet Today’s Management Challenges Charles J. Leising Space Telescope Science Institute Technical Colloquium.

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

Global Congress Global Leadership Vision for Project Management.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
© Devon M.Simmonds, 2007 CSC 550 Graduate Course in Software Engineering ______________________ Devon M. Simmonds Computer Science Department University.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
National Aeronautics and Space Administration Systems Engineering (SE) Tools National Aeronautics and Space Administration Example.
Copyright © 2013 United Launch Alliance, LLC. Unpublished Work. All Rights Reserved. Civil Space 2013 Critical Challenges: Safety, Mission Assurance, and.
1 Independent Verification and Validation Current Status, Challenges, and Research Opportunities Dan McCaugherty IV&V Program Manager Titan Systems Corporation.
ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
The program work breakdown structure (WBS) establishes the essential
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
CMMI Course Summary CMMI course Module 9..
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
ENGINEERING LESSONS LEARNED AND SYSTEMS ENGINEERING APPLICATIONS Paul S. Gill and Danny Garcia, NASA Technical Standards Program Office William W. Vaughan,
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Development of Methodologies for Independent Verification and Validation of Neural Networks NAG OSMA-F001-UNCLASS Methods and Procedures.
Request for Proposal (RFP)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
1 Technology Infusion of the Software Developer’s Assistant (SDA) into the MOD Software Development Process NASA/JSC/MOD/Brian O’Hagan 2008 Software Assurance.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
1 PDS MC Requirements Process March 29, 2007 (v2).
Engineering Economics Lecture 18 Project Management 6 January 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Supplier Management Can’t live with them, Can’t live without them!
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Engineering and Science Directorate Organization Structure June 2016.
Project Office Effectiveness Educating the Organization on How to Use a PMO February 22 nd, 2006.
Supportability Design Considerations
I&T&C Organization Chart
Chapter 6: Database Project Management
Identify the Risk of Not Doing BA
Building a Business Case for Systems Engineering
Enterprise Content Management Owners Representative Contract Approval
Defining the Activities
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
By Jeff Burklo, Director
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Instrument PDR Summary of Objectives
Project Management Chapter 11.
PSS verification and validation
GLAST Large Area Telescope:
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

JPL’s Approach for Helping Flight Project Managers Meet Today’s Management Challenges Charles J. Leising Space Telescope Science Institute Technical Colloquium November 16, 2004

2 Background and Environment Mid 90s –JPL faced decreasing NASA budgets, increasing cost pressures and competition –Explosion in number of small projects –Retirement of experienced personnel Adopted “soft projectization” and FBC –Project Mgrs empowered to pursue creative approaches for cutting costs –Threw out old tried and true procedures Mars failures –External review committees questioned “how we do business” Environment after the failures –Increased oversight –Continued pressure to reduce costs

3 Problem Statement How can we put rigor back into the process and still get more efficient as an institution? How can we help project managers succeed in this difficult environment?

4 Approach Standardize the “routine” processes –New Flight Project Practices and Design Principles –New “standard” JPL lifecycle, gate products and WBS –Better coordinated review process –New project management training classes –Group procedures Increase the institutional support: –New position of Associate Director –New Project Support Office –Better partnering between line and projects –Mission design tools, cost databases, planning templates, examples and “project support” websites –Burden funded support teams

5 Project Support Office Project Support Office Control Systems Office Control Systems Office Project Engineering Office Project Engineering Office Project Planning Office Project Planning Office Planning Support Costing Office Team Support Launch Support Proposal Center FHLP Training Design Principles Flt. Proj. Practices Technical I/S Project Facilities Project Data Mgt System Config. Mgmt. Organization

6 Institutional Guidelines Design Principles: Covers mission,systems, hardware, software and operations Includes subsystem designs, margins, interface requirements, grounding, EMI and verification Flight Project Practices: Top level implementation practices 23 management, 18 engineering and 8 mission assurance Compliance: Compliance matrices document compliance Attached to Implementation Plan Deviations must be justified and approved

7 General Mechanical Configuration/Systems Power/Pyrotechnics Information System Telecommunications System Guidance, Navigation & Control Propulsion System System Thermal System Fault Protection System EMC/EMI Flight Software System Flight Hardware System Project Programmatic Resource Margins Budget Reserve Schedule Margin Mission Design Resource Margins Propellant Flight System Development Resource Margins General System Mass System Power System Energy Flight Software Margins Power/Pyro System Margins Telecom System Margins Flight Hardware Margins General Min Op Times for Electronics Handling & Test Constraints Pre-delivery Verification Subsystem and Assembly Level Early Interface Testing System Level System Assembly, Integration & Test System Assembly System Integration System Functional Verification Flight Sequence Verification System Fault Protection Verification System Stress Testing System Envir Verification Inter-system Verification Launch Operations Pre-mate Verification Post-mate Verification Managed Margins Software Flight System Design Mission Design Flight Sequence Design Flight System V&V Design Flight System Flight Ops Design Design Principles

8 Life Cycle WBS and Planning Science Organization NEPA & Launch Approval Spares, Testbeds, and Models Make-or-Buy Decisions Scheduling, Cost Estimating, Etc Information Mgt Level 1 Descope Planning Project Staffing & Destaffing Priorities/Competing Char Acquisition Reporting Reviews Risk Management Waivers Crisis Response Science Data Management Ext Comm & Public Engagement Lessons Learned Margins & Margin Mgt ITAR Mission Design Telecommunications Design Mission Operations S.E. L/V and Launch Operations Inheritance Planetary Protection Fault Tolerance/Redundancy Flight H/W Logistics Materials, Processes, and Contamination Control S/W Devel Protection and Security of Flt H/W Design & Verification for Environmental Compatibility System Level Functional V&V C. M. Orbital Debris H/W Development Mission Ops System Devel M.A. Mgmt Reliability Engineering Q. A. S/W IV&V Electronic Parts Reliability, Acquisition Problem Reporting Mission Operations Assurance Systems Safety Engineering Practices Management Practices Mission Assurance Practices Flight Project Practices

9 JPL Project Lifecycle

10 Gate Products Documented over 100 products required at each Gate in the LifeCycle –planning –costing –technical Maturity at each Gate –draft, preliminary or final Used by projects and upper management: –planning –costing –scheduling –assessment Invoked by Flight Project Practices

11 Examples of Gate Products Project plans Mission scenarios System requirements Cost estimates Flight designs Verification results Interface documentation Command dictionaries Flight rules Etc

12 Templates and Examples Work breakdown structure and dictionary Plans –Task Plans (funding authority) –Project Plans responsive to FPP and NPG –Detailed Project Implementation Plans, compliance matrices and work agreements Grass roots costing guidelines Documentation trees Requirements documentation Maintained in library accessible from website

13 Formulation Team Multi-disciplinary team –7 burden- funded, full time equivalents –Planning, work breakdown structures, cost estimation, earned value support, requirements definition, information system, software, acquisition Support projects –Institutional requirements –Templates, examples and process support during Formulation Phase –Time-critical problems Assures that projects get started on right path for successful implementation

14 Project Support Website

15 Project Support Website - Life Cycle

16 Project Support Website - Reviews

17 Also Available on Website for Each Project Review Scope Timing Objectives Success Criteria Agenda Topics Relationship to Other Reviews

18 Project Support Website - Review Descriptions

19

20 Project Support Website - Project Management and System Engineering

21 Project Support Website - Flight Hardware Logistics Program

22 On-Line Configuration Mgt Plan

23 Configuration Mgt Plan Example

24 Cost Risk Factors Mission Complexity –Multiple flight elements or objectives –Precision lander –Harsh environments Significant Technical Development –Critical S/C or instr technology with TRL<5 –Lack of fallback options –Multiple I/Fs with critical development New or Unvalidated Software Inheritance –New architecture, fault protection or team –Undocumented inheritance and new team Technical Margins –New design with multiple deviations from Design Principles –Inherited H/W with single deviation System Architecture –New architecture, environment or technology –Poorly defined Level 1 Reqts –Multiple ACS Modes or deployments –Excessive reliability reqts –Excessive pointing control reqts Contractor Capabilities Match –Inexperienced in mission application –Foreign partner delivering hardware which is mission critical or on critical path Programmatic/ Cost and Schedule Margin –< 12 month Phase A/B or 30 month Phase C/D –Schedule margins below G/Ls –Multiple programmatic I/Fs Management and Organization –Inadequate team experience or workforce –No risk mitigation plan –Instrument selection late in Phase B

25 Application of Risk Factors Subfactors identified to explain and quantify each factor Factors and subfactors identified as: –Primary: add 5% –Secondary: add 2% 20% allocation added for unknown- unknowns Correlation based on 13 most recent projects Validated through review and application to other projects Used as a tool for evaluating reserve posture on new proposals and projects

26 Project Manager Course Week-long offsite offered twice a year End-to-end overview of JPL Project Life Cycle Rules, lessons learned, where to get help Presentations, panel sessions, top management, NASA and contractor involvement Planning, costing, project control, system engineering, design, development, test and operations Assumes management skills and focuses on how to manage a project at JPL Required for all candidate project managers Highly rated and much in demand

27 Summary Reliability and efficiency have been increased Changes in culture have taken 3 years –Everyone now knows what is expected –Couldn’t have happened without active top management support Definition of rules in combination with more institutional help to project personnel has proven to be an excellent model Could be applied to other organizations