DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis.

Slides:



Advertisements
Similar presentations
What is engineering? Engineering - The branch of science and technology concerned with the design, building, and use of engines, machines, and structures.
Advertisements

October 28, 2011 Christopher Schumacher (Team Lead) Brian Douglas Christopher Erickson Brad Lester Nathan Love Patrick Mischke Traci Moe Vince Zander.
Propulsion PDR 1 Team 1 September 21, 2006.
DR2 Aerodynamic PDR II Aerodynamic Preliminary Design Review II “The 20 Hour Marathon” October 19, 2000 Presented By: Loren Garrison Team DR2 Chris Curtis.
The Black Pearl Design Team: Ryan Cobb Jacob Conger Christopher Cottingham Travis Douville Josh Johnson Adam Loverro Tony Maloney.
SAE Aero Design Guidelines Rev A, 2013 Aero Design Oral Presentation Guidelines How to Deliver a Presentation The Judges will Notice.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Keith Hout Patrick Dempsey Bridget Fitzpatrick Heather Garber Jong Soo Mok Stability Control and Flight Performance PDR October 24, 2000.
Dynamics & Control PDR 1 Purdue University AAE 451 Fall 2006 Team 4 Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Mark Kock Ravi Patel Ki-bom Kim.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000.
PROPULSION PDR#1 Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
AME 441: Conceptual Design Presentation
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
DR2 Stability and Control Preliminary Design Review and Performance PDR October 24, 2000 Presented By: Christopher Peters …and that’s cool Team DR2 Chris.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
Project Plan Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
DR2 Propulsion PDR I Preliminary Design Review II October 17, 2000 Presented By: Mark Blanton Team DR2 Chris Curtis Loren Garrison Chris Peters Jeff Rodrian.
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
Team 5 Aerodynamics PDR Presented By: Christian Naylor Eamonn Needler Charles Reyzer.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 2 Team 1 October 3, 2006.
DR2 Structures PDR Structures and Weight Preliminary Design Review October 5, 2000 Presented By: Jeff Rodrian & Chris Curtis Team DR2 Loren Garrison Chris.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Flight Performance, Stability and Control PDR Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
AAE 451 – Fall 2003 Ares Team Mir Rashiduzzaman Alethea Tan Kai-Hui Leong Darwin Lisan Jung Hyun Ahn John Ko.
Justin DeStories Aircraft Design. Objective/Requirements  The UAV team at Arizona State University is designing, optimizing, and building an autonomous.
Oklahoma State University Aerospace Capstone Orange Team Final Presentation “Shamu: A Whale of a Plane” April 16, 2001.
Real World Design Challenge
Objectives Pick one final design (Only discussions crucial to design choice will be allowed to occur) Note that many exact locations for many.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
The Lumberjacks Team /16/12 Brian Martinez.
Group 10 Dimitrios Arnaoutis Alessandro Cuomo Gustavo Krupa Jordan Taligoski David Williams 1.
Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
Subsystem Level Design Review.  Project Review  System Level Changes ◦ Tail Dragger ◦ Airfoil Change and Discussion  Subsystem Selection ◦ Fuselage.
February 24, Dynamics & Controls 1 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
DR2 Aerodynamic PDR Aerodynamic Preliminary Design Review October 3, 2000 German National Holiday Presented By: Loren Garrison Team DR2 Chris Curtis Chris.
DR2 Propulsion PDR I Preliminary Design Review September 28, 2000 Presented By: Mark Blanton Team DR2 Chris Curtis Loren Garrison Chris Peters Jeff Rodrian.
October 2, 2003PPR1 Team 5 PPR Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
SAE Aerospace Regular Class High Lift Competition Educational Aircraft Design Objective: To develop a stable, controllable, high lift aircraft to serve.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
12/11/12 Brandon Campbell & Ernesto Chairez. Purpose  Civil Transport  Large Volume  Efficient  Quiet  Long Range.
Kwanjung Yee Pusan National University Aircraft Conceptual Design Copyright © 2009 by Kwanjung Yee.
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Team 3 Structures and Weights PDR 2
Propulsion PDR 1 Team #3 Presented by: Greg Davidson Etan Karni
Propulsion Preliminary Design Review #1
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
Preliminary Design Report
Structures and Weights 1 QDR
Team 5 Propulsion PDR Scott Bird Mike Downes Kelby Haase Grant Hile
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Aether Aerospace AAE 451 October 3, 2006
Fuel Cell UAV 2016 PROJECT ADVISORS DR. ZHANG AND DR. DEMUREN
Structures and Weights Preliminary Design Review
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
John Apostol, Chris Grupido, Douglas Klutzke
Aether Aerospace AAE 451 September 27, 2006
Prototype Fabrication, Economic, & Test Plan QDR
Structures and Weights 1 QDR
Structures PDR #1 AAE451 – Team 3 October 28, 2003
Dynamics N Controls 1 PDR
Dynamic Modeling PDR Dynamic Modeling Preliminary Design Review for Vehicle and Avionics October 17, 2000 Presented By: Christopher Peters …and that’s.
Dynamics and Control PDR 1
Vehicle Sizing PDR AAE451: Balsa to the Wall
Aether Aerospace AAE 451 September 6, 2006
Presentation transcript:

DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis

DR2 Project Plan Review Project Plan Review Propulsion Propulsion LeadMark Blanton Date and Milestone –September Propulsion Preliminary Design Review #1 Analysis Preliminary Propulsion System Sizing Determine characteristics of motor, propeller, gearbox, and battery system –September 26 Propulsion PDR #1 DR2 Presentation –September 27 Propulsion PDR #1 Rework –September 28 Propulsion PDR #1

DR2 Project Plan Review Project Plan Review Propulsion Date and Milestone –October 3-5 Propulsion Experiment Test Stand Construction Beginning Oct. 3 rd ending Oct. 5 th Propulsion Experiment Procedure Developed by Oct. 5 th –October 11-12Propulsion Experiment Evaluation of different motor and propeller combinations using Boeing Tunnel at ASL Provides hard data concerning performance for propulsion sizing –October 13-14Propulsion Experiment Analysis/Propulsion PDR #2 –October 15Propulsion Experiment DR2 Presentation –October 16Propulsion PDR#2 Rework –October 17Propulsion PDR#2 Presentation Final Sizing of the Propulsion System

DR2 Project Plan Review Project Plan Review Propulsion Date and Milestone –October 18-22Thiokol Report – Propulsion Section Analysis –October 23Thiokol Report – Propulsion Section Presentation to DR#2

DR2 Project Plan Review Project Plan Review Structures Date and Milestone –September 28Finalize Composite Supplier –October 1Wing Construction Method & Wing Test Plan –October 2Fuselage Construction Method & Wing and Fuselage Interface –October 5Structures and Weight PDR –October 12Wing Test Model Complete –October 14Test Wing Model –October 15Analyze Wing Test Results

DR2 Project Plan Review Project Plan Review Structures II Date and Milestone –October 15Analyze Wing Test Results –October 16Preliminary Fuselage Layout, Wing Test Summary, & Fuselage Loft –October 18Landing Gear Design Complete –October 20Final Structure Design –October 22Report Draft –October 23Draft to Group –October 30Final Analysis and Parameter Verification

DR2 Project Plan Review Project Plan Review Aerodynamics Date and Milestone –September 29Airfoil Selection –October 2Aircraft Sizing Code Complete –October 3PDR 1 –October 5Develop CFD Model –October 13CFD Model Complete –October 17Preliminary Results for PDR 2 –October 19PDR 2

DR2 Project Plan Review Project Plan Review Aerodynamics II Date and Milestone –October 20Report Draft –October 23Draft to Group –October 30Final Analysis and Parameter Verification

DR2 Project Plan Review Project Plan Review Controls Date and Milestone –September 30SM, CG, and NP estimations –October 1Aircraft Sizing Code –October 1 VT and HT estimations –October 3Preliminary Aircraft and Systems T.F. –October 8Preliminary Control Surface Sizing –October 11VT, HT, Ctrl. Surf., trade studies/PDR to Group –October 12PDR

DR2 Project Plan Review Project Plan Review Controls II Date and Milestone –October 17Final Ctrl. Surf. Analysis –October 21Aircraft and systems simulation in Simulink –October 22Report Draft –October 23Draft to Group –October 24PDR 2 –October 30Final Analysis and Parameter Verification