IMPACT Report SSMO Receiving Review– January 23, 2007.

Slides:



Advertisements
Similar presentations
Rosetta Magnetic Field PDS Review B. J. Anderson.
Advertisements

PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Configuration Management Backup/Recovery Project Review.
Online Analysis for STEREO's IMPACT Investigation: Lessons Learned P. Schroeder, J.G. Luhmann, W. Marchant and V. Toy (University of California – Berkeley),
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
IMPACT Status and Data Updates SWG Pasadena, February 3-5, 2008 Janet Luhmann and Peter Schroeder for the IMPACT team.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison  HI Image Simulation – C. Davis & R. Harrison  HI Operations Scenarios.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
Plastic Software Status and Data Access March 27, 2007 Lynn Kistler & Lorna Ellis.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
Space Science MO&DA Programs - October Page 1 SS Evidence for Mass Fractionation in the Isotopic Composition of Solar Energetic Particles Although.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO June 11, 2008 STEREO at 1.4 years.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
IMPACT SWG Status Report – December 11, Early IMPACT Timeline Status Day 3,410-28, 10-29IDPU/MAG/SWEA and STE turned on Day 711-1Booms deployed.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
IMPACT Data Plans May 2006 Peter Schroeder UC-Berkeley
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LYRA Calibration, Data Products, Plans I. E. Dammasch, ROB/SIDC PROBA2 Science Meeting Sun 360, Kiel, Jul 2011 LYRA the Large-Yield Radiometer onboard.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
STEREO PLASTIC PLASTIC: The Plasma and Suprathermal Ion Composition Investigation on STEREO A.B. Galvin, E. Moebius, L. Kistler, M. A. Popecki, J. Quinn.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
IBEX-lo 2015 Ops and ISN Overview D. Heirtzler et al, UNH/SSC IBEX SWTM August D. Heirtzler, A. Galli, K. Fairchild, H. Kucharek, T. Leonard, E.
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Jan 2008 LMSSC - 1 SWEA Plume Impingements Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
IMPACT Status and Data Updates SWG Meudon, April 21-22, 2008 Janet Luhmann, Peter Schroeder, and Chris Russell for the IMPACT team.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
Fermi Gamma-ray Burst Monitor
WEC meeting TED status and WEC timing.
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
Operational Flight Software
I&T&C Organization Chart
Launch and On-orbit Checkout
The STEREO Space Weather Broadcast
IMPACT Instrument Status
Presentation transcript:

IMPACT Report SSMO Receiving Review– January 23, 2007

Instrument Status – Boom Suite MAG is operating well. The MAG offset is larger than expected and changes with time – but can be corrected on ground. SWEA is nominal. STE-D units are operating well. STE-U units are unusable. They are light saturated (Ahead when door is open, Behind both when door is open and closed). Offset maneuvers performed specifically for STE-U and for other reasons verify that saturation varies with offpoint angle in a complex way. We are working with the test unit and the data from the offpoints to understand how exactly this is happening.

Instrument Status – SEP Suite LET is operating well. Minor software problems have been found and are being worked by the LET group. However, these problems are not affecting the quality of LET’s science data. HET is nominal. SEPT is nominal. SIT Ahead is nominal. SIT Behind is ramping up its high voltage this week and should be operational by Friday, Jan 26.

Ground Systems Status

Operations IMPACT has two POC’s (primary at UCB, backup at APL). During commissioning both have been used extensively but will revert to Berkeley POC after SEP group finished commissioning. POC software is running nominally. Capable of sending real-time and time-tagged commands. POC software engineer Mike Hashii is now our IMPACT operations backup

Status of IMPACT Data Products Beacon –Produced at SSC (GSFC) –Uses NOAA antenna partners for 24/7 space weather monitoring –First version of processing software delivered to SSC for Mission Sim 3. Expect major revision shortly. L1 –Produced at UCB after validation by instrument teams –Highest time resolution data in physical units of all measured quantities –Available in variety of formats (CDF, ASCII, FITS, …) –Reside natively in ISTP-compliant CDF’s (Data Files being produced for MAG, SWEA, STE, LET. Processing software for HET, SIT and SEPT submitted and undergoing internal testing and integration with processing suite. Verified MAG data ready to be released this week with LET soon to follow. Other instruments are still performing commissioning and calibration and expect public release in February.) L2 –Produced at UCLA –Key parameter (1-minute cadence) data in physical units –Includes PLASTIC and SWAVES –Available in ASCII (NOT YET AVAILABLE – expected implementation in 2 to 3 weeks) L3 –Produced at UCLA –Higher level products such as event lists –ASCII (NOT YET AVAILABLE – expected implementation in 4 to 6 weeks)

Still to Be Done Continue investigation and monitoring of STE-U to understand what happened – light problem does not jeopardize Level 1 science SIT HV to be ramped up this week SWEA data processing software and verification to be completed with offset-corrected MAG data Data processing software integration needs finishing and final calibrations determined

Where to Get IMPACT Data L0 and L1 data online at: SEP-specific data at: MAG-specific data at: ssc.igpp.ucla.edu/forms/stereo/indexhttp://www- ssc.igpp.ucla.edu/forms/stereo/index Level 2 data available through UCLA (website to broadcast soon) me with any comments, problems or suggestions at:

STE-U Backup Slides

STE Locations Ahead Spacecraft SWEA STE-D MAG STE-U IMPACT Boom

STE-USTE-D

The STE units are sensitive to light Above ~1E-5 Suns it saturates (moonlight is not bright enough to saturate it, but earthlight) –With the door closed the unit works OK in room light, but is not perfectly sealed Saturation starts with increasing reset rates until at ~1000 resets/second the dead time due to reset paralyzes the system and no events are counted. The front end electronics current also starts to rise significantly at this point The STE instrument apertures are not sunlit and there is nothing in the STE FOV that can scatter light into the instrument, so sunlight takes at least 2 bounces to get onto the detector A simple scattered light analysis indicated we should be OK –STE-U-A was the biggest concern as there are a number of objects that can scatter light onto the front of the instrument (though not directly into the aperture). –STE-U-B has fewer items that can scatter light onto the front of the instrument –Note that the sun-shades on the STE-U unit are outside the FOV –STE-D units are in the dark and pointing away from the spacecraft.

STE-U-A STE-U-B

STE-U-A STE-U-B Closeout Pictures

ETU STE Tests on the ground Testing ETU STE on the ground with calibrated light source to attempt to replicate what we see on orbit with STE-U (door closed) Results indicate a significant light leak for STE-U-B

Sample STE-D-B Results