CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
Engineering H192 - Computer Programming The Ohio State University Gateway Engineering Education Coalition Lect 30P. 1Winter Quarter ENG H193 & H193A Projects.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
XS26-2 Expandable Safety Controller.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Chapter 1 Introduction. Chapter 1 -- Introduction2  Def: Compiler --  a program that translates a program written in a language like Pascal, C, PL/I,
Click to add text Systems Analysis, Prototyping and Iteration.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Ladder Assembly All tools and jigs produced Glue dispensing works
Status of straw production straw module assembling
Equipment for Assembly – UK Experiences
Status Brussels GANTRY
UCSB Hybrid Bonding & Testing
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
OGP Surveying & DB Entry
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
UCSB Dicing, Wire-Bonding and Board Assembly
FNAL Hybrid Testing Status
Presentation transcript:

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October 2003

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 2 MODULE DATA - SENSORS

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 3 MODULE DATA HYBRIDS (1) HYBRID TO SENSOR ANGLE WAS NOT CONSISTENT AT FIRST. (MODULES 1 – 41, NEXT SLIDE) AFTER INCREASING HYBRID CLAMPING PRESSURE, BY SHIMING THE HYBRID TOOLS, IT SEEMS TO BE MUCH MORE CONSISTENT. (MODULES 42-60, NEXT SLIDE)

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 4 MODULE DATA HYBRIDS (2) HYBRID CAME DOWN ON EDGE OF HV WIRE

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 5 Stereo Module Have built 3 stereo modules (included in previous results).

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 6 Assembly Plates 4 fully commissioned R-phi assembly plates 1 prototype R-phi assembly plate (could be used if needed) 1 fully commissioned Stereo assembly plate

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 7 ASSEMBLY TOOLING (1) BREIF DISCUSSION OF THE DEVELOPMENT OF UCSB MODUDE ASSEMBLY TOOLING: Z and U axis made orthogonal to to gantry base plate. Aerotech U motor mounting bracket replaced

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 8 Assembly Tooling (2) 2. SUPPORT PADS FOR THE ASSEMBLY PLATES WERE MACHINED FLAT & PARALLEL BY THE GANTRY

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 9 ASSEMBLY TOOLING (3) 3. ASSEMBLY PLATE FEET MACHINED FLAT & PARALLELTO WITHIN 25um Sensor vacuum Hybrid vacuum Hybrid supply vacuum

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 10 ASSEMBLY TOOLING (4) 4. ASSEMBLY PLATE TEFLON PADS ARE MACHINED TO FINAL HEIGHTS (+/- 25um) REFERENCED OFF OF FEET ON BOTTOM Vacuum channels and o-ring grove machined into assembly plate for each sensor

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 11 ASSEMBLY TOOLING (5) 5. HYBRID AND SENSOR PICK-UP TOOLS. 6. HYBRID BRIDGE

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 12 Gantry/Data Base/OGP Moving towards using OGP for final module surveys. Andrea Allen (recent UCSB physics graduate/technician) has automated the OPG surveying of the modules, so that it is much faster than the gantry. Andrea has written excel macros to compare the survey results with the nominals and output them to files for each position on each assembly plate. The results are also output in a text file that can be incorporated into an xml file and uploaded to the DB. This will allow module production on the gantry to start earlier each day. Will make it easier to do 12 modules/day if needed (probably will be). The calibration factors used in the gantry are based on OGP surveys of the modules. Using the OPG surveys for the DB should slightly improve our results.

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 13 GANTRY 3 RD POSITION PROBLEM Did not see problem on R-phi assembly plates, except for occasional skipping of 3 rd position thermistor glue points. Problem was very evident on new stereo assembly plate. 8 of 10 dry runs on the 3 rd position could not be completed. Russell noticed that the problem looked like it was totally position dependent, so he wrote a program to count from 1-50 at points on a grid covering the gantry area we use. Russell’s results showed a strip in the gantry Y axis between the 3 rd and 4 th rows of the calibration file where there were errors in the counting while sitting at those locations.

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 14 Gantry 3 rd Position Problem Below are the results from this survey using our current calibration file that has calibration points on a 20mm grid. Miscounts occurred

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 15 Gantry 3 rd Position Problem Below are the results from this survey using an old calibration file that has calibration points on a 40mm grid. Miscounts occurred between same strips

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 16 Gantry 3 rd Position Problem Solution : Russell added rows of dummy calibration points to move “bad area” off of assembly plate Dummy points

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 17 U600 Card U600 controller cards & 4EN-PC expansion boards can not be ordered from Aerotech after the end of December 2003 (see Product Phase Out Notification). Reason – There are chips on the boards that are no longer available. Spares may or may not be available after December UCSB has ordered 1 U600ultra w/32MB controller card. We want to see if it will help some areas where the gantry program is slow on our system. We currently have a U600base w/8MB controller card. We will keep the U600base card as a US spare.

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 18 A3200 Controller Option There is the option of replacing the U600 and expansion card with Aerotech’s current A3200 controller. Basic process to convert to the A3200 – no guarantees! Replace DR500 with 4 (one for each axis) A3200 controller/power supplies. Each controller has 12 output ports and 14 input ports (expanded I/O version). Control of gantry is done thru software and the 4 controller/power supplies. No cards put in computer. Current I/O lines would have to be rewired from 4EN-PC expansion card to the four A3200 controller/power supplies. Gantry program should run on A3200 controller without modification. Cost ~ $12,500 USD

CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 19 Other stuff… Working on detailed instruction document for technicians (Andrea). Russell has automated the insertion of sensor and hybrid numbers into gantry program from the DB. Just made tool to check the overall length of the glue dispensing tool before module assembly. Creates an E-stop situation if it is too long. Plan to do 45 module mini production run in one week (9 modules per day) in early November.