Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.

Slides:



Advertisements
Similar presentations
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
The MICE Target Lara Howlett University of Sheffield.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
Magnetic measurements of MICE target stator Ben Shepherd MICE target meeting 11 October 2010.
Target Paper Status Summary 21 st December 2010 Chris Booth 1.
Target Paper Status Summary 13 th December 2011 Chris Booth 1.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Jan '09Positron Target Status1 Positron Target Prototype - Status Leo Jenner.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
G.Barber Mice Target Stator Field Mapping March Mice Target Stator Field Mapping G Barber, E Longhi, C MacWaters, P Smith, J Tarrant & Many others.
Flip Flop Professional Development June 14, 2012 Presenters: Jane R. Pablico Gloria A. Quisido.
Having Trouble with Pop Ups?  Any one of the following settings can affect a machine’s Pop Up features.  STEP ONE:  Make sure Pop Up Blocker is turned.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
The Generator. Electricity Generator Energy: The ability to do work Two Examples: Mechanical Energy: Energy that comes from the motion of an object Electrical.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group.
EEE1012 Introduction to Electrical & Electronics Engineering Chapter 9: Introduction to Electric Machines by Muhazam Mustapha, October 2010.
Welcome to Everybody. পরিচিতি দিলীপ কুমার পাল টেকনিক্যাল টিচার্স ট্রেনিং কলেজ ইইই বিভাগ.
Welcome to Everybody. পরিচিতি দিলীপ কুমার পাল টেকনিক্যাল টিচার্স ট্রেনিং কলেজ ইইই বিভাগ.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
TRISHUL Winding Solutions Pvt Ltd Armature What is an Armature? Armature is the part of a motor in which a current is induced by a magnetic field. The.

Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Unit 4 Day 7: Magnetic Fields due to Wires Magnetic Field in a Straight Wire Magnetic Fields in 2 Parallel Conducting Wires, Side by Side Magnetic Forces.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Motors and Generators.
Elec467 Power Machines & Transformers Electric Machines by Hubert, Chapter 12 Topic: Self-excited and compound generators, load distribution.
A Magnet and Refrigerator for a Drell Yan Experiment Possibly at FermiLab.
Capstone Design - Personal mobility - Group name : 올라가 조 박경원 정태산 이효진 강석우.
How Does a Wind Turbine Work?
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
TRISHUL Winding Solutions Pvt Ltd
Flight Preparation Boulder Ballooning Workshop 2006 BOREALIS Montana State University.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
DC Motor For students of the second stage in the Department of Electrical Engineering Introduction by Salam Mohammed Atiyah Master of Electrical Engineering.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
Induction Motor. Induction motor Main parts are Stator Rotor.
Accuracy Activity: Be a Mind Reader
and schedule appointment
A Cold SCU Phase-Shifter
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
L&V Manpower Development Prepared by: HR department Mar, 2013
Science Activity: Stnd 01 Date
Presentation transcript:

Target: K. Long, 16Nov2009

Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t download it! – Next steps: Non-DLC bearings: – Material now available and machining about to start – Will produce a T2#3 with new bearing materials In parallel: – Checking forces generated with mis-aligned coils using OPERA model (PS, TB) – Devising magnetic QA rig (GB + Shf) – Devising concept for winding coils that is more precise Schedule T3: – Machining of parts well advanced – Coils being prepared in Sheffield – Will consider whether to use new coils or present coils based on: » Magnetic analysis » Magnetic QA on T2 stator

T3 schedule: T3 schedule still looks OK: – Need to expedite ‘R&D’ work on T2#3 Which is in hand