Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.

Slides:



Advertisements
Similar presentations
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
Advertisements

Water Treatment Processes Disinfection and removal of solids.
Overview of Water Treatment
Often water is prescreened, treated with ozone, or pre-chlorinated before entering the coagulation basin (depending on the quality of the water). Coagulation.
CE 370 Sedimentation.
Zelienople Water Department Sources and Treatment.
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
An-Najah National University Civil Engineering Department
CE 370 Filtration.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Surface Water Treatment Plant
ARSENIC REMOVAL Case History Milos Markovic. Arsenic removal m3/day Plant in Subotica-SERBIA.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
Surface Water Treatment Rule Bob Clement Drinking Water Program U.S. EPA Region 8.
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Math for Water Technology MTH 082 (pg. 468)
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Multiple Barriers, Multiple Exposures Perspectives from the North and the South.
Flow From a Faucet, Flushing a Service Line, 90 th Percentile Lead and Copper Rule, Copper Sulfate Application Rates in Waterworks Operation Math for Water.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
Willamette Water Treatment Plant
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Drinking Water and the Lake There are 40+ plants utilizing Lake Michigan Water Illinois, Wisconsin, Michigan, Indiana Sizes of 1 MGD to 1 BGD Designed.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
NYC Water Supply System Overview How does NYC get the water it needs? Or How big is NYC’s water footprint? How does NYC get the water it needs? Or How.
Balancing Supply and Demand
Dissolved Air Flotation Introduction Dissolved air flotation Dissolved air flotation (DAF) is a process for the removal of particles/flocs by making the.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
CE 370 Introduction to Water and Wastewater Treatment Plants
1 Filter Backwash Recycling Rule FBRR Final: June 8, 2001.
Water Supply and Sewage Year 7 Unit 4.4. Water debate Is it ok to drink recycled sewage? Is it ok to drink recycled sewage? With Australia in the grips.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Introduction to Environmental Engineering Code No. (PE389) Lec. 5 and 6.
BCE Environmental Engineering Water Treatment Mdm Nur Syazwani binti Noor Rodi.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Water Treatment Processes. Why do we need to treat our drinking water?  Industrial runoff  Agricultural runoff  Road runoff  Residential runoff.
Water treatment Lilly Corradi.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Processing, distribution and use of water.
The Drinking Water Treatment Process
Dr. Joel J. Ducoste, North Carolina State University, 1 Importance of water “Water is life” Looking at water, you might think that it's the most simple.
Human Waste Disposal  More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water.  Natural Processes.
Water in the Community: From Lake Ontario to us Thursday, March 25 th.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Water Treatment: Introduction Suzette R. Burckhard, PhD, PE Civil and Environmental Engineering South Dakota State University Engineering the Future 2014.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
Drinking Water Quality and Health
Water Treatment Plant Austin and Alison.
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
Water and Wastewater Treatment
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
The Los Angeles Aqueduct Filtration Plant An Overview of Facilities and Operations.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
ENVIRONMENTAL SCIENCE 5.4 The Waterworks. At the Waterworks When reservoirs or rivers are the source of drinking water, the water must be treated to remove.
Safe, Clean and Drinkable
Water Filtration Plant Improvements Project Summary
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
NYC Water Supply System Overview
Wastewater Treatment Dr.Gulve R.M..
Lecture # 11 Water treatment:.
Pilot testing services and a case study to reduce organics Devendra Borikar, Laura Zettler, Jeff Avedesian, Lindsay Ariss, Luc Léonard, Denis Dolbec,
Enhancing Rapid Sand Filtration by Backwashing with Alum
ENG421 (4c) – Water Quality Management
ENG421 (5c) – Water Treatment Plant Costs
Presentation transcript:

Water Treatment for NYC Croton Schematic

NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration ä Where should the plant(s) be located? ä Multiple plants or one plant? ä Treatment steps at different locations? ä Design flow ä Treatment scheme ä Backwash water ä Filtration avoidance criteria ä Alternatives to Filtration ä Where should the plant(s) be located? ä Multiple plants or one plant? ä Treatment steps at different locations? ä Design flow ä Treatment scheme ä Backwash water 

Safe Drinking Water Act Turbidity Loophole ä At no time can turbidity (cloudiness of water) go above 5 nephelolometric turbidity units (NTU) ä Systems that filter must ensure that the turbidity never exceed 1 NTU, and must not exceed 0.3 NTU in 95% of daily samples in any month ä At no time can turbidity (cloudiness of water) go above 5 nephelolometric turbidity units (NTU) ä Systems that filter must ensure that the turbidity never exceed 1 NTU, and must not exceed 0.3 NTU in 95% of daily samples in any month

NYC DEP Data Interpretation ä As of 2001 NYC only reports monthly average turbidity ä “The MCL for turbidity is the monthly average rounded off to the nearest whole number” ä “Data presented are range and averages of monthly averages” ä As of 2001 NYC only reports monthly average turbidity ä “The MCL for turbidity is the monthly average rounded off to the nearest whole number” ä “Data presented are range and averages of monthly averages” Average turbidity (NTU) CrotonDelaware Catskill

Criteria for Avoiding filtration Criteria for Avoiding filtration ä The turbidity level cannot exceed 5 NTU (measured as specified in § (a)(4) and (b)(2)) in representative samples of the source water immediately prior to the first or only point of disinfectant application unless: (i) the State determines that any such event was caused by circumstances that were unusual and unpredictable; and (ii) as a result of any such event, there have not been more than two events in the past 12 months the system served water to the public, or more than five events in the past 120 months the system served water to the public, in which the turbidity level exceeded 5 NTU. An ‘‘event’’ is a series of consecutive days during which at least one turbidity measurement each day exceeds 5 NTU.

Limited Alternative To Filtration ä States may allow unfiltered water systems with surface water sources to use treatment other than filtration ä In order to qualify for alternative treatment, a water system must have an __________, ____________ watershed in consolidated ownership and have control over access to and activities in the watershed ä The alternative treatment must ensure _________ removal or inactivation efficiencies of pathogenic organisms than would be achieved by the combination of filtration and chlorine disinfection required by section 1412 (b)(7)(C). [1412(b)(7)(C)] Sec. 106 ä States may allow unfiltered water systems with surface water sources to use treatment other than filtration ä In order to qualify for alternative treatment, a water system must have an __________, ____________ watershed in consolidated ownership and have control over access to and activities in the watershed ä The alternative treatment must ensure _________ removal or inactivation efficiencies of pathogenic organisms than would be achieved by the combination of filtration and chlorine disinfection required by section 1412 (b)(7)(C). [1412(b)(7)(C)] Sec. 106 uninhabited undeveloped greater

§ Criteria for Avoiding Filtration § Criteria for Avoiding Filtration ä The public water system must demonstrate through ownership and/or written agreements with landowners within the watershed that it can control all human activities which may have an adverse impact on the micro-biological quality of the source water. The public water system must submit an annual report to the State that identifies any special concerns about the watershed and how they are being handled; describes activities in the watershed that affect water quality; and projects what adverse activities are expected to occur in the future and describes how the public water system expects to address them.

Should NYC have to Filter? ä Pro ä ä Con

Croton Plant ä The construction costs of the water filtration plant, with a design capacity of 290 million gallons per day (mgd), and the related facilities, is estimated at $660 million. ä Annual operations and maintenance costs are projected to be $11 million. ä The plant will use state-of-the-art disinfection and filtration processes including dissolved air flotation for the removal of solids, ozonation for primary disinfection, and biologically active carbon filtration. ä The construction costs of the water filtration plant, with a design capacity of 290 million gallons per day (mgd), and the related facilities, is estimated at $660 million. ä Annual operations and maintenance costs are projected to be $11 million. ä The plant will use state-of-the-art disinfection and filtration processes including dissolved air flotation for the removal of solids, ozonation for primary disinfection, and biologically active carbon filtration. To treat Delaware Catskill water

Croton Treatment Scheme

Croton Plant

Where Should Plant(s) Be Located for Catskill/Delaware? ä ___________________________________ ___________________________________ ä ___________________________________ ä ___________________________________ ___________________________________ ä ___________________________________ Between last watershed reservoir (Kensico) and distribution reservoir (Hillview) Near tunnel On hydraulic grade line! (No pumps) Commercial/Industrial area (not residential)

Design Flow for Water Treatment Plant ä Max day ever was 94 m 3 /s in 1975 ä Future growth? ä Conservation? ä Croton system is separate ä Proposed filtration plant for 12.7 m 3 /s ä Ability to shut down Croton system? ä Catskill/Delaware designed for 83 m 3 /s ä Max day ever was 94 m 3 /s in 1975 ä Future growth? ä Conservation? ä Croton system is separate ä Proposed filtration plant for 12.7 m 3 /s ä Ability to shut down Croton system? ä Catskill/Delaware designed for 83 m 3 /s

Maximum Daily Flow year Maximum daily demand (m 3 /s) Catskill/Delaware Croton

Treatment Plant Options for NYC ä NYC’s water is high quality (<2 NTU) ä Low particle concentration means that ___________ ______ aren’t necessary ä Three options for WTP with high quality surface waters ä Direct Filtration ä Contact Filtration ä Ultraviolet disinfection (selected by NYC) ä NYC’s water is high quality (<2 NTU) ä Low particle concentration means that ___________ ______ aren’t necessary ä Three options for WTP with high quality surface waters ä Direct Filtration ä Contact Filtration ä Ultraviolet disinfection (selected by NYC) sedimentation basins

Direct Filtration Screening Rapid Mix Flocculation Filtration Disinfection Storage Distribution Raw water Alum Polymers Alum Polymers Cl 2 sludge

Contact Filtration Screening Rapid Mix Filtration Disinfection Storage Distribution Raw water Alum Polymers Alum Polymers Cl 2 sludge

UV Disinfection ä Kills pathogens ä Does not reduce turbidity ä May be approved as an alternative to filtration for NYC Catskill/Delaware water supply ä Costs much less than a filtration plant ä Kills pathogens ä Does not reduce turbidity ä May be approved as an alternative to filtration for NYC Catskill/Delaware water supply ä Costs much less than a filtration plant

Size of Major Unit Processes Unit ProcessParameterRange Flocculation  min SedimentationQ/A s 0.67 m/hr FiltrationV a m/hr Los Angeles - _______ Unit ProcessParameterRange Flocculation  min SedimentationQ/A s 0.67 m/hr FiltrationV a m/hr Los Angeles - _______ 37 m/hr

Backwash Requirements U FB B Total filter bed area Useable production (or area) Production used for backwash Filter beds off line to be backwashed A T = A U + A FB + A B

Area of Filter Beds in Useable Production (U) ä Plant Design Flow ä 83 m 3 /s ä Area required without backwash (V a = 25 m/hr) ä Backwash requirements? ä 10 minutes at 50 m/hr once every 12 hours ä assume 30 minute downtime for backwash ä The useable filter bed area must be increased by 5 – 10% to meet backwash requirements ä Plant Design Flow ä 83 m 3 /s ä Area required without backwash (V a = 25 m/hr) ä Backwash requirements? ä 10 minutes at 50 m/hr once every 12 hours ä assume 30 minute downtime for backwash ä The useable filter bed area must be increased by 5 – 10% to meet backwash requirements 36.4 ha site ha=10,000 m 2

Backwash Water Disposal Options ä Backwash water production ä Approximately 3% of useable production! ä Often not recycled because of potential concentration of pathogens ä Will be recycled at the Croton filtration plant ä Solids production ä particles present in raw water ( mg/L) ä coagulant ( mg/L) ä Disposal options ä Backwash water production ä Approximately 3% of useable production! ä Often not recycled because of potential concentration of pathogens ä Will be recycled at the Croton filtration plant ä Solids production ä particles present in raw water ( mg/L) ä coagulant ( mg/L) ä Disposal options

Area of Flocculation Tanks ä Hydraulic retention time of minutes ä Los Angeles uses 8 minutes ä Typical depth of 5 meters ä Area required for flocculation will be similar to that required for filtration ä Contact filtration would eliminate the need for flocculation tanks ä Hydraulic retention time of minutes ä Los Angeles uses 8 minutes ä Typical depth of 5 meters ä Area required for flocculation will be similar to that required for filtration ä Contact filtration would eliminate the need for flocculation tanks

Summary ä NYC is designing an ultraviolet disinfection plant (with 2009 target for operation) ä The WTP will be constructed somewhere between Kensico and Hillview Reservoirs ä The WTP will be designed to handle recent peak daily flows ä NYC is designing an ultraviolet disinfection plant (with 2009 target for operation) ä The WTP will be constructed somewhere between Kensico and Hillview Reservoirs ä The WTP will be designed to handle recent peak daily flows

Supply Aqueducts and Tunnels Catskill Aqueduct Delaware Aqueduct East Delaware tunnel West Delaware tunnel Shandaken Tunnel Neversink Tunnel

Kensico to Hillview Catskill Aqueduct Catskill Aqueduct Delaware Aqueduct Delaware Aqueduct

Possible Water Treatment Plant Site Kensico

1 km 90 acre site 36.4 ha ha=10,000 m 2 Close to Catskill and Delaware Aqueducts Possible Water Treatment Plant Site