Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

M. Noy. Imperial College London Calice MAPS Adapter Card Review M. Noy 26 th June 2007.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 8 Monday 2/5.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold,
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMOS Circuit Design, Layout and Simulation
WEEK 1 You have 10 seconds to name…
Slide 1UCSB ASIC BiWeekly Status Meeting 25 Pixel Array Status 19 November 2003 Sam Burke Sean Stromberg UCSB HEP Group.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication/ Test –Gate Generator (Jimmy) à Synchronized.
CDMS II Shielding To Installation To Construction From Design.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
continued on next slide
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
                                                                                                                                                                                                                                                
UCSB Testing Status Anthony Affolder
continued on next slide
continued on next slide
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
Hybrid & Module Electrical Testing
US Module Testing Progress Report
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Around the room Orders of operations.
US Module Testing Progress Report
Equipment Status ARCS equipment status DAQ equipment status
continued on next slide
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
continued on next slide
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress 4Hybrid Test System moved into Clean Room Cold Box software integrated with ARC software Interface testing carried out on LVDS/CMOS Converter with unit in NIM Crate

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Cold Box in Clean Room

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 3 ARC Test Systems

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE LVDS / CMOS Testing

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Test Pitch Adapter Pulser Function Test 4 Hybrids with Pitch Adapters