Wednesday, October 3, 2007 Panel Presentation CPPC Forum 2007, Calgary.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Managing Construction Risks
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
The purpose of the facility is to provide a state-of-the-art 300-bed replacement for the aging Matsqui-Sumas-Abbotsford (MSA) General Hospital. The facility.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
Time for a new standard - AS General Conditions of Contract
Conditions of the Contract for Construction
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
RISK AND RISK MANAGEMENT. OVERVIEW DEFINITIONS RISK MANAGEMENT PROCESS ROLES AND RESPONSIBILITIES OF PROJECT PARTICIPANTS RISK MANAGEMENT TOOLS LIABILITY.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Construction Engineering 221 Cost Estimating and Bidding.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Surety Bonds The Sensible Choice For Managing Risk.
MEDICARE SECONDARY PAYER ACT Mandatory Reporting Requirements.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
Honoraria for Design Build Projects Methodology Assessment Matrix.
REGULATORY LEGAL AND CONTRACTUAL ASPECTS OF PPP IN WATER AJAY RAGHAVAN Counsel Training Workshop, Bhopal, February 2009.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Standards of Practice Course
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Construction Contracts What You Need to Know March 19, 2015.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Date: 16 April 2010 Adapting FIDIC Standard Forms for Local Conditions and Regulations TCDPAP Annual Conference - '‘New Approaches and Solutions for Consultancy.
IDENTIFYING THE STRENGTHS & WEAKNESSES OF YOUR CONSTUCTION PROJECT McCune Construction Services Group, L.C.C.
Public Procurement Procedure – Bidding Documents
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
University of Calgary Continuing Education Construction Contract Law and Documents Week 9 Review of Law Standard Contract Documents.
CONSTRUCTION CONTRACTS DOCUEMENTS
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Copyright © 2007 Pearson Education Canada 1 Chapter 21: Completing the Audit.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Public Procurement Principles and Applications Basic Level: Trainer’s Manual Inter – American Development Bank Chapter 4: Procurement of Works December.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
May 5, 2016 May 5, Reporting obligations for  Investment banks,  Stockbrokers and dealers  FM and Investment advisers 2. Publication financial.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
The Value of a Knowledgeable Construction/Surety Attorney
Value-Based Contracting- It’s Not Just Price Anymore
Yukon Government 3rd Annual Industry Conference
University of Calgary Continuing Education
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
CM at Risk v. Design-Bid-Build
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Directed Change Constructive Change
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Wednesday, October 3, 2007 Panel Presentation CPPC Forum 2007, Calgary

Panel Presentation Who is CCDC? Introduction to the “new” CCDC-2 Panel Presentation – Key Risks Q&A Terry Brown – Contractor & CCA Rep Gregory Hersen – Lawyer & Bar Assoc. Rep Ron de Vries – Owner Rep

Who is CCDC? Canadian Construction Association Royal Architectural Institute of Canada Association of Consulting Engineers of Canada Construction Specifications Canada

Who is CCDC? Public Sector Owners Legal Representation Member - Canadian Bar Association Private Sector Owners

CCDC Mandate “CCDC is responsible for the development, revision and improvement of Canadian standard construction documents used by Owners, Consultants, Contractors and other participants in both public and private sectors throughout Canada.”

Why Use CCDC Documents? Relied on as industry standards. Provide balance, uniformity and standardization for bidding and contract procedures. Fair allocation of risks and protects the rights of all parties equitably. Developed in collaborative environment. Unbalanced contracts increase risk of claims and disputes. Industry wide endorsement - CCDC sells over 50,000 documents annually.

Document Development 1. Draft is prepared by working group 3. Draft is submitted to constituent organizations 2. Reviewed in detail by Committee 4. Final document issued for endorsement

What’s special about CCDC Documents? CCDC Documents have endorsement from all of the constituent member organizations and are applicable to a broad range of construction industry use.

CCDC Documents CCDC Stipulated Price Contract CCDC Cost Plus Contract CCDC Unit Price Contract CCDC 9a & 9b Statutory Declaration CCDC Contractor’s Qualification CCDC Project Financial Info CCDC Civil Works Contract CCDC Guide to Use of CCDC 2

CCDC Documents CCDC Guide to Construction Insurance CCDC Guide to Construction Surety Bonds CCDC Guide to Calling Bids and Awarding Contracts CCDC Guide to Model Forms and Support Documents CCDC Rules for Mediation and Arbitration of Construction Disputes

CCDC Documents CCDC Guide to Use of CCDC 3 CCDC Guide to Use of CCDC 18 CCDC 220 – 2002 Bid Bond CCDC PerformanceBond CCDC Labour & Material Payment Bond

Documents Under Review CCDC 2 – Stipulated Price Contract CCDC 4 – Unit Price Contract CCDC 5A & 5B – Construction Management Contracts CCDC 14 – Design-Build Contract CCDC 15 – Design-Builder/Consultant Contract CCDC 20 – Guide to use of CCDC-2 CCDC 45 – Guide to Construction Management CCDC 46 – Guide to Design-Build

CCDC Documents

Introduction to the new CCDC - 2 Overview: Editorial updates to the 1994 version. Significant changes to key provisions. Indemnification Waiver of Claims Roll-out by end of 2007 CSC Training Sessions

CCDC 2: Stipulated Price Contract Introduces concept of mutual indemnification between Owner and Contractor. Consultant removed. Introduces limits of liability. GC 12.1: Indemnification

CCDC 2: Stipulated Price Contract Owner/Contractor Indemnify and hold harmless each other against Nature of the Claims Monetary Limitation Time Limitation Direct ClaimsInsured and uninsured claims Contract Price, but no less than the greater of $2M and the insurance limit, and no more than $20M Shorter of 6 yrs from the date of Substantial Performance of the work and provincial limitation statute Third-Party Claims Relating to bodily Injury or Property Damage Insured Claims No Limit Uninsured Claims No Limit

CCDC 2: Stipulated Price Contract EXCEPTIONS Owner Indemnifies the Contractor Nature of the Claims Monetary Limitation Time Limitation Toxic/Hazardous Substances Presence prior to the Work No limitNo time limitation Infringement of a patent of invention Supplied to the Contractor No limitNo time limitation Lack of or defect in title No limitNo time limitation

CCDC 2: Stipulated Price Contract GC 12.2: Waiver of Claims Concept of mutual waiver Waiver period limit established – 6 days before expiry of the lien period. Now Substantial Performance vs. Final Certificate for Payment. Exceptions Claim for which a lien may be asserted and others …

Panel Presentation – Key Risks Contractors Perspective Timely & Full payment. Owner’s Consultant Team Contract Security & Insurance Mould Indemnification & Waiver of Claims

Panel Presentation – Key Risks Legal Perspective Qualified bids. Inappropriate use of supplementary conditions to CCDC. Failure to keep proper documentation for dispute resolution. Insufficient or inappropriate contract security. Non-compliant bids. Inappropriate use of bidding processes, ie. RFP’s v. Tenders

Panel Presentation – Key Risks Owner Perspective Quality of bid documents. Accuracy of estimates. Funding uncertainty and phasing. Attracting bidders. Qualified or non-compliant bids. Contractor performance – quality & time. Construction site safety – “constructor”. Contract changes. Contract completions.

Panel Presentation – Key Risks Owner Perspective Quality of bid documents. Enhanced communication with A&E firms during the preparation of contract documents. Bid-ability & build-ability reviews before tender. Restricted amendments within 5 days of closing.

Panel Presentation – Key Risks Owner Perspective Accuracy of estimates. Funding uncertainty and phasing. Currently a serious risk. Must factor in market conditions. Build in alternates to ensure award. Retain professional quantity surveyors/estimators. Build in contingencies to project funding. Better understanding of the accuracy of estimates.

Panel Presentation – Key Risks Owner Perspective Attracting bidders. Ensuring adequate funds are available. Appropriate packaging of work. Using bid documents that are familiar to the industry. Maintaining productive relationships. Ensuring payment. Track response to bids and follow-up with plan-takers to find out why they did not bid. Provide bid documents to Association Plans Rooms.

Panel Presentation – Key Risks Owner Perspective Qualified or non-compliant bids. Waiver of non-compliance clause. Use industry standard documents. Ensure terms and conditions are appropriate to the target industry. Pre-tender site visits and briefings.

Panel Presentation – Key Risks Owner Perspective Contractor performance – quality & time. On-site inspections and QA program. Pre-qualification for specialized work. Bond or security for all contracts >$100K Mandatory schedule with progress payments. Aggressive completion performance targets. Contractor Performance and Evaluation Review (CPER) on 100% of contracts. Restricted bidders list.

Panel Presentation – Key Risks Owner Perspective Construction site safety – “constructor”. Safety section in the contract documents to clearly define responsibilities. Safety inspectors. Work closely with provincial authorities.

Panel Presentation – Key Risks Owner Perspective Contract changes. Currently average 11% of contract award value. Part of corporate performance measure. Rigorous scope management. Includes extension of time & costs if warranted.

Panel Presentation – Key Risks Owner Perspective Contract completions. Establish realistic completion dates in the contract. Set corporate targets for timeliness of substantial and final completions. Rigorous monitoring of schedule. Progress payments tied to schedule reviews. Early intervention for problem contracts. Use of contract funds to complete deficiencies.